Loading…
Loading…
10,127 results • Best match
PROVIDING SERVICES OF HEAVY DUTY OPERATOR (HDO), DRIVER, HELPERS FOR OPERATION FOR 11 MONTHS OF HEAVY EARTH MOVING MACHINES AT VARIOUS EARTH WORK SITES UNDER DEPUTY ENGINEER, MECHANICAL SUB DIVISION, BARAMATI.
DAM SAFETY WORK and REPAIRS TO WASTE WEIR OF DEOGAON PROJECT
Construction of Pipe line distribution network for Sakhara Minor at RD 99840, Shindi Minor at RD 105660, Devala Minor no. 1,2,3 at RD 106620, RD 107520, RD 108660, Khairgaon Minor at RD 109650, Mardi Minor no. 1,2,3 at RD 110020, RD 110490, RD 110670
Repair to HPC On LBC RD 60,945,6210,9010 of Wai Minor Project
Providing embankment in km 20 of RBC , excavation for trench in pickup weir and maintaince to warud and kasola section office.
DAM SAFETY and REPAIRS TO WASTE WEIR OF JAMWADI M.I.TANK
Repairs And Rennovation Of Sub Division Office Building At. Pandharkawada. Dist. Yavatmal.
Repair and Colouring of Rest House at Borgaon Medium Project. and Repairs and Renovation of Toilet Block at Borgaon Garden Area. and Repairs and Renovation of Toilet Block at Borgaon Garden Area. and Repairs and Renovation of Toilet Block at Borg
Providing repairs to Main Head Regulator, Security Mesh, Railing to Pendhari MI Tank Projects.
Construction of balance structures of VRB, DHPC and INLET on Sarai Minor No.1, Sarai Minor No.2 and Pimpalapur Minor and also on Chikhali (Wadhona) Minor.
Construction of Part - I Work on Khairgaon minor and its Subminor No. 1 and 2
Providing repairs to Main Head Regulator, Security Mesh, Railing and Approach Bridge to Pavnar MI Tank Projects.
Construction of Part - I Work on Tail Minor of Tail distributory
Repair and Renovation to Sub Division No - 3, Pusad and Rest House Building at Pus Project, Taluka - Pusad, Dist - Yavatmal
Construction of Ramp on Right Minor No.2 of Antergaon Br.Canal at RD 64560 m of BMC
CONSTRUCTION OF FALL ON TARODA MINOR NO.2 OF ZOLA M.I TANK
Providing Chain link Fencing and maintainance repairing to Rest House , Flood control room and Pohandul Section Office of Lower Pus Project Veni Bk Tq- Mahagaon Dist Yavatmal
Repair of nalla section in Km 18 and Resectioning of LBC Km 1 to 13 and Km 13 to 26 and Supplying labour for dam safety of Pus Project.
Construction of Balance Structures of VRB, DHPC and Drain Crossing on Ekburji Minor
SPECIAL REPAIRS AND RENNOVATION WORKS FOR ANTERGAON MI TANK PROJECT TQ. KALAMB DIST. YAVATMAL
Manufacturing,Transportation Erection Painting Of A Frame Structure With Chain Pulley Block For Trashrack Approach Bridge To Starcase Along With Railing And Extension Platform With Railing At S.G. Hoist And Allied Electrical Syetem At Pench Irri
Construction Village Road Bridge (C.D. Work) at ch. 2400 M and RCC Hume Pipe Line with Manhole of Left Bank Canal and Repairs of Silt Pocket of Right Bank Canal at M.I.Tank Lingawane Tal-Peth Dist- Nashik
Construction of Selective RCC lining With Strenghtening of earthwork and Repairs upto canal outlets of Nira Left bank Canal Distributory no.59 at Chainage between Km 5/420 to 6/460 km,9km and other Allied Works.
Repairs and Reconstruction of VRB at RD 1530 m and Outlet at RD 3600 m of Ramala Distributary Tail Outlet at RD 720(L), 720(R)m of Markanda Sub-Minor of K.K. Jalashaya (Dina Dam).
To carry out job work required for Manufacturing Transportation and Erection of Trash Rack Panels of size 1 5 m X 2 1 m 2 Nos and its embedments and A Frame for sliding type canal regulating gates of 1 5 m X 1 5 m size at Tembhu LIS Stage IV Vejegaon
To carry out job work required for Manufacturing Transportation and Erection of Trash Rack Panels of size 1 5 m X 2 1 m 2 Nos and its embedments and A Frame for sliding type canal regulating gates of 1 5 m X 1 5 m size at Tembhu LIS Stage V Bhood
Removing wet silt and shrubby jungle of main canal Ch 0 to 2100 and Dy No.1,2, sypplying labour of Hatti MI, Ch 0 to 3090 of Ghanegaon MI, Ch 0 to 1500 of Khmapada MI and supplying labour at ch 0 to 3090 mt of Chhawadi MI Tal Sakri Dist Dhule
Constructing Balance CC Lining in Deep Cut Km. No. 11 Balance Lining in Km. No. 18 at Ch. 17000 m to 17350 m of Dimbhe Right Bank Canal and constructing Foot Bridges at Ch. 4100 m Ch. 5300 m Ch. 7520 m Ch. 11080 m Ch. 16100 m, Ch. 18500 m, Ch. 2
Repair of VRB at RD 150 m on Reoral minor No 3 construction of HPC syphon on Dharmapuri sub minor 3 at RD 650 m across spill channel of Dharmapuri M M tank with renovation to C R chouki on RD 16 Km and 21 Km of Ramtek branch canal Tah Mouda
Under section no. 1 Dattapur 1) Construction of slab VRB on existing pipe VRB at RD 10290 and 13745 of Ghusali distributory 2) Repairs to the road bridges at RD 600 m and RD 1770 m on Wadhona minor no. 1 of Right bank canal 3) Repairs to the HPC at R
Lining to Main canal at Rd 3000 m to 3200 m Repairing of VRB at Rd 200 m on Mahari minor Repairing of HPC at Rd 3240 m on Khapa minor Lining to Khapa minor at Rd 3640 m to 3700 m and Rd 3820 m to 3850 m of Umari Medium Project
Internal repair of two blocks at first floor of R 3 1 building in Irrigation colony at Kuwarbav Ratnagiri
PROVIDING LABOUR FOR PATROLLING DURING RABI HOT WEATHER IRRIGATION UNDER BAWANTHADI SUB DIVISION BAGHEDA FOR THE YEAR 2022-23
Providing watchman for services for watch and ward at circle office and premices of Bhandara Irrigation Cirle Girola Bhandara
Providing office attendant to section office Mukadam and majur for daily work management in irrigation colony at Kuwarbav Ratnagiri
Drilling Five Bore well providing and fixing three Submersible Pump over bore well in Irrigation colony at Kuwarbav Ratnagiri
Strenthening of Guide Plate of gate portion of Saddle Dam. Of Tillari Interstate Irrigation Project, Tal Dodamarg, Dist Sindhudurg
Construction of Black Top Road From ODR 115 to Vilage Amba of Arjuna Medium Irrigation Project. Tal.Rajapur, Dist. Ratnagiri.
pavsali line takne.
please refer tender Notice
Fabrication and erection of radial gate of size 4.0m X 2.7M (2 nos) complete assembly n 10T rope drum hoist, hoist bridge, CRC cabin and all other allied works along with material, machine, painting transportation as per approved drawings ...
Repairing of open Main canal and distributaries using RCC half round pipe of Amboli M.I. Scheme
Carrying out Survey for Extended Command for Nilwande High Level Pipe Canal, Tal- Akole, Dist- Ahmednagar
Special Repairs To Pathare . Drainage Scheme On Pravara Left Bank Canal for the Year 2023-24
SPECIAL REPAIRS TO LONI DRAINAGE SCHEME OF PRAVARA LEFT BANK CANAL FOR THE YEAR 2019-20.
SPECIAL REPARES TO SUREGAON DRAINAGE SCHEME OF GODAVARI RIGHT BANK CANAL FOR THE YEAR 2020-21.
SPECIAL REPAIRS TO TISGAON DRAINAGE SCHEME OF PRAVARA LEFT BANK CANAL FOR THE YEAR 2019-20.
barbed broches, cavit g, sealpax root canal sealer, 2ml syringes, 5ml syringes, 15 c surgical blades
SPECIAL REPAIRS TO SATRAL DRAINAGE SCHEME OF PRAVARA RIGHT BANK CANAL FOR THE YEAR 2019-20.
Maintaince and Repairs works of Bhima Seena Link Canal (Tunel) Tal.Madha . for the year 2020-21