Loading…
Loading…
9,452 results • Best match
Construction of Drainage Syphon at km. 2.400 of Didauli Distributary.
Construction of Drainage Syphon at Km. 13.900 of Didauli Distributary.
Construction of Drainage Syphon at km. 7.750 of Didauli Distributary.
Construction of Drainage Syphon at km. 8.100 of Didauli Distributary.
Construction of Drainage Syphon at Km. 14.540 of Didauli Distributary.
Construction of Drainage Syphon at km. 6.330 of Didauli Distributary.
Construction of Drainage Syphon at km. 6.850 of Didauli Distributary.
Construction of Drainage Syphon at km. 7.750 of Didauli Distributary.
Construction of main canal with C.C. Tiles Lining of 20 m gap D.S to km. 9.275 of M.G.C. stage-II
Repair and Renewal with P.c of Sharda Canal Hardoi Branch right side patri Chaudhari Khera Salind road tak in Km. 12(200), 13, 4(800)
Renewal work of damaged canal service road B/W Km 3.000 to Km 4.000 of Saloni Minor
Renewal work of damage canal service road Right Main Dy B/W Km 14.650 to Km 15.924
Renewal work of damage canal service road Right Main Dy B/W Km 15.930 to Km 17.052
Upper Ganga Canal Ke Km 34.630 to Km 36.350 ke madhya nahar sewamarg ke navinikaran ka karya
Renewal work of damaged Canal Service Road b/w km 12.600 to km 14.850 of Deoband Branch
Renewal work of damage canal service road Right Main Dy B/W Km 11.960 to Km 13.153
Renovation of lawn and laying HDPE irrigation pipe line work between police chowki to SP office in area of gomti river front , marine drive
CONSTRUCTION OF TYPE-1 RESIDENCE, BOUNDARY WALL, INSPECTION HOUSE, ROAD AND SUB-DIVISION OFFICE IN PARTAWAL COLONY AT IRRIGATION DIVISION GORAKHPUR IN DISTRICT MAHRAJGANJ.
M/o (Two year Repairing of Irrigation line from UGR, STP-50 to J-Block, Sector 41 and Golf Course to Botanical Garden) Noida
WATER IRRIGATION AND TIME TO TIME COMPOST WORK AND PLANTATION OF TREE NEAR TAJ GANJ TRAINING UNIT AGRA NAGAR NIGAM ZONE-3 (PART-1)
Erection of 03 Nos. old gate shutter assembly after repairing and maintenance at Km. 16.200 Fatehpur feeder under juridiction of Irrigation Division, Kanpur Dehat
M/o (Two year Maintenance of Irrigation line from UGR, STP-50 to J-Block, Sector 41 and Golf Course to Botanical Garden) Noida
Construction work of two additional suites and internal roads etc. in the inspection building of the Irrigation Department in Shahjahapur district (Lot No.-1)
Repair/Renovation work of Sub Division-I and Jiledari Office of Maudaha dam construction division-I, Mahoba at Irrigation colony Bazariya Mahoba.(Lot-04)
WATER IRRIGATION AND TIME TO TIME COMPOST WORK AND PLANTATION OF TREE NEAR TAJ GANJ TRAINING UNIT AGRA NAGAR NIGAM ZONE-3 (PART-2
Outer Development (C/o Retaining wall for main drain along 45.00m wide road from Sector-136 Red Light upto Irrigation Drain Near Advant) Noida
Construction of C.C. road and drain along Irrigation Rajwaha, sewer work and repairing of C.C. road in village Ghori Bachera (Balance work), Greater Noida
Resurfacing of road (P/L DBM and BC work on 45M wide road between Sector-78 and 101 Hanuman Murti to Irrigation Nala), Noida
M/o Road (Providing and Laying C.C. Pavement Back Side Nar Vihar-I and Pocket B-9 along Irrigation Drain in Sector-34) Noida
M/o Road (Reconstruction of RCC Footpath at Crossing of Sec-82,92 and 93 to Irrigation Drain in Janpath Marg in Sec-92) Noida
Manufacturing / Casting and Providing of Rollar, Nut, Housing, Handle, tyre Pulley Spur Gear (as per BOQ and Drawing ) FOR at Irrigation Work Shop Bareilly.
Construction of pre Cast Boundry Wall of Bariyarpur and Majhgay inspection House under IInd Sub Division of Irrigation Division IIIrd Banda. (LOT-01) Retender
Construction of four nos. Type-IV and eight nos. Type-III residential units under Irrigation Division-I in Lakhimpur Kheri district (Lot No.-3)
Strengthening of Road (P/L DBM and BC work, Raising of Culverts on NEPZ Road Sector-81 to Irrigation drain in Sector-81) Noida
Work of boring in Krishan Dev Nagar Colony Park, Installation of new submersible pump and laying of pipeline for irrigation in the entire park
SUPPLY, INSTALLATION, TESTING, COMMISSIONING, OPERATION AND MAINTENANCE OF REAL TIME DATA MONITORING FOR EASTERN YAMUNA CANAL SYSTEM OF IRRIGATION AND WATER RESOURCES DEPARTMENT UTTAR PRADESH
2. Repair of Bridge on eastern yamuna canal at janta road to Pikki Devla Bijopra Bhojpur road (ODR.
Renovation/Repairing of Canal Service Road of NPC Km 0.081 to Km 0.450 L/S, Km 0.300 to Km 0.840, Km 0.926 to Km 1.300 R/S and Km 4.500 to Km 5.130 R/S of NPC in Head section
RESTORATION OF INTERNAL SECTION OF CHAUDHARI CHARAN SINGH MAIN CANAL DOHARIGHAT FROM KM. 4.800 TO KM. 51.200 IN DISTRICT MAU.
Construction of Dry stone pitching at U S and D S of V.R.B. at km 1.500 of Kabrai main canal.
Construction of Drainage Syphon at Km 0.900 of Badausa Minor off Taking at Km 1.200 of Rasin Right Main Canal.
Road safety work on the Gariagaon link road on the other side of the canal from Shivpuri road in Jhansi district
Work of repair of concrete structures and demarcation of canal land from km 0.00 to km 20.840 (Tail) of Bhadan Rajwaha.
Interlocking road and drain construction work from canal track to painted road via primary school in Gram Panchayat Ambarsot. Block Nakaha
Renovation work of the left side service road of the canal from Km 86.400 to Km 92.000 of Fatehpur Sikri branch
Estimate for Jungle Clearance and Bed and Berm Scrapping and Silt Clearance from Km.0.000 to 13.630 of Siaori Main Canal
Improvement of street by C.C Danakhori From Canal Road To H.N 68/115 To 68/112A in ward-90 zone-01
Rehabilitation of minor bridge no 4/2 situated on Dariyabad branch Sharda Sahayak Canal in km 4 of Dariyabad Barinbag road
CONSTRUCTION OF BOUNDARY WALL, SECURITY WALL AND M and R OF EXISTING CONTROL ROOM BUILDING AT PUMP CANAL BHODI, DISTRICT- PRAYAGRAJ
Construction work of Minor bridge of 5x4x4 meter span on Orai Kotra road km 19 (Hamirpur Branch Canal) in Jalaun district