Loading…
Loading…
10,111 results • Best match
Supplying of vehicles on rent basis to ZP Irrigation Department Aurangabad
Irrigating and Measuring area under crops in the command area and recording field books as per irrigation rules including ranging, Akarani patrak ( Form-12) with kulrujawat etc. including watch and ward of canal system during rotation year 2021-22 u
Repair of Canal Outlet Gate and its allied work on Dhom Balkawadi Right Bank Canal km 3.450 to 66.400 for Direct Outlet, Minor Distributary and Escape Gate.
Krishna Koyana Lift Irrigation Project Mhaisal LIS (Jath Part) - Construction Of Inlet at Ch.11/100, CTRB at Ch. 14/080, Super Passage at Ch 16/360, Nalla Fedding at Ch. 2/400 and Providing And Fixing HDPE Pipes between Km 12 to Km 19 on Sangola
Construction of dry rubble Check Dam At Kohinde Bk F C No 288, At Retavadi F C No 279, At Gulani F C No 267, Khed Range
Construction of Vantale, Conical Shape Water Pond, Dry Rubble Check Dam F C No 390A,390A, 804, 4, 567, 2, 141, 394, 1052, 13,14, 2257, 300, 333
Construction of Check dam structure no 01 to 10 on nala no.01 and 02 at mouje andhera com no.541 beat andhera D.raja round range D.raja
Muchkundi Minor Irrigation Project Tal. Lanja Dist. Ratnagiri. Construction of Ring Road
Construction of SamajMandir at Chavhanwadi Minor Irrigation Scheme Tal - Rajapur, Dist - Ratnagiri
CONSTRUCTION OF MINOR IRRIGATION SCHEME AT WAGHOLI MALAI TAL MAHAD DIST RAIGAD
Tulyachapada Minor Irrigation Scheme Work to convert existing underground pipeline into PDN
Replacement of old damaged Outlet Gate with Butterfly valve on Dhom Balkawadi Right Bank Canal km 68.100 to 99.085 for Direct Outlet, Minor Distributary and Escape Gate and allied work
Repair and lining work at the tunnel entrance of Kundal Distributary Ch 1210 on the Palus Branch Canal and removal of collapsed material from the deep excavation at Km 4
Natawad Adivasi Sahakari upsa Jal Sinchan Lift Irrigation Scheme at Natawad Taluka Nandurbar
Dongargaon mogra M I Tank and soundad kosabi chirchadi mahuli bopabodi palasgaon Raka labour for patrolling work during kharif Irrigation 2019-20 and Dongargaon M I Project main canal RD 300 to 3300 m Removing silt of canal and Strengthning of canal
Providing Labour On right bank of Tapi river and On HRBC For irrigation and Non irrigation management work under irrigation Section Yawal 2 for period of November 2024 to March 2025 Removing Silt and Grass From Inner side Of Canal and Repairing Of S
Dholemala khilare vasti, canal parisaratil shouchalay durusti karne.
AS PER SCHEDULE B AND GROUPING STATEMENT
Carrying out irrigation management work including controlling of canal,measurement of area,preparation of record in Rabbi and Hot Weather season Year 2022 and 2023 for Left Bank Canal on Lower Dudhana Project.
Strengthening and repair work Earthwork and Structures of Damaged Canal Network Damage Caused by Heavy rains and for restoring irrigation potential on Shirpur distributory, Giroli Branch Canal. Andori Distributory , Khangaon Distributory 2nd call.
Carrying out irrigation management work including controlling of canal,measurement of area,preparation of record in Rabbi and Hot Weather season Year 2022 and 2023 for Right Bank Canal on Lower Dudhana Project.
Repairs and Maintenance of Various Size of Canal Gates and Foot Bridge at ujjani Left Bank Canal. Dist. Solapur
Construction of underground pipe line system for Dahikute Right Bank Canal
Providing Repair to Embankment in between canal K. 18 to 21 of Ozarkhed Bank Canal and other allied works.
Palkhed Left Bank Canal Ch 545m to 745m and Ch 18740m to 19990m Strengthening of Embankment and Canal Lining
Providing Repair to Embankment in between canal K. 18 to 21 of Ozarkhed Bank Canal and other allied works.
4701 M and M project providing canal lining structure and embankment repair and other allied works from 51 to 70 km of Palkhed left bank canal.
Constructing VRB cum Supper Passage of KM 29 at Ch.28/240 on Bhatsa Right Canal.
Removing Silt and Grass From Inner side Of Canal and Repairing Of Service Road and Embankment By Filling Pot Holes Of Canal In Km 14 To 30 Of Hatnur RBC
Carrying out irrigation management work including controlling of canal measurement of area,preparation of record in Rabbi and Hot Weather season for Irrigation Sub Division Limbgaon Dist. Nanded
Manufacturing with fabrication and finishing of K.T.Weir Needle Gate, carry out M.S. welding of Fillet type joint using std. welding rods and painting to K.T. weir curved type needle gates Qty 650 Nos of size 2.15 0.5 Mtr with transporation at sit
Annual operation and maintenance for A) 2x5 MVA, 33/6.6 KV Transformer and Allied 33KV Switchyard Equipments at Khadakapurna Project LIS Stage -Mandapgaon, Waki, 4 MVA, 33/6.6 KV Transformer and Allied 33KV Switchyard Equipments at Bharosa B) 400 KVA
Annual operation and maintenance of A) 2 x 5MVA, 33/6.6 KV Transformer and allied 33KV Switchyard Equipments at Mandapgaon B) 2 x 5MVA, 33/6.6 KV Transformer and allied 33KV Switchyard Equipments at Waki C) 4 MVA, 33/6.6 KV Transformer, 1 x 160 KVA 3
Complete Overhauling and Repairs of 850 HP V.T.Pumps, Pump No.3 by replacing of required spares parts, Machining to existing parts, assembling of pump in original position And Erection, Testing and Commissioning of New Radiator Assembly Complete job
Annual operation and maintenance For two years of A) 5MVA , 33/6.6 KV Transformer and 33KV Switchyard Equipments at Khadakapurna Project LIS Stage -Mandapgaon, Waki, Bharosa B) 400KVA , 33/0.433 KV Transformer and 33KV Switchyard Equipments at Khad
Complete Overhauling and Repairs of 850 HP V.T.Pumps, Pump No.7 by replacing of required spares parts, Machining to existing parts, assembling of pump in original position And Erection, Testing and Commissioning of New Radiator Assembly Complete job
E - TENDER NOTICE NO. 04/01 For 2020 - 21
Gadnadi Medium Irrigation Project Tal. Sangameshwar Dist. Ratnagiri, Constructing Remaining earthwork and structure in Km 19 and 20 of R B Canal
Pipe Distribution Network for Command area of Sub Minor of Minor No.01 of Tilari Left Bank Canal of Tillari Irrigation Project.
Work of Irrigation management during Kharip and Rabbi season 2023-24 of command area under Bembla Main Canal KM. 36 to 51.
Balance Earthwork From ch.0.00 to 160 Mtr.of Aruna Right Bank Canal of Aruna Medium Irrigation Project, Het,Tal. Vaibhavwadi, Dist. Sindhudurg.
2701 M and M Irrigation Project Constructing C C Lining in Km 40 Of Ozarkhed Left Bank Canal Tal Dindori Dist Nashik
Estimate For Repairs Of Canal Works Under Mahatma Fule W.U.A. Of Section Rajurwadi Under Upper Wardha Irrigation Sub-Division No-1 Morshi
Work of Irrigation management during Kharip and Rabbi season 2025-26 of command area under Bembla Main Canal KM 36to KM 51
Construction of Balance Earthwork and Structures in K.M. No. 9, 10 and 11 of Left Bank Canal of ARUNA MEDIUM IRRIGATION PROJECT
CONSTRUCTION OF INCREASING HEIGHT OF SYPHON ENTRY CHAMBER AND SYPHON EXIT CHAMBER OF KOPARDE APPROACH CANAL DIST SATARA UNDER TARALI IRRIGATION PROJECT
Soil classification survey of Paithan Left Bank Canal Irrigation Project (Dy. 47 to 54 Approx.) Dist. Parbhani. for the year 202-21
Pipe Distribution Network for Command area of Minor No. 5, 6, and 7 of Tilari Left Bank Canal of Tillari Irrigation Project.
Repair and Strengthening of Main Canal and distribution system of Mas Medium Project Tq. Khamgaon Dist. Buldhana under Maharashtra Irrigation Improvement Program.
CANAL REPAIR WORKS FOR HANDING OVER OF COMMAND AREA TO WATER USER ASSOCIATION UNDER UPPER WARDHA IRRIGATION SUB DIVISION NO.4 DATTAPUR.