Loading…
Loading…
10,127 results • Best match
SPECIAL REPAIRS TO DHANDRI DRAINAGE SCHEME OF GIRNA LEFT BANK CANAL FOR THE YEAR 2019-20.
SPECIAL REPARES TO SHIRASGAON DRAINAGE SCHEME OF PRAVARA LEFT BANK CANAL FOR THE YEAR 2020-21
Work For Increasing The efficiency and Discharge carrying Capacity Of Branch Canal 02 of Bawanthadi Project.
CONSTRUCTION OF ROAD AT BORI FROM CANAL PHATA WAGHMODEWASTI TO BHAGWAN THOMBAREWASTI TAL-INDAPUR DIST PUNE .
Construction Internal road ward no. 6 mayureshwar colony canal bridge to bhadre house shahupuri Tal. satara
Repairs of structure fixing outlet gate on Krishna canal between ch 43/500 to 54/500
SPECIAL REPAIRS TO VADA DRAINAGE SCHEME OF JAMDA RIGHT BANK CANAL FOR THE YEAR 2019-20.
Construction of C.D Work at Chainage 650 m Of Left Bank Canal at M.I.Tank Shinde.Tal.Peth Dist.Nashik
Remodeling of the Tunnel from Ch 8360 m to 11810 m of Punegaon Left Bank Canal
Special Repairs to Loni Drainage Scheme On Pravara Left Bank Canal for the Year 2022-23
SPECIAL REPAIRS TO VELAPUR DRAINAGE SCHEME OF GODAVARI RIGHT BANK CANAL FOR THE YEAR 2019-20
SPECIAL REPAIRS TO SULTANPUR BHAVINIMGAON SCHEME ON MULA RIGHT BANK CANAL FOR THE YEAR 2019-20
Construction of Mechanised Cement Concrete Paver Lining of Upper Pravara Right Bank Canal Km 19-65
Constructing RCC Hume Pipe Drainage at Ch.14280, 16890, 17700, m of Godawari Right Bank Canal.
Construction of Pumping Facility for High Level Canal system of Nilwande Dam Tal- Akole Dist- Ahmednagar
SPECIAL REPARES TO KOLGAON DRAINAGE SCHEME OF GODAVARI RIGHT BANK CANAL FOR THE YEAR 2020-21
Special Repairs to Momin Akhada Drainage scheme On MulaLeft Bank Canal for the Year 2025-26 .
Construction of Mechanised Cement Concrete Paver Lining of Upper Pravara Right Bank Canal Km 69-84
Constructing R.C.C. Lining for various patches in KM. 27 and 29 of of Banda Branch Canal
TembhuLISchemeProviding variousValves Dismental joints on PDN line for Minors of Sangola Canal and other civil works
Construction of Inlet- Outlet Structure in Km 2, 10 and 14 For Arjuna Left Bank Canal.
Constructing V.R.B. at Chainage 1710 M of Link canal of Pimpraj Diversion Scheme, Tal.Dindori,Dist. Nashik
Special Repairs to Loni Drainage Scheme On Pravara Left Bank Canal for the Year 2025-26
Providing Beautification work (Horticultural) in Road Divider From Jatra Hotel to Nandul Canal in Panchvati Division.
SPECIAL REPAIRS TO RAMPUR DRAINAGE SCHEME OF PRAVARA RIGHT BANK CANAL FOR THE YEAR 2019-20.
SPECIAL REPAIRS TO ADGAON DRAINAGE SCHEME OF JAMDA LEFT BANK CANAL FOR THE YEAR 2019-20.
SPECIAL REPARES TO MANJUR DRAINAGE SCHEME OF GODAVARI RIGHT BANK CANAL FOR THE YEAR 2020-21.
Special Repairs To Kolhar Bhagwatipur Drainage Scheme On PravaraLeft Bank Canal for the Year 2025-26
Repair to the Syphon Structure of Mangi Left Bank Canal A t7 600 Km. Tal Karmala.
SPECIAL REPAIRS TO PATHRE DRAINAGE SCHEME OF PRAVARA LEFT BANK CANAL FOR THE YEAR 2019-20.
Repairs of structure fixing outlet gate on Krishna canal between ch 54/500 to 64/500
SPECIAL REPAIRS TO SHINDI DRAINAGE SCHEME OF JAMDA LEFT BANK CANAL FOR THE YEAR 2019-20.
SPECIAL REPAIRS TO MAHEGAON DRAINAGE SCHEME OF GODAVARI RIGHT BANK CANAL FOR THE YEAR 2019-20
SPECIAL REPAIRS TO KOKANGAON DRAINAGE SCHEME OF PALKHED RIGHT BANK CANAL FOR THE YEAR 2019-20.
SPECIAL REPAIRS TO HANUMANTGAON DRAINAGE SCHEME OF PRAVARA LEFT BANK CANAL FOR THE YEAR 2019-20.
Maintenance and repairing and resectioning at selected portion for Krishna Canal ch 0 to 13500 km
SPECIAL REPAIRS TO ZHAREKATHI DRAINAGE SCHEME OF PRAVARA RIGHT BANK CANAL FOR THE YEAR 2019-20.
Repairs of structure fixing outlet gate on Krishna canal between ch 64/500 to 86/000
Repair work of the Cross section at km 46 to 47 on Paithan Left Bank Canal
Manufacturing, Transportation and Erection of CR Gate 1.5mtr x 2.0mtr -3Nos with Embedments, Leaf and Stem Hoist For Upper Pravara Left Bank Canal at R.D. 65/100 Kms under the control of Ex. Engr., Upper Pravara Canal Division,Sangamner
Repairs and reconditioning to sliding type gates of sizes 450x450mm Oty- 25 no. on Godavari right bank canal , repairs and reconditioning to sliding type gates of sizes no. on Godavari left bank canal complete job including gate frame, gat
Manufacturing , Transportation and Erection of CR Gate 1.8mtr x 1.8mtr -2Nos with Embedments, Leaf and Stem Hoist For Upper Pravara Left Bank Canal at R.D. 77/500 Kms under the control of Ex. Engr., Upper Pravara Canal Division , Sangamner
Dismantling Service gate and Manufacturing and Erection New Gate of Size 1.7 x 1.65 MTR . 2 Nos at Left Side Canal and 1.7 x 1.65 MTR. 2 Nos at Right Side Canal of Kundalika Project Tal. Roha Dist. Raigad.
as per tender documents
Internal electrification to Terminal Well Building No.1 2 and 3 on Main Dam of Tillari Irrigation Project Tal.Dodamarg Dist.Sindhudurg
Construction of an Inspection Bungalow at Dam location of the Arjuna Project under Arjuna Medium Irrigation Project. Tal.Rajapur, Dist. Ratnagiri.
Preparation of detail construction plan Survey, Design and Estimation for Pipe Distribution network System for Deoghar Irrigation Project Ta.Kankavali, Dist.Sindhudurg
Construction of Retaining wall and Bed Protection works for Tail Channel of Arjuna Medium Irrigation Project, Tal. Rajapur, Dist. Ratnagiri.
Construction Works of Civil Facilities in Rehabilitation Village Karak No.1 of Arjuna Medium Irrigation Project. Tal. Rajapur, Dist. Ratnagiri.
Construction Works of Civil Facilities in Rehabilitation Village Karak No.2 of Arjuna Medium Irrigation Project. Tal. Rajapur, Dist. Ratnagiri.