Loading…
Loading…
10,127 results • Best match
EARTHWORK AND LINING WORK OF LEFT BANK CANAL FROM CHAINAGE 4890 M. TO 5440 M. AND EARTHWORK AND REPAIR WORK OF PURGAON SUB MINOR NO. 1 and 2 FROM CHAINAGE 0 M. TO 1500 M. UNDER KATANGI MEDIUM PROJECT. TAH. GOREGAON DIST. GONDIA
IMPROVEMENT TO PACHOD LIMBGAON HARSHI SONWADI MDR-36 PARUNDI TANDA ADUL TO MURADABAD ROAD MDR-128 KM 8/00 TO 12/00 (PART HARSHI TO SONWADI) AND KM 22/500 TO 24/500 (PART ADUL TO CANAL) TQ. PAITHAN DIST. CHHATRAPATI SAMBHAJINAGAR
Providing and Supplying Inspection Vehical on Hire basis to Tillari Irrigation Sub Division
Renovation of South and North side Garden in Irrigation colony at Kuwarbav Ratnagiri
Repairs to Godown Building of Irrigation Sub Division, Sawantwadi. Tal. Sawantwadi, Dist. Sindhudurg
Repairs to Irrigation Development Rest House at Sambhaji Chowk Nashik Tal. Dist. Nashik
Repairing and alteration work of Irrigation Old Rest House Baramati Tal.Baramati Dist Pune.
Providing Electricity HT-LT to Arjuna Medium Irrigation Project. Tal. Rajapur, Dist. Ratnagiri.
bioceramic root canal sealer, calcium hydroxide root canal filling material, chairside vinyl polysiloxane resilient denture liner introductory kit, temporary filling material, dental scaler tips, heroshaper rotary files
its Maintenance for 5years and handing over to Water User Association.
Construction of Dasaratha Ram Ghat and Development of the area for the Sihastha Kumbh Mela 2027-28, on the U/S side of the NandurDasak bridge in Nashik, on the Left bank of the Godavari River at Nandur, and on the Right bank at Dasak, Tal Dist Nashik
Special repairs to Earthwork and Spillway of Gobapur M.I Tank Tal. Kalwan, Dist.Nashik for preventing leakages through earthwork
Providing Breakfast, Lunch, Dinner, High Tea, Water and allied food arrangement for Goda to Narmada - Punyashlok Ahilyadevi Jalyatra -2026 from Trambak to Shirdi and Mandap arrangements and etc
Construction of ODHA Ghat and Development of Area, for Sinhastha Kumbh Mela 2027-28 on LEFT bank of River Godavari at ODHA, Taluka District Nashik
Constructing Causeway across Pir Nalla on G.R.B.C. Near Gut No. 281 At Village Meshi, Tal. Deola.
Survey Work and Taking Trial Bores for Shahi Snan Ghat at Dasak and Odha to be constructed on River Godavari for Sinhasth Kumbhamela 2027, Tal Nashik, Dist. Nashik
Construction of Pipe Culvert at chainage no. 170, D.O.at. RD 495, Fall Repairing at. RD 150, 240, 625, Aqueduct repairing RD950, 1500,5010 Syphon repairing at RD 950, 2475, canal lining at RD 2475 of Umari M I Project of section office Arvi
Repairs to Fall in km 7 on VTS DY, Repairs to VRB in km 4 and lining work in Km 3,related work in KM 6 and 7 on Chabhara DY including Carrying out irrigation management work in Rabbi and Hot weather season 2025-26 under U.P.I.Section No.15
Special Repairs to Adgaon Varkhed and Vadgaon Nalbandi Drainage Scheme on Jamda Left Bank Canal Vada Drainage scheme on Jamda right Bank Canal for the Year 2024 2025
Maintenance and Repair Works to Lower Dudhna Major Project Under Subdivision No.02 Selu, Dist. Parbhani (Year 2025-26)
Providing Of New K. T. Weir 1 Curved Needle Gates Qty. 259 Nos. And 2 Straight Needle Gates Qty. 48 Nos. Of Size 2.15 X 0.5 Mtr. At Various Sites
Manufacturing and Erection of Footbridge at 0 Bhandardara and providing and erection base of supproting structure of concrete pipe at Tata Power and repair side foot bridge and manufacturing providing penstock pipe of Dia 1000mm Length 8 Mtr at C
Maintenance and Repair Work to Pangari, Pokhari, Pimparkheda Minor Project and Talni KT Weir under Subdivision No. 4 Watur Tq. Mantha, Dist. Jalna (Year 2025-26) (Second Call)
Maintenance and repair works to the Dhamna medium project, Jui medium project, Pimpalgaon Kolte, Pralhadpur and Baranjala minor project Tq. Bhokardan, Dist. Jalna. (Year 2025-26) (Second Call)
Tilari Left Canal Fall Drop At 13/660 Hydro Electric Project
Repairs to canal and V.R.B. at Ch. 7/652m. of D.R.B.C
Constructing Village Internal Nagar Manmad Road to Pimpalas Collage ( Near Canal)
ROOT CANAL SEALER PASTE FOR OBTURATION CONTAINING TWO TUBES/ PRELOADED SYRINGES
well grown plants of two to three feet height following plant coconut tree as required as Per BOQ and Scope Of Work with Scheduled Quantities Are 20 No, Custom Bid for Services - Item No 14 SUPPLY OF VERIETY OF PALM TREES Rayal palm Foxtail form Fish ... of Drip Irrigation lines ... of Drip Irrigation lines ... of Drip Irrigation lines ... of Drip Irrigation lines ... of Drip Irrigation lines ...
Providing Labour and Machniary to operate watch and ward Ghanand Hivtad Canal Km 1 to 32 Sangola Main Canal km 1 to 50 Atpadi LBC 1 to 10 Kavthe Manhkal Canal Km 1 to 50 Virali and Dighnachi Dy and m I tank Budhihal in raotaion period.
Special Repairs to dam and canal construction of direct outlet Head Wall VRB and CR sepected lining and earth work Instalation of CTF Gauge Patti and Repairs to structures of RBC Main Canal Minor No 1 Minor No 2 and Sub Minor and LBC Main Canal Minor
Repairs of Irrigation Sub Divisional Offices at Kankavali and Sawantwadi and Construction of Washrooms
Repairs to Waste weir of Rawanwadi M I Project under Irrigation Sub-Division Bhandara
Repairs to Road Approches in the Kukadi Irrigation Division Campus, Shrigonda and Procured Furniture
Repairing of Electrical System and allied work for Correspondence Branch at Kolhapur Irrigation Circle.
Repair of class 2 room in Dapoli Irrigation Colony and Construction of Sewage Management
REPAIRS AND RECONSTRUCTION OF BUILDING OF IRRIGATION SECTION OFFICE CHAMORSHI, TAL CHAMORSHI, DIST. GADCHIROLI.
Taking Trial Bores For Construction Under Gosikhurd Right Bank Main Canal and Its Distribution System and Taking plate load test for damage section at RD. 5610 m. of branch B3 and Damage section RD. 12045 m. to 12145 m. of Branch B4 on G.R.B.C.
Construction of head regulator at Ch6300 at Ch8200 at Ch13050 Providing and Constructiuon of selective lining of KM 1 to KM 10 of Right Bank Canal Providing and Constructiuon of selective lining of KM 11 to KM 28 Providing and laying RCC trough paral
Construction of RCC Box at Ch52 585 m to 52 680 m in Km 53Ch 53 120 m. to 53 210 m in Km 54 and Superpassage at Ch 54 203 m. in Km 55 at Warana Left Bank Canal Tal Shirala Dist Sangli
Construction of Office Building for Water User Association from KM 34 to KM 99 of Gosikhurd Right Bank Canal and its distribution (Total 16 number office building) Registration no. 16, 21, 37, 38 , 39, 42, 41, 28, 8, 14, 15, 24, 43, 10, 22, 13
Construction of Part-1 works through Pipe Distribution Network of Minor No. 12 , Minor No. 13 at Ch 27/460, Vadjal Minor No.14 at Ch 27/830, Vadjal Branch at Ch27/830, Minor N0. 15 and Minor N0. 16 of Man main canal
P No 08-Sr No 1) Supplying and fitting of benches in various garden and Open spaces in Prabhag number 08 Sr No 2) Construction of drain from construction of drain from Shri. Jain House to Siddhivinayak Milk Dairy at Bhawani Nagar Canal Road ...
Estimate for Manufacturing with QAP, fabrication, erection, commissioning testing of 15 Ton Capacity Screw Stem Hoists for Sliding type Cross Regulating Gate of 2.5 M X 4.0 M size-4 Nos and C.H. 9230 M on Link canal-1 and 8 Ton Capacity Screw Stem
Estimate for Manufacturing with QAP, fabrication, erection, commissioning testing of 15 Ton Capacity Screw Stem Hoists for Sliding type Cross Regulating Gate of 2.7 M X 3.7 M size-5 Nos and C.H. 13300 M on Link canal-1 and 8 Ton Capacity Screw S
Construction of PDN to Minor between ch 54000 to 58500 Construction of Escape at ch 73900 and repairs of bank work at ch 77325 to 77900 on Krishna Canal Tal Palus Dsit Sangli Constructing Gabbion wll on Both Flank of Vasgade Tal Tasgaon Dsit Sangli
Shifting and Increasing Height and New Erection Testing Commissioning of 11 0 433KV Pole Mounted DTC, 11KV HT and LT lines crossing on canal length of Upper Pravara LBC on ch 6020 and LT lines at Ch 3720 4000 at village Mahaladevi tal Akole Dist
Improvement to Ausa Gubal Sastur Udatpur Murum Belamb Road SH-242 Km 58/600 to 60/200 (Part- Sastur to Udatpur ) Construction of Minor Bridges at Km 58/800 (Part- Near Sastur Village) Km 60/00 ( Part- Near Sastur Canal Crossing Bridge) Tq. Lohara Di
Construction of CTRB and Flood Escape Gates in KM 70 at Ch. 69.780 of Dhom Balkawadi Right Bank Canal, Construction of Permanent Supports to Tunnel No.5 in km No.75 of D.B.R.B.C, Construction of Lining of Tunnel in km No.74 of D.B.R.B.C, Construct
Repairs to damaged due to heavy rainfall in 2020 of Umarad minor Hulgewadi Minor of Pondhwadi branch canal HPC Repairs in Dhagatwadi Minor at Ch 1obliq1500 and 2obliq700 and repairs to super passage of PBC and Bhose Dy in km no 3 of KLBC