Loading…
Loading…
10,115 results • Best match
Construction of Box culvert on main canal at ch 465 to 665mt of Khadaki Minor Project Tal Navapur Dist Nandurbar
STBT to Vijay Baban Chaudhari House to Godavari Right canal Road Under Jalgaon Grampanchyat (1.5 Km) Tal- Rahata, Dist- Ahilyanagar
Construction of Additional Six Structure on Maldongri Minor RD 49350 M on Gosikhurd Right Bank Canal. Tah Bramhapuri, Dist Chandrapur.
To remove and rebuild the dangerous bridge over the New Canal on the Sasanenagar main road in Pune Peth Hadapsar.
Providing Flow Meter and M.S. Pipe and Other Mic. work for Pipe Distribution Network work of Navegaonbandh Feeder Canal Scheme.
Providing Material For Constructing and Metalling From Kukadi Canal to Pawar Wasti Panand Rasta Under MREGS at G.P. Wadgaon Tanpura.
Providing and Laying Paving Block at ward No 8 58 Fata Canal to Waghmode Thorat Wasti in Malshiras, Dist Solapur
Tailing Works of Sarandi minor no.1, Dhamni minor, Bramhi Minor and Rajani Minor and on Left Bank main Canal
Construction of Villege Road Bridge at Ch. No. 11.470 in KM 12 on Banda Branch Canal Tal - Sawantwadi, Dist - Sindhudurg.
CONSTRUCTION OF MINIOR BRIDGE ACCROSS CANAL ON ARNI TALANI ROAD IN KM 198/00 SH 273 TQ ARNI DISTT YAVATMAL
CONSTRUCTION OF W.B.M. ROAD FROM H/O GAJANAN TALMALE TO CANAL IN PRABHAG NO. 7 AT N.P. ARMORI DISTT. GADCHIROLI
Construction of Bituminous Geo-Membrane Lining to Right Bank Canal at RD 56000 to 59500 mts of Upper Wardha Project
Repairs and Renewation of Shirgaon Left Bank Canal with Concrete Trough at Jambhe M. I. Scheme Ta- Shahapur Dist-Thane
Repairs and renovation of canal liningand allied structures on direct distributories 65 and 66 of PLBC under JISD 10 Parbhan
1.Construction of canal bridge on sh-118 to mudhale-vadgaon nimbalkar road odr 181 near vadgaon nimbalkar village.Tal-Baramati
Construction of Bridge on Canal Crossing at Wagholi Lavang Border Road Km 1/000 VR-483 Tal.- Malshiras Dist. Solapur
Lining works at RD 4870 m to 10060 m on main canal of Kalpathri Medium Project Tah. Goregon Dist. Gondia.
Construction of Direct Outlet at Ch 59/820 m in KM No.60 of Warna Left Bank Canal Tal.Shirala, Dist.Sangli.
Providing And erecting street light pole at Sainath nagar Canal Road Slum Area in old P.No. 18 Nashik Road Div.
Construction of Part-1 works through Pipe Distribution Network of Minor No.4, Ch-8/620 of Man main canal.
providing C C Lining on Main Canal and Repairs to Structure of Nagthana Minor Project Under Jalyukt Shiwar 2 0
Construction of Manual Lining For distributor No 7 at Ch 7/980 of Link Canal I Tal Kadegaon Dist Sangli
Removing wet silt and shrubby jungle at main canal and dy of Gadhavali and Singaspur MI Tal Taloda Dist Nandurbar
Deepening Of K.T. Weir AND Storage Weir And Repairs to Feeder Canal Of M.I. Tank Satnoor Tq. Warud Distt. Amravati
Correction to system deficiency of Dy 1 to Tail Dy of N.M. Branch Canal 2 Tq. Vaijpur Dist. Chh. Sambhajinagar
Repair and Maintenance of LIS Stage IV Main canal and its Minor for Rabbi Season 2024-25 of Khadakpurna Project.
CONSTRUCTION OF CONTINIOUS UNDERGROUND PIPELINE FROM RD 2500 M TO 3600 M OF TELANGANA PIPE CANAL OF LENDI INTERSTATE PROJECT
CONSTRUCTION OF GUTTER AND FIXING OF COVER FROM VIKRANT DESAI HOME TO CANAL IN THE AREA OF KOREGAON NAGAR PANCHAYAT
S.T. and B.T. TO ROAD FROM LAVNACHA CANAL TO BALASO YASHWANT POL ROAD AT VILLAGE CHINCHANI, TAL. KADEGAON, DIST. SANGLI.
Providing Materials For Construction and metalling from Barave wasti To Mandovhal Canal Road Khadikaran Karane Shet Panand Road At Palashi
Construction of cement concrete road at Kirat Surya canal to Malipada road Ch 0/00 to 0/095, Tal -Palghar
Repair and Maintanance of LIS Satge I Main canal and its Minor for Rabbi Season 2024-25 of Khadakpurna Project.
2702 M and R to Kheda Minor Project Tal Dist Dhule Removing bushy shrubby jungle and wet silt from Canal
CONSTRUCTION OF R.C.C. GUTTER IN KRUSHANA CANAL DALIT WASTI AT DUDHONDI TAL--PALUS UNDER DALIT WASTI SUDHAR YOJANA -2019-20
Construction of Cross Regulator Cum Escape in RD 63050 m on Gosikhurd Right Bank Main Canal, Tah. Bramhapuri, Dist. Chandrapur.
Excavating and constructing drain canal to drainout water from feilds on downstream of Tudiye katak bandhara ch. 0 to 650m
Provide cement lining to HPC at RD.7620m Left Bank Main Canal of Madan Project Tah. Seloo Dist.Wardha 2nd call
Repair and Renovation of existing Cement Godown to Quality Control Laboratory at Arphal Canal Colony Karawadi Tal Karad Dist Satara
Construction of Approach Roads and Balance Works on Road Bridges at RD 35090, 39035, 40697 m on Asolamendha Main Canal.
Repairs to Escape gate size 1.2 x 1.2 - 03 Nos. at RD 22980 on lower wardha main canal including Maintenance
Constructing Structure lining with necessary earthwork and Remodelling of structures for Punegaon Left Bank Canal in KM 0 to 63.
Construction of Selective Cement Concrete Lining on U/s and D/s Structures of Deoli Sub Branch Canal 2nd call.
1.Construction of canal type RCC gutter in prabhag no.12 from Arun Kamble House to Shahaji kale at Jaysingpur
Construction of Protection wall, Outlet Chembar, approach canal, Filliing embankment, and Pitching at Unhere MI Scheme Tal. Sudhagad Dist. Raigad.
Repairs Work of Office building of Sub Divisional Engineer, Gosikhurd Left bank canal Sub division, no. 3 at Wahi Colony.
Improvement to MSR 15 Palvemala to Canal Road VR 496 Km 0/00 to 3/00 Tal. Malshiras Dist. Solapur
Repair and maintainance of main canal, minors, sub minors and other allied works in Km 52 to 78 on MRBC
Construction of Balance Pipe Line Crossing on Warna Left Bank Canal in Km. 1 to 70 Tal. Shirala, Dist. Sangli.
DEVELOPMENT OF 7.5 METER D P CANAL ROAD FROM WADGAON BUDRUK SR.NO 30 TO P L DESHPANDE GARDEN ( BALANCE WORK )
Proposed construction of canal type RCC Gutter Work from sathenagar Public Toilet CD Work to Amardham Smashanbhumi Ward No 04A