Loading…
Loading…
5,165 results • Best match
Topographical Survey and Soil investigation for construction of Bridges, X-Regulator and Head Regulator of Rajasthan Feeder at RD 242809 and Sirhind Feeder at RD 187292 in Ferozepur Canal Circle.
Topographical Survey and Soil investigation for construction of Bridges, X-Regulator and Head Regulator of Rajasthan Feeder at RD 184655 and Sirhind Feeder at RD 129361 in Ferozepur Canal Circle.
Reconstruction/Relining with concrete M-15 from RD 12125 to 34295 and Construction of fall at RD 16890 of choa link -2 off- taking RD 372970/L of BML Canal.
Topographical Survey and Soil investigation for construction of Bridges, X-Regulator and Head Regulator of Rajasthan Feeder at RD 226259 and Sirhind Feeder at RD 170778 in Ferozepur Canal Circle.
Topographical Survey and Soil investigation for construction of Bridges, X-Regulator and Head Regulator of Sirhind Feeder at RD 157306 and at RD 157309 (X-Regulator) in Ferozepur Canal Circle.
Topographical Survey and Soil investigation for construction of Bridges, X-Regulator and Head Regulator of Rajasthan Feeder at RD 204225 and Sirhind Feeder at RD 148473 in Ferozepur Canal Circle.
Special Third Party Independent Techno Financial Audit for the work Project for Reconstruction of various Distributaries by concrete Lining and other works in Abohar Canal and GW Division under PIDB
Topographical Survey and Soil investigation for construction of Bridges, X-Regulator and Head Regulator of Rajasthan Feeder at RD 262469 and Sirhind Feeder at RD 206794 in Ferozepur Canal Circle.
ESTIMATE FOR HIRING OF JCB MACHINE FOR RESTORATION OF WATER COURSES (WITH DIESEL, MAINTENANCE, DRIVER AND ALL OTHER EXPENSES) FROM RD 44.800 TO 59.500 KM. OF KANDI CANAL STAGE-1.
CONSTRUCTION OF RECHARGE SCHEME EXCLUDING INJECTION WELL TO AUGMENT GROUND WATER TABLE BY ARTIFICIAL RECHARGING TO GROUND WATER USING CANAL WATER AT SMALSAR REST HOUSE SUB DIVISION GHOLIA , CHANNUWALA (MOGA)
Repair and Restoration of Distribution system of (OL5 RD 8000)Laying underground UPVC pipeline of Saroya Distributory off Taking at RD 112.526 km Right side of Kandi Canal Stage-2
EXPRESSION OF INTEREST (EOI) FOR SETTING UP OF 40 MW CAPACITY GRID CONNECTED SOLAR PV POWER PROJECT ON BUILD OPERATE OWN (BOO) BASIS, ON CANAL NETWORK IN STATE OF PUNJAB
Providing and laying of high density polyethylene HDPE Pipeline including all allied works with material as per DNIT from Sewerage treatment Plant Gidderbaha district Sri Muktsar Sahib for Supply of Treated Water for Irrigation
Augmentation of Water Supply System by Drilling of tube well no.1,2, 3, 4, 5 along canal including construction of pump chamber, pumping machinery with pressure gauge, bulk flow meter at each tube well, chlorinator, electrical works at Jagraon
Estimate for Running and Maintenance of 2 No. Lift schemes and 2 No. Sub Surface Drainage Scheme falling in jurisdiction of Irrigation Project Sub Division No. 2, Drainage Malout for the period 01.04.2021 to 31.03.2022
Estimate for Running and Maintenance of 8 No. Lift schemes and 4 No. Sub Surface Drainage Scheme falling in jurisdiction of Irrigation Investigation Sub Division No. 2, Drainage Gidderbaha for the period 01.04.2021 to 31.03.2022
Restoration of damaged brick lining and filling Ghara and applying laying of sand earth bags on side slope of bank between Rd 61100 to 71084 mtr of Kandi Canal Stage II
Upgradation and Improvement of road Majhi to Channo Bharo road via Phumanwal_Kheri Gillan_ Shahpur_Majhi to Phumanwal road_ Shahpur to Channo_Bharo road_ Phumanwal to Sangrur Patiala road along canal under NABARD_XXV Scheme
Carrying out Topographical, Geological, Geotechnical Investigations, and Preparation of Detailed Project Report (DPR), Cost Estimate for Upper Bari Doab Canal (UBDC) Hydel project stage-III including Technical Specifications and Tender Documents
Clearing Syphon Aquaduct at RD 77934 of Kandi Canal Stage-II crossing Rajni Devi Choe near Village Parsowal for unobstructed flow of flood water in Rajni Devi Choe in Distt. Hoshiarpur
P/L of WBM, BM,PC, SDBC on Road in Kalia Colony Phase 2, G.A.D Nagar, Salempur Mussalmana, New G.A.D Nagar and Adj canal near Kalia Colony etc. ward no. 2
Upgradation of Sahora Kandi to Garhdiwala Raghwal Road upto Pandori Atwal along Kandi Canal Length 23.650 KM Package No. PB07321 under PMGSY III BATCH III including the maintenance of 5 years.
Estimate for restoring lining of unlined gaps/Damaged patches in b/w RD 85175-85385, Outlet at RD 85355/L and Barrel Crossing under canal at RD 85255 of Uddat Branch.
Estimate for Construction of new pond at Pond at Village Tota Singh Wala and linking them with outlet at Khanna Minor RD 376/L under Ludhiana Canal and G.W. Division, Ludhiana.
Estimate for Construction of new pond at Pond at Bassian Bet Rest House and linking them with outlet At RD 137300 of Sidhwan Branch under Ludhiana Canal and G.W. Division, Ludhiana.
Estimate for Lining OF Watercourses of O L RD 16946 L of Patti Disty y Laying of PVC U G Pipeline of Khdoor Sahib Distirct Tarn Taran under UBDC Canal System
TENDER FOR WIDENING OF CANAL BRIDGE (3 SPAN 6 MTR MTR EACH AND 2 MTR SPAN 6 MTR EACH) ON LINK ROADS DAKHA TO ISSEWAL MC MULLANPUR DISTRICT LUDHIANA. LDH2021-195
ESTIMATE FOR THE EXTENSION OF ALREADY LAYED UNDERGROUND UPVC PIPELINE OF THE OUTLETS 50/R, 50/L, 850/R AND 1800/L OF FATEHPUR MINOR OF KANDI CANAL STAGE-1, HOSHIARPUR
Rising and Protection(barbed Wire) of Boundary wall, Sluice Valve Chamber and Providing basic Facilities to field staff at Bhaddi Lift Scheme at RD 129.00 KM of kandi canal Stage -2
Providing and Laying of DI K-7 Water Supply Pipe Line, UPVC Pipe Sewer Nehri Rest House to Jauda Pull along the canal at Rampura Phul Distt. Bathinda. (As Per DNIT)
Construction of Recharge scheme to augment Ground Water Table by artificial recharging to Ground Water using Canal Water in Bathinda district of Punjab at 435000/R of Bathinda Branch, Block Bathinda
Construction of Recharge scheme to augment Ground Water Table by artificial recharging to Ground Water using Canal Water in Bathinda district of Punjab at RD 376950 of Bathinda Branch, Block Nathana
Estimate for Construction of new pond at Pond at Noorpur Rest House and linking them with outlet At RD 100/R of Daulatwah Disty under Ludhiana Canal and G.W. Division, Ludhiana.
Repair and restoration of damaged Saroya distribution system of outlet off taking at RD 2700 m of Saroya Distributory offt aking at Rd 112.526 km right side of kandi canal stage-2
Estimate for Running and Maintenance of 8 No. Lift Scheme and 4 No. Sub Surface Drainage Scheme falling in the Jurisdiction of Irrigation Investigation Sub Division No. 2, Drainage Gidderbaha for the period 01.04.2022 to 31.03.2023
Estimate for Running and Maintenance of 2 No. Lift Scheme and 2 No. Sub Surface Drainage Scheme falling in the Jurisdiction of Irrigation Project Sub Division No. 2, Drainage Malout for the period 01.04.2022 to 31.03.2023.
Providing Public Health ieTw Pumping Machinery Estate WS Estate Sewerage Water Cooler and AIR Conditioning Rain Water Harvesting System Fire fighting System Irrigation System and Design and Construction of Swimming Pool in construction of Sports Stad
Estimate for Repair and Restoration of Distribution system of (OL6 RD 10000)Laying underground UPVC pipeline of Saroya Distributory off Taking at RD 112.526 km Right side of Kandi Canal Stage-2
Construction of HL Bridge 3 Span 16 00 M each Over SYL Canal X-kg Kami Kalan to Jand Mangoli road (RD 500 M) including its approaches in MC Ghanour Distt. Patiala
Re Construction of HL Single Span Steel Bridge 42.00 mtr. Long cc of bearings on BML Canal Crossing Retgarh Shuttrana road including its approaches, Retaining walls and replacement of slab of culverts.
Topographical Survey and Soil investigation for construction of Head Regulator of Sirhind Feeder at RD 403037 of Kakhanwali disty and X-Regulator of Sirhind Feeder at RD 441495 in Ferozepur Canal Circle.
Rough Cost Estimate for Prov./laying of 16inch dia RCC NP3 storm sewer and Construction of Road Gully from Gill Canal Bridge upto M.C. Limit in front of G.N.E collage (Part-II).
Rough Cost Estimate for Prov./laying of 16inch dia RCC NP3 storm sewer and Construction of Road Gully from Gill Canal Bridge upto M.C. Limit in front of G.N.E collage (Part-I).
Restoring water capacity by Clearing Syphon Aqueduct at RD 77934, RD 76020, RD 84000 and ED 63300 of Kandi Canal Stage-II crossing Rajni Devi, Chabbewal choe, Bahowal Choe in Distt. Hoshiarpur.
Providing and Laying 80mm thick interlocking paver on Link Road F.F. Road to Dhani Hari Chand Along Canal 0.50 Km. upto Binder House in Market Committee Jalalabad, Assembly Constituency Jalalabad, District Fazilka
Repair of Damaged points Due to Seepage of Rain Water Through Katcha Central Verge of Patiala Sangrur Road from Thikriwala Chowk to BML Canal RD 56.750 to 62.750 Effected length 954 Mtr
Construction of High Level Bridge Single Span 45 mtr Over Narwana Branch Canal X-ing Sarala Kalan to Naneola upto Haryana Border RD 0 m in Lieu of Old and Narrow Bridge
Estimate for Repair and Restoration of Distribution system of (OL4 RD 5380)Laying underground UPVC pipeline of Saroya Distributory off Taking at RD 112.526 km Right side of Kandi Canal Stage-2
Estimate for providing protections D/S eroded/ washed away portion of Mehangrowal choe super passage of Kandi Canal at R.D 52.026 Km caused due to heavy rain fall on 2011 and onwards.
Widening Of Narrow Bridges 2 Span 5.107 M Each Over Bist Doab Canal Crossing Link Road Kot Fatuhi, Panchhta Road to Ajnoha Including Approaches And Replacement Of Slab. MC Garhshanker Distt. Hoshiarpur