Loading…
Loading…
17,251 results • Best match
Temporary barricating near 2 no bathing Ghat infront of Kapilmuni Ashramr under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in connection with G.S Mela-2023.
Maintenance and Cleaning of Shaikpur circuit office premises with Rest Shed under Arambagh Irrigation Sub-Division of Lower Damodar Irrigation Division for the year 2025-26.
Special repair to the quarter no B2A, B5B , B7A B4B including allied works within Kakdwip Irrigation campus under Kakdwip Irrigation Division in connection with G.S.Mela-2026
Rehabilitation of Rupai Irrigation Project Block Jhalda-I Dist Purulia.
Rehabilitation of Khairabera Irrigation Project within BlockPSBagmundi in District Purulia
Routine elctrical maintenance at Bhatbandh Irrigation colony and other offices.
INSTALLATION OF SOLAR POWER PUMP FOR IRRIGATION AT PANCHGHARA MOUZA.
Improvement of Hanumata Irrigation Scheme within Block- Balarampur, Dist-Purulia
Construction of CC Road from Irrigation Bandh towards Maharajpur Kobarsthan
Rehabilitation of Patloi Irrigation Project Block Purulia II Dist Purulia
Periodical maintenance of JHILLI MAIN DISTYCANAL for Khariff Irrigation 2023
REPAIRING OF ROAD FROM SUSHIL ROY HOUSE TO IRRIGATION DUM
Improvement of Saharajore Irrigation Scheme within Block Arsha, Dist Purulia
Improvement of Turga Irrigation Scheme within Block -Baghmundi, District -Purulia
Rehabilitation of Extn. Bandhu Irrigation Project, Block- Arsha, Dist- Purulia.
Construction of Irrigation pucca cannel at Gadhira within Binnabari G.P
Improvement of Beko Irrigation Scheme within Block - Kashipur, District- Purulia.
CONS.OF IRRIGATION PUCCA DRAIN FROM SAMIRUL BISWAS TO SANNER KHAL
CONSTRUCTION OF CULVERT WITH IRRIGATION CHANNEL AT CHELOD SUTRADHAR PARA
INSTALLATION OF 5HP SOLAR POWER IRRIGATION PUMPING SYSTEM AT KASHINATH
REPAIRING OF ROAD FROM SUSHIL ROY HOUSE TO IRRIGATION DUM
Construction of irrigation field channel from the L/o Nikhil Biswas towards the L/o Sunil Biswas at Taraknagar , Sansad No- XII, under Shibnibas GP under 15th FC (Tied Fund), AC NO- 67096858/23-24, AAP NO - 05/15th FC(Tied)
Installation of off-grid solar Irrigation pumping system for 2 Ha (SPSIS) with 2 H.P. Solar pumping system at at Bhowmiker pond Mouza- Digri(J.L No- 136) Plot No- 1363 under Krishnagar-I Block under Krishnagar-I (A.I) Sub-Division within the Juris
Installation of rig bore tube well 200mm x 150mm x 163mtr. Deep (by DTH rig machine) for irrigation purpose including fitting, fixing of Submersible pump at Ankurabaid Land of Uday, Mouza- Ankurabaid JL No. 258 Plot No. 224 under Bikna Gram Panchay
Drilling Installation and Maintenance of 150 mm dia Machine bored 4 Nos of Light Duty Solar Operated Tube well Scheme for irrigation and drinking waterMouza Atghara Amlidanga Bahargaon and Altor JLNo 170 242 247 and 267 Plot No 652 35 140 and 1024
Installation of rig bore tube well 200mm x 150mm x 163mtr. Deep (by DTH rig machine) for irrigation purpose including fitting, fixing of Submersible pump at Mankanali near house of Debabrata Dhua, Mouza- Mankanali JL No. 24 Plot No. 267 under Manka
SL 2 Drilling Installation and Maintenance of 150 mm dia Machine bored 4 Nos of Light Duty Solar Operated Tube well Scheme for irrigation and drinking water Mouza AraziJalsa Batijora Mallikpur IndrasailJL No 291 282 1 2 Plot No 65 1286 639 203
Installation of rig bore tube well 200mm x 150mm x 163mtr. Deep (by DTH rig machine) for irrigation purpose including fitting, fixing of Submersible pump at Laxmi pukur par, Mouza- Bhuteswar JL No. 208 Plot No. 348 under Sanbandha Gram Panchayat Ban
i- Installation of Submersible with pipe line for irrigation at mouza-Bankati, J.L. No. 123, Plot No. 32 at Morar GP under Bishnupur Block under 15th F.C.-TIED fund at Bankura Zilla Parishad, ii- Installation of Submersible with pipe line for irrigat
Installation of Rigbore Tubewell 200mm X 150mm X 200 mtr Deep (By DTH Rigmachine) Irrigation Purpose including fitting fixing of Submerssible pump at Mouza Radhanagar JL No 243 Plot No 160 and 154 under Purandarpur Gram Panchayat out of 15TH FC Fun
Installation of Rigbore Tubewell 200mm X 150mm X 200 mtr Deep (By DTH Rigmachine) Irrigation Purpose including fitting fixing of Submerssible pump Pitra Goria at Mouza Mukundrapur JL No 306 Plot No 1206 under Kostia Gram Panchayat out of 15TH FC Fund
Installation of rig bore tube well 200mm x 150mm x 163mtr. Deep by DTH rig machine for irrigation purpose including fitting, fixing of Submersible pump at Laxmi pukur par, Mouza- Bhuteswar JL No. 208 Plot No. 348 under Sanbandha Gram Panchayat Banku
A) CONSTRUCTION OF 70 MTR CC ROAD FROM NARAYAN KOLEY HOUSE TO BISWANTH KOLEY FACTORY (RS. 99631.00) B) CONSTRUCTION OF CC ROAD FROM BAPON GHOSH HOUSE TO PUKUR PAR BESIDE IRRIGATION BANDH (RS. 200000.00) C) CONSTRUCTION OF 20 MTR CC ROAD FROM AMALESH
Installation of Rigbore Tubewell 200mm X 150mm X 200 mtr Deep (By DTH Rigmachine) Irrigation Purpose including fitting fixing of Submerssible pump Upor Sirsara Village at Mouza Sirsara JL No 284 Plot No 7 under Kostia Gram Panchayat out of 15TH FC Fu
UP GRADATION OF DRAIN NEAR CINEMA MORE BARA PUKUR (MINI BAZAR TO HTC CANAL) NEAR LAKSHAN GHOSH HOUSE OF MOUZA-BASULIA, JL NO-105 PS-21 UNDER SATISH SAMANTA GRAM PANCHAYAT WITHIN MAHISHADAL DEVELOPMENT BLOCK UNDER APAS FUND.
Special repair to Rest shed and office building of Kangsabati Canals Division No. I, Amlagora, Mouza Amlagora, Block Garbeta-I, P.S Garbeta, District Paschim Medinipur 2nd call
Removing of water hyacinth of Natun Bazar khal at ward no 112 of K.M.C. under Tollys Nullah (I) Sub Division of Canals Division, during the year 2024.
Protection work on left embankment of Hooghly river for the length 100 metre Near F.C.I Godown, Mouza- Kalipur, P.S. - Budge Budge under charial section of Canals Division.
Soil Investigation work for the proposed extension of bridge at Ch 799.50 (over escape channel) of KSMC under Bolpur (I) Sub-Division of Mayurakshi South Canals Division.
Annual maintenance of Bagjola Part-II Khal from 6.00 Km to 11.00 Km by clearing and removing water hyacinth etc. under Canals Division from 01.04.2025 to 31.05.2026
Laying of HDPE pipe of different diameter by Horizontal Directional Drilling (HDD) process for crossing canals/rivers under South 24 Pgns W/S Division-I, PHE Dte.
Strengthening of Right Bank from Ch. 205.00 to Ch.210.00 of Ghl.B.C. under Basudebpur Section of K.C. SubDivision No IX of Kangsabati Canals Division No III Bishnupur.
Annual maintenance of Bagjola Part-II Khal from 0.00 Km to 5.50 Km by clearing and removing water hyacinth etc. under Canals Division from 01.04.2025 to 31.05.2026
M/R to 2 nos. of watercourse of Ch. 2287.00 of KSMC of Salar (I) Section-I under Salar (I) Sub-Division within Mayurakshi South Canals Division.
Construction of a pick-up weir cum Road Bridge over Sarsha Khal at Mouza-Rangamati, Block-Joypur, Dist.-Bankura under Kangsabati Canals Division No.III, Bishnupur, Dist.- Bankura.
MR to Inspection path from Ch.0.00 to Ch 28 of KBC under Basudebpur section of K C SubDivision No IX of Kangsabati Canals Division No III
Inspection Path from Ch 66 to Ch 140 of Dy No25 of BBC under Basudebpur section of K. C. SubDivision NoIX of Kangsabati Canals Division No - III
Laying of moorum over newly constructed Inspection Path on Ex-Zamindary Embankment for a length of 1.910 Km in Block-Ketugram-II under Mayurakshi South Canals Division.
Gate operation of Garankathi Sluice 2 Vent and Chitamari Sluice 2 Vent during Boro season of 2023-24 under Diamond Harbour I Sub Division of Canals Division.
Maintenance and repairing work of cut points of Kuye Babla right embankment along with guarding and watching of embankment ( aproximately 41.00 km) under Mayurakshi South Canals Division.