Loading…
Loading…
9,458 results • Best match
SUPPLY OF PVC REWINDING WIRES IN IRRIGATION DEPARTMENT
PEA GRAVEL FOR BOREWELL PACKING AS PER IS: 4097
PEA GRAVEL FOR BOREWELL PACKNIG AS PER IS: 4097
PEA GRAVEL FOR BOREWELL PACKING AS PER IS: 4097
Extraction of sand by Mannualy or with Rajasthani Tractors, from bed of Canal during closer period October, November 2023 between Km 64.000 to Km. 66.000 of Sharda Sahayak Right Feeder Channel. (Lot No.-7)
Under District Sultanpur, Interlocking construction work in Block Jaisinghpur, in village Maukedehextending from the paved road, passing through Brijesh Mishras residence, up to the pitched road along the Mahmudpur Canal embankment, Lot No 12
Extraction of sand by Manually or with Rajasthani Tractors, from bed of Canal during closer period October-November 2022 between Km 42.000 to Km. 42.900 of Sharda Sahayak Right Feeder Channel. (Lot No.-05)
Extraction of sand by Manually or with Rajasthani Tractors, from bed of Canal during closer period October-November 2022 between Km 37.500 to Km. 39.500 of Sharda Sahayak Right Feeder Channel. (Lot No.-04))
Extraction of sand by Manually or with Rajasthani Tractors, from bed of Canal during closer period October-November 2022 between Km 26.500 to Km. 27.800 of Sharda Sahayak Right Feeder Channel. (Lot No.-01))
On Occassiom of Mahakumbh 2025, Repair and painting Work on Mohan Road Bridge Chauraha to hardoi Ring Road Agra Express way 4 lane Canal Road Lucknow Branch (Shakuntala Mishra Turn to Para) (Civil Work)
Extraction of sand by Mannualy or with Rajasthani Tractors, from bed of Canal during closer period October, November 2023 between Km 79.550 to Km. 81.300 of Sharda Sahayak Right Feeder Channel. (Lot No.-11)
Extraction of sand by Mannualy or with Rajasthani Tractors, from bed of Canal during closer period October, November 2023 between Km 47.500 to Km. 48.600 of Sharda Sahayak Right Feeder Channel. (Lot No.-5)
Construction of a new 3x3 meter culvert in place of the narrow bridge on the Amethi Rajwaha canal at kilometer 7 of the Gauriganj-Musafirkhana road to Basupur other district road in Amethi district
Extraction of sand by Manually or with Rajasthani Tractors, from bed of Canal during closer period October-November 2022 between Km 60.800 to Km. 61.900 of Sharda Sahayak Right Feeder Channel. (Lot No.-11))
Extraction of sand by Manually or with Rajasthani Tractors, from bed of Canal during closer period October-November 2023 between Km 86.700 to Km.87.800 of Sharda Sahayak Right Feeder Channel. (Lot No.-16)
Reconstruction of 07 No VRB s of Puramunai Mr. at km 0.500, 0.950 and 1.500 Darshni Mr. at km. 1.900 and Bhagatpur Mr. at km. 2.800, 4.400 and 5.600 offtaking from Belan Main Canal.
Extraction of sand by Manually or with Rajasthani Tractors, from bed of Canal during closer period October-November 2022 between Km 42.900 to Km. 43.800 of Sharda Sahayak Right Feeder Channel. (Lot No.-06))
Extraction of sand by Manually or with Rajasthani Tractors, from bed of Canal during closer period October-November 2022 between Km 48.700 to Km. 50.000 of Sharda Sahayak Right Feeder Channel. (Lot No.-09))
Widening and strengthening work of the road from Chhacha Alipur Kheda to the canal embankment, passing through Rajwana, Dera Banjaran, and Sindhia Chowk, up to Gaggarpur GT Road (ODR) from kilometer 1 to 4
Extraction of sand by Mannualy or with Rajasthani Tractors, from bed of Canal during closer period October, November 2023 between Km 83.000 to Km. 84.850 of Sharda Sahayak Right Feeder Channel. (Lot No.-14)
Extraction of sand by Mannualy or with Rajasthani Tractors, from bed of Canal during closer period October, November 2023 between Km 29.000 to Km. 30.100 of Sharda Sahayak Right Feeder Channel. (Lot No.-1)
Extraction of sand by Mannualy or with Rajasthani Tractors, from bed of Canal during closer period October, November 2023 between Km 70.000 to Km. 73.000 of Sharda Sahayak Right Feeder Channel. (Lot No.-9)
Providing, laying, Testing and Commissioning of ISI marked 3 core, 400 mm2 HT cable cross linked polyethylene (XLPE) insulated, PVC outer sheathed cable at Chaudhary Charan Singh Dalmau A Pump canal stage 1st Raebareli
Construction of Cement Concrete Lining, Pucca Daula, Outlet in Bhoopauli Main Canal from Km. 0.280 to Km. 6.030 and Km. 6.506 to Km. 7.940 and VRB at Km. 0.400, Km. 10.070 and Km.16.500.
TN-08/EE/2024-25 Work of construction of precast boundary wall of Nagla Chand and Janupura Inspection Building complex under the second subdivision of Anupshahr branch section, Ganga Canal Meerut. Lot No-01
NABARD Funded Modernization of Doharighat Shayak Pump Canal, Dist- Ballia. Supply, Installation, Testing and Commissioning of L.T Panel for operation of Vacuum pump, Devwatering pump, Lighting of pump house, D.G set and ventilation etc.
1.Disperse Alloy.2.Zinc Poly .3.Zinc OXY.4.Root Canal .5.Pure Mercury 25 gm.6.DIAMOND BUR.7.Hand Reamers.8.Zinc Cements Powder .9.Tinctutre Iodine.10.Stainless Steel Wire.
Extraction of sand by Manually or with Rajasthani Tractors, from bed of Canal during closer period October-November 2022 between Km 44.900 to Km. 46.000 of Sharda Sahayak Right Feeder Channel. (Lot No.-08))
Extraction of sand by Manually or with Rajasthani Tractors, from bed of Canal during closer period October-November 2023 between Km 98.700 to Km.100.600 of Sharda Sahayak Right Feeder Channel. (Lot No.-23)
Work involving the shifting of electric poles, lines, and transformers which act as obstructions to facilitate the widening and strengthening of the Hirapur Kalan Canal Bank Road within the jurisdiction of the EDD Jahangirabad.
CONSTRUCTION OF CANAL FROM KM 9.130 TO KM 9.200 AND KM 14.00 TO KM TO 14.660 AND KM 16.900 TO KM 16.970 OF OF BAGARPUR DY UNDER M.G.C. PROJECT STAGE II IN DIST AMROHA
Ward No. 10 Construction of covered drain and CC road from Central Pathology via Raja Gond house on the canal to the Police Station boundary, and from Santosh Gupta house to Rajjanm Yadav tubewell.
Extraction of sand by Mannualy or with Rajasthani Tractors, from bed of Canal during closer period October, November 2023 between Km 30.300 to Km. 31.000 of Sharda Sahayak Right Feeder Channel. (Lot No.-2)
Extraction of sand by Mannualy or with Rajasthani Tractors, from bed of Canal during closer period October, November 2023 between Km 82.000 to Km. 82.895 of Sharda Sahayak Right Feeder Channel. (Lot No.-13)
Extraction of sand by Manually or with Rajasthani Tractors, from bed of Canal during closer period October-November 2022 between Km 43.800 to Km. 44.900 of Sharda Sahayak Right Feeder Channel. (Lot No.-07))
Extraction of sand by Mannualy or with Rajasthani Tractors, from bed of Canal during closer period October, November 2023 between Km 46.100 to Km. 47.500 of Sharda Sahayak Right Feeder Channel. (Lot No.-4)
Extraction of sand by Mannualy or with Rajasthani Tractors, from bed of Canal during closer period October, November 2023 between Km 39.600 to Km. 41.600 of Sharda Sahayak Right Feeder Channel. (Lot No.-3)
Construction Work Of Road On The Right Side Of The Canal From Gopia Barrage To Joganiya Bridge In Gramsabha-Joganiya Iin District Bahraich Financial Year 2024-25 (Vidhan Sabha-Balha) With Five Year Maintenance
Renewal work from PC along with general repair in Km 4 5 6 7 8 9 and 10 from Mudwara canal track to Gonda Audaha Kheda to Veera ODR With Hotmix Plant and Paver
Providing Commissioning Erection Testing including Carriage Loading Unloading charges of main ACB LT Panel with all accessories and complete in all respect at first stage of New Ramjanki pump canal block BadhokharKhurd distt banda
CONSTRUCTION AND MODERANIZATION OF 33 11 Ss CHAUDHARY CHARAN SINGH DUMARIYAGANJ PUMP CANAL BHITHARIYA 2X5 MVA UNDER THE EDD DUMARIYAGANJ SDN UNDER THE HEAD OF DEPOSIT SCHEME 2024 25 IN BASE OF SEMI TERNKEY
Laying B.O.E soling work from km. 36.239 to km. 39.219 of Attarra branch and from km. 0.000 to km. 1.750 of Kamasin DY. under IVth sub division of Ken Canal Division, Banda. Lot-08
Extraction of sand by Manually or with Rajasthani Tractors, from bed of Canal during closer period October-November 2022 between Km 74.200 to Km. 77.800 of Sharda Sahayak Right Feeder Channel. (Lot No.-13))
Extraction of sand by Mannualy or with Rajasthani Tractors, from bed of Canal during closer period October, November 2023 between Km 58.600 to Km. 59.600 of Sharda Sahayak Right Feeder Channel. (Lot No.-6)
Extraction of sand by Manually or with Rajasthani Tractors, from bed of Canal during closer period October-November 2022 between Km 62.000 to Km. 63.600 of Sharda Sahayak Right Feeder Channel. (Lot No.-12))
Construction of RCC box culvert in place of the narrow and damaged culvert located over the canal at Km 22 on the Tirgaon Sharifabad Satrikh Banki Tindola Chhidwahi Behata Road ODR in District Barabanki
Renewal of service road of Bhoopauli main canal from Km. 0.280 to 0.900, Km. 7.940 to 15.200, Km.16.700 to 17.400, Km 23.200 to 24.300,Km. 30.100 to 31.000 and Km 31.400 to 33.000
1. Construction of footpath from canal culvert towards the temporary Nagar Panchayat office on the west side under the development of the market in ward no. 10 and 14 of Nagar Panchayat Ghaghsara Bazaar
Providing and Laying 450 mm Dia, 6mm thick M.S. Pipe 3 mtr. Long and both end welded with new M.S. Flange at Veerasarai Pump Canal But New M.S.Flange will be provided by the Department
04/EE/2026-27 Janpad meerut me boundary road par sthit ganga canal colony me adhikshan abhiyanta, pratham mandal sinchai karya, meerut avasiya parisar mein karmchari awas ka nirman evam anya karya. (Lot-2)