Loading…
Loading…
10,111 results • Best match
Construction of Road Bridge at Ch. 850 M and Nalla Crossing at Ch. 870 M and 980 M of Dharangaon Section of Lower Girna Canal of Girna Project.
Construction and Repairs of VRB at ch. 4500 m and Syphon at ch. 6205 m and 6749 m at Dahiwad section of Lower Girna Canal of Girna Project
Construction of Bitumen Road on Inspection Path at 10530 to 11530 m on Gosikhurd Right Bank Main Canal.
Repairing of Wing wall at Ch 17/968 m in Km no 18 of Bhatsa Right Bank Canal
CONSTRUCTION OF CTB at 1500 M AND STEELWALKAWAY at 1900,2400,4400,6600 M ON BRANCH CANAL OF GOSI BK LIS
CONSTRUCTION OF EARTHWORK AND LINING OF DISNET OF LM1,LM2,RM6 AND RM7 OF SHINDHI RAHATI BRANCH CANAL
Construction of Chowkidar shed - Observation house on Dam site at Yelondwadi Minor Irrigation Project Tal. Chiplun Dist. Ratnagiri.
Constructing concrete Guide wall in Restoration of Tail Channel of Minor Irrigation Tank Shinde, Tal. Peth, Dist. Nashik.
Repairs to CC lining in Km 82 to 84 of Kayadhu branch canal AND Repairs to HR of Minor No.91,96,101,106 of Kayadhu branch canal including Carrying out irrigation management work in Rabbi and Hot weather season 2025-26 under U.P.I.Section No.13
SPECIAL REPAIRS OF IRRIGATION TANK AT WADAD NO 1 TQ.MAHAGAON DIST - YAVATMAL
Construction of Escape Structure in KM 1 to 6 at Ch 03/550 Km of Wakurde Red Canal. Tal. Shirala Dist. Sangli
Construction of Dry Rubble Check Dam At Ghangaldare F C No 109 (1 to 7) and Construction of Gabion Structure of Dry Stone (1 to 2) At Buchakewadi F C No 100 in Junnar Range
2701 M and M Irrigation Project Reconstructing Head Regulator At Ch. 11800 m. of Dy no. 3 of Palkhed Left Bank Canal.
SPECIAL REPAIR TO IRRIGATION TANK AT PIMPALGAON NO.3 TQ - MAHAGAON DIST - YAVATMAL
SPECIAL REPAIR TO IRRIGATION TANK AT PIMPALGAON NO.3 TQ - MAHAGAON DIST - YAVATMAL
Repairs work For office of S.D.O Miner irrigation subdivision,Satara _ Krishnanagar Vasahat, Satara
Providing earthwork to 2R, 3R, 4R and 5R Subminors, CC lining, repairs to road bridges and outlets of DY 45 of Palkhed Left Bank Canal
Widening and Deepning of Tail Nalla of Canals to Divert water Into Purna Rivver tq chandur Bazar dist Amravati
Carrying out irrigation management work including controlling of canal measurement of area preparation of record in Rabbi and Hot Weather season for Hatta Irrigation Sub Division Siddheshwar Dist Hingoli
Fabrication and Erection of Locking arrangement for Balance work for gate of Head Regulator in K.M. 51 to 113 of Bembla Main Canal and gate of Head Regulator of Branch Canal, Distributory, Minors and Subminors
Repairs And maintenance work at Minor Project of Irrigation Section of Bindusra And Sindhphana of Irrigation Subdivision Beed and Carrying out irrigation management work on Minor Project of Irrigation Subdivision Beed
Repairs to Wai sub division office and section offices under Wai sub division viz. Dhom Irrigation Section Pachwad,Dhom Irrigation Section, Dhom Irrigation Section Anewadi-3, Dhom Irrigation Section Anewadi-4
Construction of Piped Distribution Network _PDN_ for Km No 08 _From Ch. 7/000 to Ch.8/000) of Morna Left Canal under Morna Medium Irrigation Project Tal.Patan, Dist.Satara
Supply of labour for watch and ward and irrigation management in Kharip season of C.R. cum Escape at R.D. 6300m, 13720m, 21860m and S.W.F. of Gosikhurd Right Bank Canal
Carrying out irrigation management work including controlling of canal, measurement of area, preparation of record in Rabbi and Hot Weather season for J.P. STAGE- II SD.No. 17 Kesapuri Camp.
Providing manpower by private agency Removing syphons on Main canal of NRBC and supply of Vehicals Under the jurisdiction of Phaltan Irrigation Sub Division Phaltan Tal Phaltan Dist Satara
Carrying out irrigation management work including controlling of canal, measurement of area, preparation of record in Rabbi and Hot Weather season for F.C.L. sub dn no 10, Kesapuri Camp.
Repairs Strengthening and Restoration of Structures and Earthwork with selected Lining of Mula Right Bank Canal Branches and Dys thereon of Mula Project Under Maharashtra Irrigation Improvement Programme MIIP
Construction of Piped Distribution Network _PDN_ for Km No 07 _From Ch. 6/000 to Ch.7/000) of Morna Left Canal under Morna Medium Irrigation Project Tal.Patan, Dist.Satara
Construction ,Running ,commissioning remaining work of Minor 4,minor 6 and branch minor 2 of minor 5 of Tillari Right Bank Canal HDPE pipe network of Tillari Irrigation Project
Carrying out irrigation management work including controlling of canal, measurement of area, preparation of record in rubbi and hot weather season for JISD 01 Nathangar North Paithan Dist. Aurangabad
Construction of RCC Retaining wall to Stabilize slope at ch 20.400 in km 21 and Allied Work in km 23 of Left Bank Canal of Tillari Interstate Irrigation Project
Construction of Piped Distribution Network _PDN_ for Km No 06 _From Ch. 5/000 to Ch.6/000_ of Morna Left Canal under Morna Medium Irrigation Project Tal.Patan, Dist.Satara.
Providing and executing shotcrete lining works for sidewall and bed protection in the tunnel section at Km 1.00 of the Left Bank Canal under the Aruna Medium Irrigation Project
Estimate for Supplying Labour and Measurment clerk for Irrigation Management Work Irrigation Subdivision Islampur
CARRYING OUT REPAIRS TO IRRIGATION WORKS UNDER IRRIGATION SECTION MUKHED TAL. MUKHED DIST. NANDED
Repairing of Hume Pipe Drain in Km 1- 9 of Bhatsa Right Bank Canal.
Removing wet silt and shrubby jungle of main canal and supplying labour for irrigation at ch 0 to 2 Km of Anchale MI Tal Dist Dhule,main canal Ch 0 to 6 Km and Dy No. 1 and 2 of Khandly MI, Main canal at Ch 0 to 5 Km and RBC of Shirdhane MI Tal Dist
JOBWORK OF REPAIRS TO CANAL GATES WITH MOTORISATION PARTS AT MOHOL CANAL
Palkhed Left Bank Canal Dy. No- 9 and 12 Earthwork, repairs to structure, Lining, Dy 5 to 12 road bridges repairs and executing other allied works
Construction of Boundary Stones for Demarcation of 38.8022 ha. forest land in the Construction of Creating Irrigation Potential of 5440 Ha. of Sub Branch-3 by Pipe Distribution Network with booster Pump House and Creating Irrigation Potential of 3000
Construction of RCC Tail Channel for Escape RD 10150 m on Gosikhurd Left Bank Main Canal
CONSTRUCTION OF ESCAPE AND ITS TAIL CHANNEL 9600 M ON BRANCH CANAL NO 2 OF GLBC
Construction of VRB at Ch.1/830 in Km.No.2 of Wakurde Red Canal , Tal.Shirala, Dist.Sangli.
Construction of Part - I Work on Minor No. 18 To 21 of Kosara Branch Canal.
Supplying Labour AND Measurement clerk for irrigation Management work Irrigation Sub Dn Miraj
Supplying Labour and Measurement clerk for irrigation Management work Irrigation Sub Dn. Ashta
Providing mazdoor through outsourcing agency for irrigation management under Dhom Irrigation Subdivision, Koregaon.
Hot Weather Irrigation and Management work for Year 2022-23 on Irrigation Sub.Dn.Nawegaonbandh
Carrying out irrigation management works under Irrigation Sub Division Bhokar, Tal. Bhokar, Dist.Nanded