Loading…
Loading…
10,127 results • Best match
SPECIAL REPAIRS TO DHARANGAON DRAINAGE SCHEME OF LOWER GIRNA CANAL FOR THE YEAR 2019-20.
Construction of Part - I Work on Left Subminor No. 1 at RD 2280m and Right Subminor no. 1 at RD 2280m of Chopan Minor.
Earthwork for Tailing on Machindra Minor and Bambarde Minor No.2 on Tail distributory. Also on Left Minor No.1 and Left Minor no.3 of Wanoja sub distributory.
Construction of balance structures VRB, DHPC and INLET on Umred Minor No.2
Construction of Steel Foot bridge at RD 900m, Inlet at RD 2940m and 6020m on Kumbha distributory and Steel Foot Bridge at RD 870m, Inlet at RD 2390m, 2420m and 3660m and Bridge at RD 920m on Right minor no. 1 of Kumbha distributory.
MAINTAINANCE and REPAIRE TO SHIROLI MINOR 1, SHIROLI MINOR 2, AND SHIROLI DISTRIBUTORY OF WAGHADI MEDIUM PROJECT
Repair to Dam Approach Road of Deogaon MI Project
Repairsto compound wall of yavatmal patbandhare collani primises, and Residental Quarter repairs
Construction of Part - I Work on Shivani Minor of Tail distributory.
Construction of flood protection wall at. Near village Pahur izara tq. Kalamb Dist. Yavatmal.
Construction of Part - I Work on Branch sub minor no.1 of Inzapur Minor
Construction of Balance village Road Bridge, Inlet and Drain Crossing, on Tamba Distributory and Its Minors
Construction of Part - I Work on Direct Outlets of Chopan Minor.
CONSTRUCTION OF BALANCE C.T.B. and EARTHWORK OF TAIL DRAIN ON RAVERI MINOR NO-1 AND ITS SUBMINOR.
Construction of balance earthwork and structures on Right Sub Minor No 4 and Left sub minor No 4-A of Inzapur Minor and Construction of balance structures CTB,DHPC,INLET on Inzapur minor and its sub minor.
Providing RCC casing work to Pivardol Bandhara Stone head wall
Repair of disturbed and settled Upstream Side dam pitching of Waghadi Medium Project.
Construction of Part - I Work on Mardi minor no. 1, Mardi minor no. 2 at RD 110490m, Mardi minor no. 3 at RD 110670m and Bodad minor at RD 111490m.
Construction of balance earthwork and structures on Sub Minor No.3 of Minor No.3 of Ladki distributory.
Repairing Work of Approach Road Borgaon Medium Project
Pipe laying from RD 0 to 840 m and constrution of balance structures VRB, DHPC and INLET on Kinhi minor
Special repairs and renovation works for Muchi MI Tank Tq. Kelapur Dist. Yavatmal
Emergency Work of Removing Floating Debris accumulated on upstream side of Radial gates of Lower Pus medium project
Repairs to Service Gate of LBC Head Regulator Arunavati Project
Repairs to Service Gate of RBC Head Regulator Arunavati Project
Construction of VRB near Super passage in Km. 101 to 106 , Construction of Inlet in Km. 106 to 109, Construction of HR cum Escape at RD.112400 m And Construction of earthwork and Structure of Shivni Minor, Its Sub Minor and Tail Minor of Tail Dy.
Construction of A Class Quality Control Laboratory At Quality Control Subdivision, Yavatmal by Shifting from Thalegaon
Construction of Flood Protection Wall And River Re-gradation Work at River Turning Of Tiru River Tq. Udgir Dist. Latur
Construction of Part - I Work on Branch sub minor of sub minor no.3 of Ladki minor no.3
Repairs to VRB On RBC at Rd.715m, 2885m, 6090m and LBC at Rd. 4600m, 7350m, 7750m of Saykheda Medium Project.
Construction of Cross Regulator on Tail distributory
Construction of Balanced HPC and inlet on Kinhala Distributory and its Minor at RD 107770 m of B.M.C.
Maintenance and Repaire work for Right side Straight wall of Lower Pus Medium Project at Veni Bk Tq- Mahagaon Dist - Yavatmal
Construction of Balance Earthwork and Structures of Left minor No.5 and Right minor No 7 of Ramtirth Distributory
Proposed Construction of WBM Road from Nalegaon Aare Road to Approach Road Of Gharni Medium Project Tq Shirur Anantpal Dist Latur
Construction of Balance HPC and Inlet on Ramtirth Distributory at RD 46770 m of B.M.C
Construction of Part - I Work on Direct Outlets of Majra Distributory and its Right minor at RD 1590m and its Sub minor at RD 2070m.
Construction of balance earthwork, structures and tailing on Right Sub Minor No 5 of Wanoja Minor. Also balance structures of CTB, DHPC, INLET on Chikhali minor No 1 and 2
Construction of Part - I Work on Sakhra minor and Sindhi Minor at RD 105330 M.
Construction of Part - I Work on Left Minor No.3 at 4220 m, Right minor No.2 at RD 2475m, Right minor no.3 at RD 3550 m , Left Minor No.5 at 8700m, Right Minor No.7 at 12360m , Direct outlets in km 11 and Right Minor No.5 of Ramtirth Distributory.
Construction of Part - I Work on Dewada Minor No.1,Dewada Minor No.2 at RD 107530 Minor and Dewada minor No .3 at RD 108660 Minor
Providing Of New K. T. Weir 1 Curved Type Needle Gates Qty. 171 Nos. And 2 Straight Type Needle Gates Qty 15 Nos. oe Of Size 2.15 X 0.5
Repairs to Approach road For Saykheda Medium Project Tq. Kelapur Dist. Yavatmal
Repair work of the road above the dam at Adan Medium Project
Providing and Replacing Bottom and side Rubber seal for Radial Gate size 12 5 Mtr 3 No.s, All Gates Balancing, Providing Erecting Staircase for Ogee Repair and Maintainence of Service Gate 0.9 0.9 alongwith cabin for hoist Escape Gate LBC E.
REPAIRS TO CHAINLINK FENCING OF DAM AREA AT BORGAON MEDIUM PROJECT.
Dam safety and Maintainance and repair of waste weir of Kharad MI tank.
Construction of DHPC,Protection wall for disturbed banking on Ladki dy , Right Minor No-1,2 and Left Minor No -3,5,6 of Ladki distributory off taking at RD 73160 m of B.M.C.
Construction of WBM Approach from Landakwadi to Bemblewadi Under Submergence of Bemblewadi M.I.Tank Tq.Aurangabad Dist.Aurangabad
Construction of Part - I Work on Direct outlets in KM. 7 to 10 and KM. 12 to 15, Right Minor No.4 and Also Balance Part-1 work on Left Minor No.6 of Ramtirth Distributory.