Loading…
Loading…
3,660 results • Best match
Survey, investigation and preparation of DPR for the pressurized pipe irrigation network for development of enroute command of Ken Link Canal through PH2 and PH3 in Chhatarpur district, having CCA 62730 Ha under GCA 78414 ha. under the Ken Betwa Lin
Pre Mansoon Maintenance and Servicing work of Omkareshwar Control Structure (OSP) Irrigation Canal Gates (2 Nos Service and 2 Nos Emergency) and CHPH Gate(2 Nos Service and 2 Nos Emergency) at Omkareshwar Dist. Khandwa for the year 2021-22
Construction of Gungidevi Tank Earthen Dam (Without Canal) across Local Nalla near village Rukhibawdi Tehsil Gandhwani, Distt. Dhar (M.P.) for least gross storage capacity of 4.67 Mcum water and 830 Irrigation in Hact. area on Turnkey basis as per de
General Maintenance (Oiling and Greasing) of CWC Canal, C.R. and H.R. Gate and Purwa Canal H.R. C.R. and Escape Gate.
Balance work of Junwani Tank Scheme including Pitching, Lining of canal, Construction of structure, Water Courses and canal maintenance work.
Repair Work of CD canal L/S Bank and canal bed at RD 77800 M of CRMC on Percentage Baises.
Repair Of Slipped Portion Of Right Side Canal Bank Between Rd 20.00 Km To 25.00 Km Right Bank Main Canal.
REPAIR WORK OF RUDAHEDA DAM AND CANAL AND ITS STRUCTURE AT RBC, LBC AND CANAL EW OF MAHIDPUR SUB DIVISION
Removal of Silt from canal bed and Jungle Clearance of Kharkhadi distributory ch. 0 to 236 of Waraseoni Branch canal.
Reconditioning of Canal Chambers, Repairng of Filter Canal of Filter bed at W.T.P. Tighra File No. T-04/20x9/2
Removal of Silt from canal bed and Jungle Clearance of Kachekhani distributory ch. 10 to 236 of Waraseoni Branch canal.
Site clearance and removal of deposited earth canal bed of L.B.C. main canal of Jamuniya tank ch. 195.00 to 450.00
REPAIR OF CANAL BANK OF SAMARDHA DY AND 3R MINOR OF CHARKHEDA DY OF HANDIYA BRANCH CANAL IN DISTT HARDA
ASPHALTING OF ROAD AT ADARSH NAGAR NEAR CANAL PRADHAN MANDAPAM TO SAMUDAYIK BHAWAN HOSHANGABAD ROAD W-54 Z-13 second call
Repair work of gates of 36 No. canals of 22 No.s tanks of Datuni Medium Project under Water resource Subdivision Katafod of WR Division Dewas.
Work of Sluice Well Gate change and Jacketing, Earthwork in main Dam and Canal, Main Canal Lining, Canal Sectioning, Repairing of existing structures and Construction of VRB etc. work of Khaniamba Tank Project
FOR THE WORK OF REPAIR OF HEAD AND CROSS REGULATOR GATE OF PATAN BRANCH CANAL RD. 10.200 KM. AND PIPARIYA SUB DISBUTORY CANAL RD. 25.50 KM. OF LEFT BANK CANAL OF R.A.B.L.S. PROJECT
Con. of Rd from Richhoda (School) to Khiriya Kurmi Damadehi Rd Lng 2.5 Km.,Karitalai Jod to Richhoda Jod Lng 1.5 Km, Satramau to Khoha Rd Lng 1.20 Km and Chikhli Khiriya Rd (Canal Culvert)to Big Canal Chandla(Canal Culvert)via Small Canal lng 2.30 Km
Repair and Maintenance work of Left bank main canal at R.D. 63.42 km. to R.D. 81.30 km., Hareri Branch Canal R.D. 0.00 km. to R.D. 52.83 km., Kareli Distributory canal R.D. 0.00 km. to R.D. 14.86 km. and Deori Distributory canal R.D. 0.00 km. to R.D.
Due to Repair work of Rain cuts / Resectioning / Rat holes earth work of Lakhundar Dam at Lakhundar Canal Sub Divison, Maksi Distt. Shajapur
Repair work of 75HP motor kirloskar make, 75 HP ATS starter, 35HP submersible motor and its starters and allied equipment of Bardha Lift Irrigation scheme in kesla block, District Narmadapurm
Pre-monsoon repair and maintenance of Kerwa Medium Irrigation Project
ELECTRIFICATION WORK OF E-TYPE QUARTER AT IRRIGATION COLONY, MANDSAUR
Bunding work of satpada barrage for Rabi Irrigation 2023-24
Pre-monsoon repair and maintenance of Kerwa Medium Irrigation Project.
ANNUAL REPAIR OF HEAD WORK OF BAHORIBAND TANK (KHARIF IRRIGATION)
Construction of Wire Fencing work at Bham Medium Irrigation Project.
Renewal of Asfalt Road From Hospital to irrigation rbc coloney.
Construction of Tar Road in Irrigation Colony Diversion Road Khargone
Construction of Kayampur-Sitamanu Pressurized Micro Lift Major Irrigation scheme
Mechanical Work at Sajali Medium Irrigation Project Dist Damoh (M.P.)
Rehabilitation and Improvement of Mansurwari Medium Irrigation under Drip II
Mechanical Work at Satdharu Medium Irrigation Project Dist Damoh (M.P.)
FOR THE WORK OF REPAIR OF HEAD, CROSS REGULATOR AND ESCAPE GATE OF MAJHOLI DISTRIBUTORY CANAL RD. 7.230 KM. AND SIHORA DISTRIBUTORY CANAL RD. 10.03 KM. OF RIGHT BANK CANAL OF BARGI DIVERSION PROJECT.
Balance work of special repair work of Pandhana distributary extension case (Siltiya and Balkhad minor) of Bhagwant Sagar (Sukta) Project Distt Khandwa
Construction of D.W.C. Pipe of Kagalkho Minor of Math-Math Sub Distributary of L.B.C. of Mahi Project, Tehsil Petlawad, District Jhabua (M.P.)
Reconstructing rock toe, Repair and maintenance of canal and canal structure of Malghan, Chakra and Chakarbhata Tank scheme District-Panna (MP)
Repair work of damaged canal and C.D. of 20 L Minor of Right Bank Canal of Dahod Minor Project Distt. Raisen
Repair and maintenance of Total 14 Nos Canal Gate Under Chhapi Canal and 01 No. Escape gate under WRD Division Rajgarh
for silt clearance and removal of deposited earth canal bed of L.B.C. main canal of Jamuniya tank ch. 0 to 195
REPAIR AND MAINTENANCE WORK OF AQUADUCT AND 05 NOS. CANAL GATES AT MAHI RBC CANAL UNDER WR DIVISION NO.1 JHABUA.
Special Repair Work of E/W, Structure and Canal Lining of Main canal of Bhikarkhedi Tank Sub-Divisional Segaon Distt Khargone
Repair of damaged structures of main canal and minors/ subminors between RD 12.00 to 21.00 km of Handiya Branch canal system.
ANNUAL MAINTENANCE (OILING AND GREASING) OF CWC CANAL CR, HR AND ESCAPE GATE AND SIHAWAL CANAL CR, HR AND ESCAPE GATE
WORK OF REPAIR CANAL SLUICE GATE NO. 2 OF LEFT BANK CANAL BLOCK NO. 3 OF R.A.B.L.S. PROJECT BARGI NAGAR JABALPUR.
Repair work of L.B.C. Canal syphon at RD 7563m of paronch tank
purchase of Aluminum Irrigation Pipe with Nozzle at ICAR Directorate of Weed Research Jabalpur 482004
Ordinary repair of Canal Structure of Dhangaon Tank
Canal lining work at Besla tank (Special Repair)
ANNUAL REPAIR AND MAINTENANCE OF MADWAGHAT TANK CANAL