Loading…
Loading…
3,686 results • Best match
FOR THE WORK OF REPAIR OF CROSS REGULATOR AND ESCAPE GATE OF RIGHT BANK MAIN CANAL RD. 25.200 KM. OF BARGI DIVERSION PROJECT
Repair and Maintenance of Escape Gate (02 Nos.) Size (4.30 x 3.75)Mtr at R.D. 5.37 Km of Sihawal canal Under Bansagar Project
FOR THE WORK OF PAINTING OF AUTOMATIC TILT GATE AND STRUCTURE OF RIGHT BANK MINE CANAL R.D. 11.400 KM. OF BARGI DIVERSION PROJECT.
Repair and maintenance of 40 nos. Canal sluice gates from RD meter 1410L to RD meter 22128L of Rampur Dam, District Guna (M.P.)
Providing, fabrication and supply of stopdam gates size 1.50m x 3.00m- 5 nos for Narel Nala stopdam, Lahar canal branch Division, Dist. Bhind.
FOR THE WORK OF REPAIR OF HEAD REGULATOR GATE OF RIGHT BANK MAIN CANAL RD. 54.04 KM. (BILGAMA DISTRIBUTORY) OF BARGI DIVERSION PROJECT.
Repair work of Head Regulator RD 3120 M of RM 3 and RD 7290 M RM5 of Left Bank Canal of SAS Project
Repair for electrically operated 6 tonne capacity hoist gear assembly of mohaniya CR gate (02 nos.) at RD 5.25 km of purwa canal.
Premonsoon repair and maintenance of R.B.C gates, feeder canal gates, cross regulator gates, do-ab HR gates at Mohini pick up weir Narwar.
Shifting of 11 KV Line at Village Devra Affected by Submergence of Pawai Medium Irrigation Project District Panna (MP) complete work with material and labour at work site as per G Schedule and direction of Engineer.-in charge.
Repairing and Reconditioning work of Panwa Distributry of Rsm4-sub-Minor andLsm3-Sub-Minor of R.B.C. Main Canal at Jeerabad District Dhar (M.P.)
REGULATION ANDMAINTENANCE WORK OF C R AND H R GATES BY LABOUR IN HANDIYA BRANCH CANAL SYSTEM OF TAWA PROJECT IN DISTT HARDA
Providing 1x63 KVA Addl. DTR For Salve Voltage Problem of Irrigation Pump Connection at Village Pohi (Location Nathu Ke Khet Ke Pass) Under Amla (R) D/c
Repair and Maintenance Work of Dewatering System elements of Gallery including installed DG Sets with Head Sluice Gates at Pawai Medium Irrigation Project of Distt. Panna (M.P.)
Shifting of 11 KV Line at Village Sabdua (Devra-Bhapat Khasra No. 16 and 14) Affected by Diversion Chanel of Majhgay Medium Irrigation Dam District Panna (MP)
New Erection work of 11 KV Line form Bandari S/S to Rehabilitation Site of Pitholi Affected by Banda Irrigation Project Complete work with material and labour
Shifting of 11 KV Mudwari Feeder Electric Line (at Village Sathaniya) affected by contraction of Pump House/Sub Station of Pawai Pressuriesed Irrigation Project District Panna (M.P.)
Preparation of DPR including detailed Survey and investigation for dam and design of pressurized irrigation network for Shrimant Madhav Rao Scindia Major project in Kuno river basin.
Shifting of 11 KV Line (AG and DL) Including DTR Near at Village AAPCHAND TO BHESHVAHI affected by Submergence area of Aapchand Irrigation Project District Sagar (M.P.)
Shifting of 11 KV and LT Line with DTR at near village Hinota affected by Submergence area of Banda Irrigation Project Complete work with material and labour
On Turn Key Basis, Construction of Upper Burhner Project dam and Pressurized pipe irrigation network as per details in scope of work but not limited to that.
Providing and Erriction of Electrical and Mechanical Equipments for Operation of installed Head Gates of Diversion Channel (at Bariyarpur) of Majhgaye Medium Irrigation Project District Panna (M.P)
Shifting of 11KV Sitanagar DL line at Rehabilitated Village at Kalyanpura affected by submergence of Sitanagar Medium Irrigation Project. Complete work with material and labour at work.
Estimate for P.S to Mr. Vipin Galar for Irrigation Purpose at Installation 25 KVA DTR at Village Jujharpur under Pathrota D/C O and M div itarsi.
Pre-Monsoon repair and maintenance work of 09 nos. radial gates and 02 nos. head sluice gates of KCS Doodhi Medium Irrigation Project, Narsinghgarh, Distt. Rajgarh (M.P.)
Supply Erection of Entry Exit Gates with Chain Line Mesh Fencing at R and R Colonies including Rehabilitated Bahrol Thana Residental Building affected by Banda Irrigation Project.
On Turnkey Basis Construction of additional irrigation system in villages of Lateri from Tem medium project, as per detailed scope of work but not limited to that
On Turnkey Basis Construction of Dam Approach cum Banda-Bandri Diversion Road under Banda Irrigation Project, as per detailed scope of work but not limited to that.
P.S. to 7 No. 7x5 35 HP Pump Conn. For irrigation purpose for Shri Bansi/ Darshan and 6 No. other at Villae Doudi under Kesla D/c
Shifting of 11KV Line at village KHEJRA (Near Begumganj) affected by submergence of Madia Irrigation Project District Sagar (M.P.). complete work with material and Drawing labour at work site as per G Schedule and direction of Engineer.-in charg
Shifting of 11KV Line at village KOLUWA (Near Begumganj) affected by submergence of Madia Irrigation Project District Sagar (M.P.). complete work with material and Drawing labour at work site as per G Schedule and direction of Engineer in charge
Providing and Fixing of Cabling work for Operation of Head Sluice Gate of Satdharu Medium Irrigation Project Distt. Damoh (M.P.) complete work with material and labour at work site as per G Schedule and direction of Engineer.in charge
Repair of CC Lining work and its Structures of Narmadapuram Distry Canal between RD 0 km to 15.00 km Under Tawa Project Division Itarsi.
Fabrication, errection and testing of new gate situated at different places (From RD 1040 mtr to 14000 mtr) of mahidal distributory of purwa canal.
FOR THE WORK OF PAINTING OF CROSS REGULATOR, ESCAPE GATE AND HOIST STRUCTURE OF LEFT BANK MAIN CANAL RD. 4.82 KM. OF R.A.B.L.S. PROJECT.
FOR THE WORK OF REPAIR OF HEAD AND CROSS REGULATOR GATE OF PATAN BRANCH CANAL RD. 9.74 KM. TO RD. 14.00 OF R.A.B.L.S. PROJECT
Repaire of damaged wing walls of C.R.at ch 1971,C.D. at ch 2386 and H.R at ch 2247 of tawa left bank main canal
On Turnkey Basis Construction of Head work and canal work of Bersala Tank, as per detailed scope of work but not limited to that.
Strengthening Work 1. Bareh To A.B. Canal Road Length 0.40 Km., 2. Tareni To Durgadas Ki Garhi Road Length 0.20 Km. Total 0.60 Km.
Resectioning of Bank and construction of protection wall on 1L Distributory and VRB on 5L Distributory of Chambal right main canal on Percentage Basis.
FOR THE WORK OF REPAIR OF HEAD AND CROSSREGULATORGATE OF SHAHPURA DISTRIVUDORYCANAL RD. 0.00 KM. TO RD. 22.50 KM.OF PATAN BRANCH CANAL OF R.A.B.L.SPROJECT.
Repair work of CANAL structure at RD 10350m, RD 8110m, RD 8600m and RD 9810m damaged due to heavy rain of Bakud Tank Project
Construction of Balance Lining and repair of damaged lining work of Main Canal from R.D. 3840 M to 6800 M of Salabarru Minor Project
Construction of Balance Lining and repair of damaged lining work of Main Canal from R.D. 270 M to 3840 M of Salabarru Minor Project
Execution of balance work of Right Bank Main Canal from R.D. 129.00 km. to R.D. 154.00 km. of Bargi Diversion Project on TURNKEY BASIS.
FOR THE WORK OF REPAIR OF CROSS REGULATOR GATE AND STOPLOG GATE OF RIGHT BANK MAIN CANAL RD. 64.50 KM. OF BARGI DIVERSION PROJECT.
Repair work of hole at ch. 2203 of Dhuty left bank main canal and repair of structure and service bank of Mongolikala and minors.
WORK OF PAINTING OF AUTOMATIC TILT GATE WITH FOOT BRIDGE AND STRUCTURE OF RIGHT BANK MAIN CANAL RD. 49.100 KM. OF BARGI DIVERSION PROJECT.
FOR THE WORK OF REPAIR AND PAINTING OF CROSS REGULATOR GATE OF KUWAPUR MINOR RD. 10.30 KM. OF LEFT BANK CANAL OF R.A.B.L.S. PROJECT.
On Turnkey Basis Construction of Dam without canal of Markheda Gulab Minor Project, as per detailed scope of work but not limited to that