Loading…
Loading…
10,111 results • Best match
Takari Lift Irrigation Project Repair Works To Damaged Deck Slab Of Satapewadi Barrage, Due to Flood Occurred in 2019 in Krishna River
Construction Of Switch Yard, Control Room, Compound Wall And Approach Road at Stage-I (Bedag) Of Extended Mhaisal Jath Lift Irrigation Scheme
Construction of Concrete Pavement and other miscellaneous works at Pump House Of Bramhagavhan Lift Irrigation Scheme Part-II, Tq. Paithan, Dist.Chhatrapti Sambhajinagar.
Construction of Head Regulator Gate at Entry of Andhali tunnel under Guruvarya Late Lakshamanraoji Inamadar Lift Irrigation Scheme(Jihe Kathapur) Dist- Satara
Construction of Balance Work Activities like area Landscaping external lighting Roads etc For Lift Irrigation Scheme No 07 Ta Shegaon Dist Buldana
Surveying Designing Estimation works of Lift Irrigation Scheme at Village Save on Kadavi river under Kadavi Medium Project Tal Shahuwadi Dist Kolhapur
Annual Operation of 33 6.6 KV Switchyard for Bramhagavhan Lift Irrigation Scheme No.2, Jaykwadi N, Tal.Paithan, Dist.Chhatrapati Sambhajinagar. Year 2026 27
Construction of Jack well to Water Supply Scheme At Revtale in submergence of Nageshwari Minor Irrigation Scheme Tal Mahad, Dist Raigad
Repairing And Renovation Of Office of the Executive Engineer, Minor Irrigation Division, Oras And Office of the Superintending Engineer, S.K.I.P.C, Oros
Providing Alternative Water Bound Macadam Road for Farmers in Submergence of Waghadi Barrage Lower Minor Irrigation Project Tq Daryapur Dist Amaravati
Detailed Survey and Design of Closed Pipe Distribution Network in Atpadi Kachrewasti Mahadikwadi Jambhulani Minor Irrigation Tanks Tal Atpadi Dist Sangli
FOR DAY TO DAY CLEANING OF FIVE SUB DIVISION OFFICES UNDER MINOR IRRIGATION DIVISION OROS AND ANNUAL MAINTAINCES AND REPAIR WORKS
CONSTRUCTION OF GATED CHECK DAM POUT NO. 4, BAVCHI NO. 1, 2, TAL. MANGALVEDHA, DIST. SOLAPUR
Execution of Ancillary works For Irrigation Management on Surya Right Bank Canal and its Distribution system to operate Konkan Irrigation Season 2020 21
Providing Manpower for Irrigation management of Irrigated crop Area Measurement Water rotation and water bill recovery Under Arphal main canal and Palus branch canal for 2023 24
Water Distribution of Minor Irrigation Investigation (T) S/Dn. Wardha for Irrigation in Kharip Rabbi for year 2020-21 on Deoli Branch Canal Km. 5 to 20, Selsura Distributory, Takali (Darne) Distributory Km. 0 to 6 wirh minors on it of Lower 2nd call
PP SCREEN FILTER, PRESSURE GAUGE, FTA, TAPLON, Gromet, PVC PIPE, Elbow, Socket, Solvent, Cock, TEE, NMV PVC BALL VLV, PVC FLUSH VALVE, Plain lateral, Pressure compensating dripper in line lateral, RUBBER GROMMET, Take off, Reducing coupling joiner, End Line plug
Collection of Water Demand, opening and closing operation of canal gates, taking measurment of irrigable area and update irrigation account, irrigation work of L.B.C., RBC Main Canal, Naraykhed , Nimgaon Wayal , Dagadwadi LIS Main canal, minors and
Construction of Zare Minor Sub Minor and Laterals and CADWM works on LBC by HDPE Pipes and PVC Pipes open channels and micro irrigation on Tilari Irrigation Project. Tal-Dodamarg, Dist- Sindhudurg.
Execution of Ancillary works For Irrigation Management on Surya Left Bank Canal and its Distribution system to operate Konkan Irrigation Season 2020 21
Pump Operation, maintenance, Repair and Other allied mechanical and electrical repair work for year 2025-26 at Urmodi Lift Irrigation Scheme Stage I and II under Krishna Irrigation Division, Satara.
Carrying Out Command Area Survey Preparing Detail Design and Estimate of Pipe Distribution Network for Shirgaon Lift Irrigation Scheme at Village Shirgaon Tal Karad Dist Satara under Tarali Irrigation Project
Khrikund (St) Minor Irrigation Project Tq. Anjangaon Surji, Dist. Amravati. Construction of low level causeway in tail channel approach to Khirkund M.I.Tank
Providing Pitching in the hillocks between Dam line in No Dam Portion of Popatkhed (StageII) Minor Irrigation Tank Tq. Akot, Distt. Akola
Supply, Erection, Testing and Commissioning of On Grid Solar System, CCTV Installation and Electrification work at Surevada Lift Irrigation Scheme, Surevada Dist.Bhandara
Resectioning of Link Canal of Km.11, Left bank Canal of KM.4 and Right Bank Canal of. Km 7 Of Shirapur Lift Irrigation Scheme
CONSTRUCTION OF GATED CHECK DAM Hatid No.4,K.T.Weir Hatid No.4 TAL.Sangola, DIST. SOLAPUR
Providing Man power for Irrigation Management Work For Section Office under kalasgade jelugade patane khadakohol jelugade karanjgaon ambewadi Minor Irrigation Project Tal Chandgad Dist Kolhapur for year 2025 26
Krishna Koyna Lift Irrigation Project Mhaisal LIS - Jath Part Construction of Command Area Development works in PDN on the distribution system of Jath Branch Canal including Running, Operation and Maintenance of System for Five years. Tal- Jath
Tembhu Lift Irrigation Project- Construction of Pipe Distribution Network from Tembhu Link Canal No 1 at Ch 1400m to village Kadepur Vadlaidevi Distributory including running Operation and maintenance of System for Five yrears Tal Kadegaon Dist Sang
Wakurde Lift Irrigation Scheme-Part I, Stage-2- Construction of SP cum CTRB at RD 8/650 m and Escape at RD 8/010 m in Badewadi Biur Canal Km 7 to 10 Tal-Shirala Dist-Sangli
Krishna Koyna Lift Irrigation Scheme - (Takari Part) - Survey, Planning , Design and Preparation of Estimate of main closed pipe line offtaking from D.C.of Stage II of Takari Lifit Irrigation scheme to give Irrigation banifits for Kundal, Kumbhargoan
Providing manpower for operation and maintenance of switchyard equipments and filteration and topping of transformer oil of Kirmiri Darur Lift Irrigation Scheme,Tal-Gondpimpary,Dist-Chandrapur for Two Calender year.
Providing Manpower for Operation and maintenance of Switchyard equipments and Filtration and Topping of Transformer oil of Kirimiri Darur Lift Irrigation Scheme Tal. Gondpipri Dist Chandrapur for Two Calender Year
Construction of Pipe Distribution Network (PDN) instead of open Distributary and Minor for Khatav Canal Km 0 to 76 Under Urmodi Irrigation Project Tal. Khatav Dist. Satara
Shifting and Dismantling of existing line and Supplying, Erecting, Testing,Commissioning of 11 kV HT and LT line at various location due to construction of Canal on Kochi Ambezari Minor Irrigation Project At.Kochi Tq.Ghatnji Dist. Yavatmal
Kukadi Irrigation Project, Dist. Ahilyanagar Special Repairs to Kukadi Left Bank Canal Dy.10, 11 and Visapur Branch Canal(Dy.132) under Maharashtra Irrigation Improvement Programme (MIIP)
Construction of RCC Compound wall at Pump House no.3, Golewadi under Guruvarya Late Laxmanraoji Inamdar Lift Irrigation Scheme, Tal. Koregaon, Dist. Satara
Operation and Maintenance of 33/6.6 kV switchyard equipment at Lalnala Lift Irrigation Scheme Tal . Kora , Dist. Wardha for the year 2020-21.
Installation and commissioning of Surge protection system For Ner LIS .1 and Ner LIS .2 under Guruvarya Late Lakshamanraoji Inamadar Lift Irrigation Scheme
Operation and maintenance of 132KV Switchyard equipments of Sina Madha Lift Irrigation Schem Dist Solapur for the period of one Year 2023 24
Repairs to Emergency gate of size 1.98 mx1.65m-1 No and Service Gate 1.98mx1.65m-3 No at Karajkhdea Lift Irrigation Scheme, Dist. Bhandara.
Lower Tapi Project - Command area survey of Sane Guruji Co-op Lift Irrigation System for Lower Tapi Project Padalsare Tal-Amalner Dist-Jalgaon
Providing Watchman for shift A, and B for security of Pump House and Premises at Satrapur Lift Irrigation Secheme Ta. Parseoni Dist- Nagpur .
Providing private security, sweeping and cleaning to Pump House at Janai Lift Irrigation Scheme Stage III- At/po- Vadhane, Tal- Baramati, Dist - Pune
Construction of RCC Compound wall for Ransingwadi Shaft of Andhali Tunnel under Guruvarya Late Laxmanraoji Inamdar Lift Irrigation Scheme, Tal. Koregaon, dist. Satara
Providing private security, sweeping and cleaning to Pump House at Janai Lift Irrigation Scheme Stage I- At/po- Varvand, Tal Duand, Dist - Pune
Providing, Supply, Erection, Testing and Commissioning of Surge Protection System for Rising Main of Deori Navegaon Lift Irrigation Scheme, Tal. Gondia Dist. Gondia.
Construction of RCC Compound wall for Vetane Shaft of Andhali Tunnel under Guruvarya Late Laxmanraoji Inamdar Lift Irrigation Scheme, Tal. Koregaon, dist. Satara
Strengthening works on the heavy embankment at RD 1500 to 2400 m on the Keshori Minor under Ambhora Lift Irrigation Scheme Stage-2.