Loading…
Loading…
3,686 results • Best match
Repair of Harsi Main Canal RD 25.600 Km. to 55.500 Km and its Distributory etc including management operation and maintainance (MOM) for 2 years.
Annual Maintenance (Oiling and Greasing) of C.R. Escape and H.R. Gate installed at various places of Bansagar CWC and Sihawal Canal of Bansagar Project.
Repair and Maintenance of Sihawal Canal HR Gate (Size 5.00 x 4.25)M 03 No. at RD 0.00 Km (10 Ton Electrically Operated Hoist).
Special Repair work of Barvet Tank No. 1 Canal Cross Drainage at RD 135 m. and 1025 m. Tehsil Petlawad District Jhabua Madhya Pradesh
Repairing and Reconditioning work of Panwa Distributry Minor-Lm1 Sub-Minor Gates (Rsm1,Lsm1,Lsm2) of R.B.C. Main Canal At Jeerabad District Dhar (M.P.)
On Turn Key Basis Construction of jalhali minor tank project (with canal) as per details in scope of work but not limited to that.
Pre monsoon repair and maintenance of R.B.C. gates, Feeder canal gate, cross regulator gate, Do-ab H.R. gate at Mohini Pick Up Weir Narwar.
Repair and Reconditioning, of C.R.Gate at R.D. 1.0 Km and H.R.Gate at R.D. 5.9 Km of ISP Main Canal at Narmada Nagar Dist. Khandwa
Repairing and Reconditioning work of Manawar Distributry at RD 16270, (Size of gate 1000mm x 800mm) of R.B.C. Main Canal At Jeerabad Distt-Dhar
Survey and Investigation of Basin and Command Area for Shri Gudhar and Chirohla Tank Head Work and Canal Scheme Block Rithi Distt Katni MP
Special Repair Work of C.C.Lining of RBC Main Canal R.D. 888m. to 1211m. of Utawad Tank Project Sub-Division Kasrawad Distt Khargone (2nd Call)
Disposal of perishable and unserviceable stock and T and P items lying in store and building of office of Subdivision of Keoti Canal division.
On Turnkey Basis Construction of Gidurhai Tank and Canal System including all components, as per detailed scope of work but not limited to that.
Reconstruction of aqueduct old time worn syphon at RD 2100 m of main canal of Taklikheda Tank Tehsil-Khategaon District Dewas M.P. under SDMF
Repairing and Reconditioning work of Panwa Distributry of Rm1-sub -Minor and Lsm2-Sub-Minor of R.B.C. Main Canal at Jeerabad District Dhar (M.P.)
Annual operation and maintenance of gates of Beehar Barrage, Head regulator and tail and cross regulator gates of link canal of THP, MPPGCL, Sirmour
Pre Mansoon Repair Maintenance of sluiceH R gates of minor tanks of Bilgaon underBilgaon H W Sub Dn Bilgaon Canal Sub Dn Shahpura Dindori
Repair and Maintenance of Sihawal Canal HR Gate (Size 2.00 x 3.90)M 05 No. at RD 15.24 Km (6 Ton Electrically Operated Hoist).
FOR THE WORK OF REPAIR OF CROSSREGULATOR AND ESCAPEGATE OF MAJHOLI TAIL DISTRIBUTORY RD. 10.89 KM. OF RIGHT BANK CANAL OF BARGI DIVERSION PROJECT.
Repair and Maintenance of Sihawal Canal Escape Gate (Size 1.75 x 2.00)M 03 No. at RD 72.895 KM ( 6 Ton Manually operated Hoist).
Disposal of unusable and Decayable TandP and Survey and Mathematical Instruments lying in store of Bansagar Vitarika Subdivision no. 02 of Keoti Canal Division.
Repairing and Reconditioning work of Panwa Distributry of Rsm2-sub-Minor and Rsm3-Sub-Minor of R.B.C. Main Canal at Jeerabad District Dhar (M.P.)
FOR THE WORK OF REPAIR OF HEAD REGULATOR GATE OF LEFT BANK MAIN CANAL R.D. 12.17 KM. TO R.D. 41.94 KM. OF R.A.B.L.S. PROJECT
WORK OF PAINTING OF AUTOMATIC TILT GATE WITH FOOT BRIDGE AND STRUCTURE OF RIGHT BANK MAIN CANAL RD. 49.100 KM. OF BARGI DIVERSION PROJECT.
Special Repair work of P.C.C. Lining from RD 60 M to 486 M of Minor No.-3 of Main Canal of Sudra Minor Project.
Construction of Cement Concrete Lining Between RD 0 to 5580m Of Main Canal And RD 0m to 1710m of Minor Of Saikheda Tank Project.
FOR THE WORK OF REPAIR AND PAINTING OF FOOT BRIDGE OF PATAN BRANCH CANAL RD. 0.00 KM. TO RD 10.00 KM. OF R.A.B.L.S. PROJECT
FOR THE WORK OF FABRICATION AND ERECTION OF DECK RAILING AND LADDER AT CROSS AND HEAD REGULATOR GATES OF BHADGAWA BRANCH CANAL R.A.B.L.S. PROJECT.
FOR THE WORK OF REPAIR OF HEADREGULATORGATE OF MAJHOLI BRANCH CANALRD. 0.750 KM. TO RD. 17.24 KM.OF RIGHT BANK CANAL OF BARGI DIVERSION PROJECT.
Shifting of 11KV and LT Line (at Village Khajra Harchand) affected by submergence of Hanota Irrigation Project District Sagar (M.P.). Complete work with material and labour at work site as per G Schedule and direction of Engineer. in charge
Tender For The 11KV Sajwani Canal Bifurcation Feeder Under Barwani (R) D/c and Feeder ID 632223 under O n M Dn. Barwani, Administrative App. No. MD/WZ/08-03/12348/ Indore 04.08.25
Repair of Benegaon Distry. ch. 0 to 65 and 96 to 123, Warafeedar canal between ch. 0 to 65, Datta Distry. ch. 0 to 50, Wara main canal ch. 40 to 80, Murkuda minor ch. 20 to 90 Badgaon minor no. 1 ch. 0 to 106, Dahedi minor ch. 0 to 15, Katangi minor
Estimate for Installation of 25 KVA DTR for irrigation Purpose Mr. Bhairo Singh Meena DS2023092802 at Village Silari under Gurra D/C under O and M Division Itarsi
On Turnkey Basis Construction of Mohanpura left bank extension - II pressurized pipe irrigation system under mohanpura project, as per detailed scope of work but not limited to tha
New Erection balance work of 11 KV line over Head Cabling work with providing and Installation of VCB including 200 KVA Transformer at Chakarpur Medium Dam Irrigation Project
Shifting of 11 KV Line with 25 KVA DTR (01 Nos) of Bahrol Nursery of Forest Department affected by Submergence area of Banda Irrigation Project District Sagar (M.P.)
Shifting of 11 KV Line (AG and DL) near at village Bodapipriya to Dhudoniya affected by Submergence area of Aapchand Irrigation Project Complete work with material and labour
Shifting of 11 KV Patna Tamoli Feeder Electric Line (at Village Sathaniya) affected by contraction of Pump House/Sub Station of Pawai Pressuriesed Irrigation Project District Panna (M.P.)
Construction of RCC Bridge with all its components accross ken river on Bisani-Deora Road affected under submergence of Pawai Medium Irrigation Project, block shahnagar District-Panna (MP)
Shifting of 33 KV Line affected by Submergence area of Runjh Medium Irrigation Project District Panna complete work with material and Labour charges work at site as per
New Erection Work of 33 KV Line From Substation BANDA to Pump House 1 Including Additional Bay Feeder with Metering Equipment at Pump House of Banda Irrigation Project.
Repair Work of 01 No. Feeder Gate and 03 No. Escape Gate (Size of Each Gate 1500x1500mm) of Bila Medium Irrigation Project of WRD Sagar Distt Sagar (M.P.)
electrification of irrigation 05 HP Pump connection to Shri Hukam Singh Shakya So Shri Ochha Shakya at village Hariban ka pura under Alapur Dc Under (OandM) Division sabalgarh
New Erection Work of 33 KV Line From 132 KV EHV Substation BANDA Pump House 3 Jagthar Including Metering Equipment at Pump House (PH3) of Banda Irrigation Project
On Turnkey Basis Construction of Barrage and Pressurised Pipe Irrigation system of Bani Harbakhedi Barrage Medium Project, as per detailed scope of work but not limited to that.
Estimate for electrification of irrigation 05 H.P. Pump connection to Shri Matadeen Dhanuk S/o Shri Ramcharan Dhanuk at village- Mamchoun Badi under Pahargarh D/c Division sabalgarh
New electrification work with providing and Installation of 63 KVA DTR 01 No. at Sajli Medium Dam Irrigation Project of District Damoh M.P. complete work with material and labour at work site as per G Schedule and direction of Engineer in charge
Construction of C.C. Road from Nandgaon- Khtyakhedi Marg to Kamlesh Meena ke Khet tak via Canal Road Length 1.50 Km
Shifting of 11KV Line at Village Khajuriya ,Bisraha (Bisloni DL Feeder) affeted by submergence of Hanota Irrigation Project District Sagar (M.P.) complete work with material and labour at work site as per G Schedule and direction of Engineer.in ch
Removal and disposal of old C.I. 250 mm dia. pipe line from old Filter (Vill. Konada) to Kastarbari canal Vill. Amal Zumal as per conditions of NIT including refilling and levelling of trench.