Loading…
Loading…
10,111 results • Best match
Construction of Dry Rubble Check Dam, Gyabiyan at Warulwadi FC no 107, At Dingore FC no 50 and At Aalme FC no 51 in JUNNAR RANGE
Construction of Check Dam of dry stone masonry at Fhulawade F.C.No. 191 in Ghodegaon Range Cup No 4 Nala No 1 Bandh No 1 to 14
Construction of Check Dam of dry stone masonry at Nhaved F.C.No. 149 in Ghodegaon Range Cup No 4 Nala No 1 Bandh No 1 to 20
Construction of Gabion Check Dam in Compt. No. 54,55 at. Jamb in Chondi Part-1 beat in Chondi round of Patur range in Akola Forest Division.
Construction of Check Dam of dry stone masonry at Sawarli F.C.No. 175 in Ghodegaon Range Cup No 4 Nala No 1 Bandh No 1 to 16
Construction of Gabion Check Dam in Compt. No. 48,49 at. Chondi in Chondi Part-3 beat in Chondi round of Patur range in Akola Forest Division.
Strengthning Embankment and Canal Lining and Structure Repairs And Allied Work in KM 71 to 85 of Palkhed Left Bank Canal
M and R to Km No. 19 to 26 and Borkheda, Chanser Minors etc Drain Out, Nalla and Supply Labours in Rainy Season of Lower Girna Canal Lower Girna Canal Tal. Dharangaon Dist. Jalgaon
Carrying out irrigation management work including controlling of canal measurement of area preparation of Akarani Takta record in Rabbi and Hot Weather season for area under Jayakwadi Irrigation Sub Division No Wadigodri
Construction of Tailing to Shendri minor offtaking at RD 12220 M From Main Canal and Tailing to Kudegaon distributary offtaking at RD 2550 M of Branch III of GLBC
From Right Bank Canal, Dabhi Distributary of Pandhari Medium Project, Construction of Maroti Devasthan WUA Building, Dhanodi and Jalpurti WUA Building Bhandoli at village Dhanodi, Tq. Warud Dist. Amravati
Construction of Vantale, Soil Bandhara, Check Dam of dry stone masonry in Chakan Range At Wandre F C No 319,At Chinchoshi F C No 372, At Kude F C No 327, At Chimbali FC No. 360, At Chimbali Nala numbar 1 to 5 F C No 360 in Chakan Range
Repair of minor gates of Dagadwadi Main Canal of Khadakpurna Project.
Construction of Mechanised C.C. Lining of Darganhalli Canal KM 5/00 to 17/600 and Darshanal Deep Cut Canal KM 4/000 to 4/760 Of Ekrukh Lift Irrigation Scheme
Shirapur Lift Irrigation Scheme Stage II Construction of Pipe Distributon Network on RBC of Km 1 to 7 Minor No 1A 1 2 3 4 5 6 7 Including sub Minors Including formation of WUA Running and Maintenance of the system for Five years and Handing over
Construction of Service Road Bridge at Aqueduct at RD. 6900 m, 7980 m, 8540 m, Drop H.P.Culert at Rd 12160, 13060 m and Construction of Escape at Rd 520 m of LBC and Excavation of bal. work on LBC and RBC of Upper Manar Lift Irrigation Scheme.Latur
Construction of Additional 1x50 MVA 132 33 KV PTF with HV and LV bays along with Extension of 33KV Bus and 2 No of 33KV Bay at 132KV Dhule Substation for PH4 and PH5 under Sulwade Jamphal kanoli lift Irrigation scheme, Tal Dist Dhule Civil Work
Sina Madha Lift Irrigation Scheme RBC PDN Dy No.2 above main line ch No. 200 Sluice valve, ch No. 1680 Replacement of Scour valve Installation of Butterfly valve at Minor No. 6 ch No. 2180 and construction of RCC Chamber as well as replacement of bro
Repair and Maintenance of Canal Gates up to 0 to 33 km on Upper Wardha Irrigation Sub Division No.1 Morshi.
Repairs of Canal Structures Head Regulator and Dam Embankment of Rengepar Medium Project of Pandhari Section of Irrigation Sub Division Nawegaonbandh
Repair and Strengthening of Main Canal and distribution system of Koradi Medium Project Tq.Mehkar Dist. Buldhana under Maharashtra Irrigation Improvement Program.
CONSTRUCTION OF SUPER PASSAGE IN KM NO 12 AT CH.11035 M ON LEFT BANK CANAL OF ARUNA MEDIUM IRRIGATION PROJECT
Construction of Structure at Junction of Hatgegher Dam ,Main Canal No.2_Feeder _ RBC under Kudali Medium Irrigation Project Tal.Jaoli,Dist satara
Removing syphons on Main canal and Distributeries of N R B C within the juridication of Malshiras Irrigation sub division Malshiras
Work of Irrigation management in kharip and rabbi season at under the command of Bembla Main canal 0 to 35 KM
2701 M M Irrigation Project Laying Plastic Paper Ch 30600m To 30780m Of Ozarkhed Left Bank Canal Tal Dindori Dist Nashik
Carrying out irrigation management work of controlling canal in Rabbi and Hot Weather season for U.P.I.Sub Division No.3, Akhada Balapur
Construction Running commissioning remaining work of Minor 11 of Tillari Left Bank Canal in HDPE pipe network of Tilari Irrigation Project
Construction PDN Work of Shahapur Minor 1,2 and 3 on Left bank canal of Urmodi Irrigation project Tal. Satara Dist. Satara
Construction of protection wall at Koparde approach canal near village stream at Tondoshi Tal Patan Dist Satara under Tarali irrigation project
Construction of protection wall at Koparde approach canal near river at village Murud Tal Patan Dist Satara under Tarali irrigation project
Maintenance and Repairs to Canal and VRB for Pivardol Bandhara Project Left Bank Main canal
Construction and Repairs of HPD Canal Structures and Other Ancillary Works at Minor Distributary No. 10, 11 at Ch. 0 to 1090 Mouje Salokh, Ch. 0 to 1688 Mouje Done, Minor Distributary No. 12, 13, 14, 15 at Ch. 0 to 812, Ch. 0 to 900 Mouje Gaurkamat,
Carrying out irrigation management work including controlling of canal,measurement of area preparation of record in Rabbi and Hot Weather season Year 2021-22 for Left Bank Canal on Lower Dudhana Project
Carrying out irrigation management work including controlling of canal measurement of area preparation of record in Rabbi and Hot Weather season Year 2021-22 for Right Bank Canal on Lower Dudhana Project
Construction of protection wall and protective mesh for Tunnel shaft, Resectioning of canal from 0 to 26 km, Protection Wall/Bund for Jankapur Tank on Ghodazari branch canal.
Carrying out irrigation management work including controlling of canal measurement of area preparation of Akarani Takta record in Rabbi and Hot Weather season for area under Jayakwadi Irrigation Sub Division No 03 Tirthapuri
Carrying out irrigation management work including controlling of canal measurement of area preparation of Akarani Takta record in Rabbi and Hot Weather season for area under Jayakwadi Irrigation Sub Division No 15 Tirthapuri
Carrying out irrigation management work including controlling of canal measurement of area preparation of Akarani Takta record in Rabbi and Hot Weather season for area under Jayakwadi Irrigation Sub Division No 01NNN Paithan
Repair of compound wall of yavatmal irrigation circle yavatmal
Construction of Part - I Work for Direct Outlet of Kosara Branch Canal offtake RD. 89730 m.on Bembla Main Canal
Strengthing of Embankment, Structure Repairing and Canal Lining In Patches Km. 1 To 4 Of Waghad Left Bank Canal and Other allied work.
Strengthening of Embankment, structure repairing and Canal Lining in patches KM 12 to 15 of Waghad Left Bank Canal and Other allied work.
Construction Of VRB at Chainage 9240 KM,km 14454 Of D1 of Lower Girna Canal
Repair of Head Regulator of D.O. At RD 6000 m. on the Itiadoh Main Canal
Cleaning premises and construction of compound wall around colony in Irrigation section, Warud
Repair of HPD and resectioning of canal from Ch7(6/885m) to 9(8/230m) of Surya Right Bank Canal Palghar Branch No .2
Strengthning of Embankment and Canal Lining in KM10-11 of Palkhed Left Bank Canal and executing other allied works.
KKLI - (Takari Part) - Conversion of gates of Takari Main Canal Distributary No.42 to 66 into sluice valve and chamber ,Construction of Footbridge at Takari Main Canal in Km.11 and Km 12, Footbridge, Inlet in Km 28 , Village Road Bridge, Cart Track
BARSHI LIFT IRRIGATION SCHEME TAL. BARSHI, DIST. SOLAPUR - CONSTRUCTION OF BALANCE EARTHWORK AND STRUCTURES IN KM. 11 TO 14 OF RIGHT BANK CANAL STAGE-2.