Loading…
Loading…
10,111 results • Best match
Repairs and renovation of canal lining and allied structures on minor canal of B 70 under pingli and Ekrukha section 25 under JISD 10 Parbhan
Faser Check Dam at Kevadipada No.1 Tal.Nandurbar Dist.Nandurbar
Faser Check Dam at Shetagaon No.1 Tal.Navapur Dist.Nandurbar
Operation, Maintenance Repair work of pumping machinery allied electro-mechanical equipments, of Jihe Kathapur Lift Irrigation Scheme on Rising main 1 ,Stage1,Stage 2 stage3 Operation Maintenance Repair work of pumping machinery allied electr
Formation AND Handing Over of Water User Association, on Command Area of Jath Main Canal km 53 to 81 and Jath Branch Canal Km 1 to 16 of Krishna Koyna Lift Irrigation Scheme Mhaisal Jath Part Tal Jath Dist Sangli As per MMISF Act 2005
Krishna Koyna Lift Irrigation Scheme - Mhaisal Jath Part Construction Of Valve Type Direct Outlet With Their Pipe Distribution Network (5 Nos.), Escape At the Tail End Of Billur Canal Part-I and Inlet (5 Nos.) on Billur Canal Part-I and II Tal-Jath.
Krushna Koyana Lift Irrigation Scheme (Jath Part) Construction Of Valve Type chamber For Dorli Dy Offtake At CH 1/120 m, Cross Regulator At Ch 7/320 Of Billur canal Part-I and Valve Type Escape at CH 19/730 Of Billur Canal Part
Repairs and Maintenance to Service gate of 0.9X0.9 mtr at Sawana, Deodhari, Parola, Marsul, Hirdi, Aundha Minor Irrigation Project at Hingoli District Under Purna Irrigation Division, Basamath Nagar
Tembhu Lift Irrigation Project Formation of WUA and Handling over WUA on Dy 1 and 6 Minor No 2 and 3 Chitali Minor No 1 2 and 3 of Link Canal II Tal Kadegoan Dist Sangli
Krishna Koyna Lift Irrigation Project Mhaisal LIS-(Jath Part) Providing Protective work for air valves on rising main of 6A Ankle, 6B Khalati and Steel Foot Bridges in Devnal Canal Part 1 Taluka Jath Dist-Sangli
Construction of remaining earth work rom 0 to 10.74 k.m., construction of C.T.B. and Drain Crossing at R.D. 6600m of Pendhari Mokhala Distributory offtaking from R.D. 8730 m. on main canal of Mokhabardi Lift Irrigation Scheme.
Construction Of Balance Structures From Darphal To Savargaon Canal of KM Lift Irrigation Scheme no 2, Taluka- Tuljapur, Dist- Dharashiv. (Stage 2- CTB at 4500m, CTB Cum SP at 5120m, SP at 10260m, DHPC at 10840m)
Tembhu Lift Irrigation Project Command area development work by closed Pipe Distribution Network system for Minor 2 and 4 on Link Canal I and its repairs including Running and operation Maintenance of system for 5 years
Krishna Koyna Lift Irrigation Scheme Mhaisal LIS Jath Part Construction of Foot bridges 04 Nos and Valve Type Chembers Ch24380, 26420, 29120, 41310, 46840 47100, 4730047800 08 Nos on Jath Main Canal Tal Jath Dist Sangli
Mhaisal Lift Irrigation Project Jath Part Maintenance of Mhaisal Lift Irrigation Project Devnal Canal Part I KM 1 to 28 and Devnal Canal Part II KM 1 to 12 Rotation period for Year 2020-21
Gated check Dam Zaregaon no.1,Mirzanpur no.1,Dahitne no.1,Sangamner no.1,2,3,4, Hatij Tal.Barshi Dist.Solapur
Construction of Approach Road for Pathargaon Lift Irrigation Scheme from Pump House no.2 to Amla vishweshwar Taluka Chandur Railway, District Amravati
Supplying Erecting Testing and Commissioning of Earth Mat for Pump House of Lift irrigation Scheme No 5 Sindphal Tal Tuljapur Dist Osmanabad
Wakurde Lift Irrigation Scheme. Part I, Stage II Construction of Cross Regulator at Ch.7/210 of Wakurde Red Canal.Taluka Shirala, Dist.Sangli
Krishna Koyana Lift Irrigation Project Mhaisal LIS (Jath Part) construction of CTRB on Banali Shegaon Dy. 2, Wayaphal Minor 1 and 2
Improvement and Repairs (Asphalting) to Approach Road from Pump House to Delivery Chamber along Rising Main for Sina Madha Lift Irrigation Scheme.
Operation maintenance of 33KV Switchyard equipments of Shirala Lift Irrigation Schem Dist osmanabad for The period of one Year Year 2023-24
Employing Private security guards for Security purpose at 132 and 33 kv Manpur Substation of Varangaon Talwel Lift Irrigation Scheme Dist Jalgaon
Construction of Foundation of 33 KV Sub-station and Allied Works for Wardha Barrage (Hadgaon) Lift Irrigation Scheme, Tq. Babhulgaon, Dist. Yavatmal
Annual operation of 33 6 6 KV Switchyard for Bramhagavhan Lift Irrigation Scheme No 2 Jayakwadi N Tal Paithan Dist Chhatrapati Sambhajinagar
Providing repairs to Lighting System and Providing and fixing Insulating Mat Fire Extinguisher at Derla Lift Irrigation Scheme Tq Loha Dist Nanded
Removal of silt from sump well and forebay of Pump House of Dhapewada Lift Irrigation Scheme Stage II Ta Tirora Dt Gondia
Providing outsourcing staff for running and attending the office of Takari Electrical E and M Lift Irrigation Division Sangli for one year
Construction of Earthwork and Structures on Left Minor offtaking at RD 420 m On Right Distributory of Lal Nalla Lift Irrigation Scheme.
Tembhu Lift Irrigation Project Constructionof Balance work for K T Weir at Dighanchi Khandoba Mandir and Zare Nhavki Tal Atpadi Dist Sangli
Repairing work of Gate s and Structure s in selected portion of Kawlewada and Pujaritola Distributory under Dhapewada Lift Irrigation Stage I
Rewinding of HT motor,Supply and replacement of bearing at Janai Lift Irrigation scheme Stage 2 Motor No. 7,Sr.No. NVMC497026/7
Design, Manufacturing, Supply, Erection, Commissioning of 7.5 MT capacity single girder E.O.T. crane for Dhapewada Stage-2 Lift Irrigation Scheme, Dist.- Gondia.
Krishna Koyna Lift Irrigation Scheme Mhaisal Jath Part Supplying Drivers for 2 government vehicle of Mhaisal Pump House Division No.2 Sang
Core Cutting work for creating verticle holes in the concrete of given size at Dhapewada Stage-2 Lift Irrigation Scheme Dist. Gondia.
Construction of Pump House Building, Manifold, Rising Main, Pipe Distribution Network For Kherda-Pachod Lift Irrigation Scheme, Taluka-Paithan, Dist. Chhatrapati Sambhajinagar
Providing skilled labours Loader office support staff and tractor for operaqtion and maintence of Tembhu Lift Irrigation Kadepur Subdivision for 2019-20
Providing manpower to perform work of Labour, pump operator at Upper Wardha Dam, LBHR, RBHR, Siesmological Building and Gurukunj Lift Irrigation Scheme.
Taking out Trail Pit and Trail Bore For Foundation Exploration For the Construction Of Dhapewada Lift Irrigation Scheme Stage II Phase III
Supply, Erection, Testing and Commissioning of Battery Charger DCDB and ACLT Pannel at Talodhi Mokasa Lift Irrigation Scheme, Th- Chamorshi, Dist.- Gadchiroli.
Construction of Gabion Wall and Stone Pitching on upstream side of Jihe Kathapur Barrage under Late Guruvarya Laxmanraoji Inamdar Lift Irrigation Scheme.
Formation and Handing over of WUA for Tarale Bambawade Dhumakwadi Awarde and Konjawade Lift Irrigation Scheme Stage-II Tal Patan Dist Satara
Construction of Drainage gutter and Retaining wall At Tarale Lift Irrigation Scheme Stage 2 Pumphouse Tal Patan Dist Satara Under Tarali Project
Supplying Erecting Testing and Commissioning of Earth Mat for Pump House of Lift irrigation Scheme No 4 Pangardarwadi Tal Tuljapur Dist Osmanabad
Design, Supply, Erection, Testing And Commissioning Of 33 Kv Switchyard Equipments For Ghungashi Lift Irrigation Scheme (Booster Pump) Tq. Murtizapur Dist. Akola
Repairing works of IP and SR side gate and outlet in selected portion of Tirora Distributory under Dhapewada Lift Irrigation Stage I
Operation and Running Maintenance of Pump and Allied Mechanical and Electrical equipments of Kavthe Kenjal Lift Irrigation Scheme (For Year 2025-26)
Construction Of Switch Yard , Control Room ,Compound Wall and Approach Road at Stage II (Kudnur) Of Extended Mhaisal Jath Lift Irrigation Scheme.
Supplying Erecting Testing and Commissioning of Earth Mat for Pump House of Lift irrigation Scheme No 3 Sawargaon Tal Tuljapur Dist Osmanabad
Krishna Koyna Lift Irrigation Scheme Mhaisal Jath Part Providing Driver for Light Duty Vehicles of Mhaisal Pump House Division No.2 Sangli