Loading…
Loading…
10,127 results • Best match
Carrying out internal repairs, office furniture work, supply of materials and ancillary works in the Irrigation Project Construction Division, Ratnagiri.
Preparation OF PDN SURVEY, ESTIMATES AND DETAILED PROJECT REPORT OF 5000Ha. AREA OF M.I. TANKS UNDER SOLAPUR IRRIGATION DIVISION SOLAPUR
Repair the Aqua duct and Side railing Platform of Ch No 0 610 and 3 590 of Hetavane Laft Canal which includes Painting materiallabour workshop charges sundry charges, handling charges taxes levis etc all complete job at Hetavane Laft Canal
Job work of Complete Manufacturing, Transportation and Erection of Canal Gates of size 1.2 x 1.2 M 03 Nos on canal of Vandri Project including Embedment, Gate Leaf and Screw stem Hoist along with its component, Tal-Dahanu, Dist- Palghar
Job work of Repairing of Sluice Regulating valve and Emergency valve of Dia1500mm at Ch.No.390mtr High Level Pipe Canal and Repairing and Reconditioning Servicing of Air Valves at various chainages of Pipe canal under the control of Ex. Engr., Mino
Construction of Selective linning for preventing water loss through leakge of Right Bank Canal Ch. 1820 m To Ch.1870 m etc and Left Bank Canal Ch. 2355 m To Ch.2415 m etc of M.I.Tank at Roshani, Tal.Trimbakeshwar, Dist.Nashik.
Preparing Delineation, Formation Registration of Individual Water Users Association By Conducting Elections In Command Area Of Isapur Left Bank Canal KM 0 to KM 84 Along With Disnets and Isapur Right Bank Canal KM 0 to KM 47 Along With Disnet
Construction of CR Cum ESCAPE at Ch. 8610 M of Arjuna Right Bank Canal KM No. 9
Carryingout Periodical Observations in the Cammand area of Ghod Right Bank Canal for the Year 2022-23.
Constructing RCC Hume Pipe Drainage at Ch.31850, 38980, 35600, 51280, m of Godawari Right Bank Canal
Special Repairs To Dhar and Chandsar Drainage Scheme on Lower Girna Canal for the Year 2024-25
SPECIAL REPARES TO RAJURI MAMDAPUR DRAINAGE SCHEME OF PRAVARA LEFT BANK CANAL FOR THE YEAR 2020-21
SPECIAL REPARES TO KOLHAR BHAGVATIPUR DRAINAGE SCHEME OF PRAVARA LEFT BANK CANAL FOR THE YEAR 2020-21
Construction Of Retaining Wall On Dudhebavi Dy at Ch.126/800 Of Dhom Balkawadi Right Bank Canal.
JOB WORK FOR MOTORISATION REPAIRS AND MAINTAINCE TO SERCIVE GATE AT LEFT SIDE CANAL FOR VADIWALE DAM
SPECIAL REPAIRS TO KHANDALA NANDUR DRAINAGE SCHEME OF PRAVARA LEFT BANK CANAL FOR THE YEAR 2019-20
SPECIAL REPAIRS TO MAHALPATNE-1 DRAINAGE SCHEME OF GIRNA RIGHT BANK CANAL FOR THE YEAR 2019-20
REPAIR AND RENOVATION OF AQUEDUCT ON MAIN CANAL at CH.5-600 KM AT M.I PATHARI TAL.BARSHI.
Maintenance and Repairs to Parola Left Bank Canal Km. 01 to 10 and Km.. 14 to 21..
Constructing HPD at Ch39788 m of Waghad Right Bank Canal against slab culvert damaged due to flood
Repairs and Lining to Minor-10 of Lamboti Dy. of Karamba Branch Canal for year 2019-20.
SPECIAL REPAIRS TO SONAI - 9 DRAINAGE SCHEME ON MULA RIGHT BANK CANAL FOR THE YEAR 2019-20
Construction for Cross Regulator on Main Canal at RD 34700M of Upper Manar Project, Limboti Tq. Loha
REPAIR AND RENOVATION OF HEAD REGULATOR OF CANAL AND REPAIR WORKS OF M.I TANK CHARE TAL. BARSHI
Jobwork of Repairs and Strengthening of railing powerhouse to CR gate both side canal at Vaitarna Dam
Improvement to Khadaktale to Canal Shivnala Road Km. 0/900 to 1/500, Tal. Deola, Dist. Nashik
SPECIAL REPAIRS TO KHEDLA RUI (WIDENING) DRAINAGE SCHEME OF GODOVARI LEFT BANK CANAL FOR YEAR 2022-23
Constructing footbridges in KM. 21 ,R.C.C. lining and WBM road in Km 22 of Banda Branch Canal
Repairs to Aqueduct, Super passage, Outlet on Right Bank Canal Of Pimpurna MIS, Tal-Jawhar, Dist-Palghar.
Khambora Project Maintenance and Repair and Motorization to Canal Gate and Hoist 1.2 x1.5 Mtr 3 No
Special Repairs to Rajuri Mamdapur Drainage scheme On Pravara Left Bank Canal for the Year 2025-26 .
CONSTRUCTION OF COMPOUND WALL RHS OF FEEDER CANAL TO KANCHANWADI M.I. TANK IN WALMI AT CHHATRPATI SAMBHAJINAGAR
Maintenance and Repair to the Office Building of Ujjani Canal sub Division No 57 and 15 Solapur
Constructing Lininig for km 1 to km 7 of Aruna Left bank canal. Tal. Vaibhavwaddi Dist. Sindhudurg
Constructing Pipe Distribution Network System for Dy No 23 on Manikpunj Right Bank Canal. Tal- NandgaonDist- Nashik .
Repairs and Lining to Minor-10 of Lamboti Dy. of Karamba Branch Canal for year 2020-2021.
Supllying Various Types Material Of Janai canal to Mahadev Mandir Road At Dandwadi Tal Baramati Dist Pune
Repair of Open Canal With RCC Half Round Pipe for Sanamtemb M.I. Scheme, Tal . Sawantwadi, Dist-Sindhudurg.
Construction of Lining, Earthwork and straucture of Tail Dy, Talegaon Dy ,RM 6 on Jamgaon Branch Canal
Repairs and maintenance of Nara Cross Regulator Gate of size 3.0 x 1.8m 01 No. and Roller type Escape Gate of size 1.8 x 1.5m at RD 13830 and Belgao roller type CR Gate of size 2.0 x 2.0m and 1.8 x 1.7m- 1 Nos. at RD 17130 of Main Canal of Kar Projec
TLIP Const of Closed PDN System for Balance work of Open Dy No. 7 Conversion of Open Minor No 7A into Closed PDN system and Constn of CADW through Closed PDN on open Dy No 7 an Direct Closed Minor 1 3 7 A 8 10 12 and Dos on Link Canal 1 Including Re
Under section no. 1 Mangrul (1) Repairing of canal lining and Fall type V.R.B. at RD 2640 m and D.O.L-8 with VRB at RD 2635 m of Cinchpur minor-2 and HR with VRB at RD 2630 of sub minor-3. (2) Construction of Slab VR B on Nalla originating from the V
Construction of CC Lining from RD 900 m to 990 on kurla minor RD 40670 m to 40730 m on left bank main canal repair of fall on sultanpur minor no 1 at RD 960 m and provision of cc lining from RD 900 m 1020 m And provision of cc lining from RD 1870
Strengthening and Black Topping of SH 7 To Mahegaon Deshmukh Road ( VR 30) Km 4/200-6/200,STBT to SH-7 To Bagas Yard To Canal Road Kolpewadi ( VR 02 ) Km 0/000-1/000, S T B T SH 36 to Kokamthan road (V R 43) Km 0/0 to 3/0 Tal.Kopargaon
Construction of RCC Open trough at RD 75 m. to 115 m. Close Conduit at Rd 125 m to 590 m and Cross Regulator at RD 4100m and 7230 m on B4 and Cross Regulator at8640m of Branch B-3 and ESCAPE at RD 8310 m of Branch B-3 of Gosikhurd Right Bank Canal.
Construction of Cross Regulator at Ch.37/570m in Km 38 State Highway Road Bridge at Ch.50/085 in Km 51, and Village Road Bridge at Ch.51/000 in Km 52 at Ch.53/280 in Km 54 at Ch.64/295 in Km 65 in Warna Left Bank Canal, Tal. Shirala, Dist.Sangli.
Strengthening work of RBC Km 12 ch. 11/260 to 11/560, Km 13 ch 12/000 to 12/360, and RBC Prevent canal leakage Km 14 Chain No. 13/880 to 14/020 as well as to strengthen the observation path at Km 15 Chain No. 15/060 to 15/460 of Right
Reconstruction and Repairs to Fall at RD 450 m RD 600 m on Borda Mr 3 offtaking RD 11160 m of Kanhan Branch Canal and Fall at RD 5580 m on Gahuhiwara Dy and VRB at RD 320 m of Gahuhiwara Mr 3 of Gahuhiwara Dy offtaking RD 9990 m of KBC on PLBC
Removing wet silt and shrubby jungle of RBC at Dy No. 5,7,10,11,13,14, Km No. 9 to 14, Km No 2 to 4 and its Dy No. 2 to 4 and supplying labour for irrigation purpose at Dy No. 5 to 14, Km No 1 to 8 of RBC and Km No 1 to 5 at LBC of Aner Medium Projec
Constructing Foot Bridges in Km No. 211 to 249 of Kukadi Left Bank Cana