Loading…
Loading…
221 live92 closing this weekmost from PHE and Rural Development and Panchayat Raj Department
221 results • Best match
Day to day Operation and Maintenance of Distribution system and Rising main pipe line (CI / DI / UPVC / HDPE /FHTC) and allied works of RAMNACHANDPUR ZONE - II (Part - B) Piped Water Supply Scheme within NAWDA
Construction of 10 MLD Capacity Water Treatment Plant at Chooramudy (Balance Works)-General Civil Work
Restoration of pipeline, Providing sluice valve, Painting and minor repairing of Switch room, Clearing compound premises ,Remaining FHTC, making temporary earthen road and repairing of old valve chamber of Orgram Zone-II Piped water supply Scheme ,
Emergent shifting of UPVC distribution pipe line and FHTC due to widening of WBSRDA road from Tushkhali ghat to Atapur Kenaram High School within Tushkhali water supply scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte.
HIRWARI BAWANTHERI - ROUGH COST ESTIMATE FOR PROVIDING WATER SUPPLY FACILITIES FOR 45 NOS HOUSE HOLDS OF DHANI HAJIBAS OF VILLAGE HIRWARI BAWANTHERI BLOCK FP JHIRKA DISTT NUH BY LAYING OF 100MM PIPELINE , PROVIDING FHTC AND TESTING AND COMMISSIONING
Additional Laying of distribution Network System and Secondary rider main for DAKSHIN RAJAPUR PWSS, Block-Bhangar-I, Dist-South 24 Parganas to accommodate FHTC in Bhangar-I Block under South 24-Partganas, W/S Division-I, P.H.E. Dte.
Day to day Operation and Maintenance of Distribution system and Rising main pipeline (CI / DI / UPVC / HDPE /FHTC) and allied works, including Arsenic cum Iron Removal Plant of Modified Sujapur Sadipur Model (Capacity - 30.00 CuM/Hr) of MOKTARPUR P
Providing FHTC, Laying of the balance portion of uPVC pipeline and parallel pipeline, supplying of Sluice Valves and DI specials including 3 months trial run for Nabinagar Piped W/S Scheme at Kaliachak-I Block under MAAD (2nd Call).
Construction Approach Road, Internal Road, Land Development at Head Work, 2nd Tube well Site, Laying of Parallel/Dedicated Pipeline and Providing Balance FHTC of NASIPUR PWSS under Ratua-II Block under Malda Division, PHE Dte, Govt. of West Bengal.
Rectification or repairing of existing FHTC connection from /Each C.I./D.I./UPVC/HDPE/G.I./A.C. distribution pipeline with labour cost for cutting trench (1m X 0.9m X 1.2m for functional 135 nos and Installation of Sluice Valve under Talsur Water Sup
Laying Distribution pipeline at Augmentation of Bamunhati Piped Water Supply Scheme (Part E LDS FHTC of Northern Part of Palera Village) along with Road Restoration in Uluberia-II Block under Uluberia Sub-Division of Howrah Division, P. H. E. Dte.
Sinking of 200mm (all through) Big dia. Tube Well of 170 Mtr. Deep , Construction of Pump House, Interconnection and Laying of Dedicated/Parallel Pipe Line for improvement of FHTC functionality for FATEPUR Water Supply Scheme at Gazole Block of Malda
Package-4 Empanelment of Travel Agencies under Rate Contract for Hiring of Extra Premium SUV type Vehicles on Monthly and Daily Basis for five different categories of vehicles meant to be procured for the Mission Directorate under JJM, Assam.
Annual Operation and Maintenance of distribution system and rising main, pipeline, FHTC AC/CI/DI/UPVC/HDPE of JAULIA PWSS, Ujunia sisua PWSS, Matua PWSS at Bharatpur II Block of Kandi Sub-Division under Murshidabad Division, PHE Dte. for 1(one) year
Laying of Rising main in between Tube Well -2 (at OHR site) and Distribution Line and FHTC AND PIPE LINE AT JENARAR PARA under BHATAR Z-I PWSS in BHATAR Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. (SM/08033)
Package-5 Empanelment of Travel Agencies under Rate Contract for Hiring of MUV and Goods Carriers type Vehicles on Monthly and Daily Basis for five different categories of vehicles meant to be procured for the Mission Directorate under JJM, Assam.
Work of Construction of Intermediate CWPH at Kotra Baseri laying of Clear Water transmission main From Kotra to Naroli Nadbai via junction 2 at Naroli IPS Nadbai Nagar Ramgarh Kishangarhbas Tijara Jairoli and Bhiwadi based on HAM model under JJM
Work for Construction of Intake well inside Chambal River including Approach Bridge construction of RWR including all works required for inlet inside RWR outlet system from RWR to outlet chamber WTP CWR RWPH and allied works Package 1 under JJM
Work of construction of CWR and Block CWPH at various locations for clusters laying of transfer main from block PS to block CPS rising main from block CPS to Block ESRs, construction of ESRs laying of cluster distribution mains CABP Pck 3 under JJM
As per TD
standardization of Rates for supply and installation of Submersible/Surface Pumps (AC/DC), Controller of various capacities and make, HDPE pipe, Module Mounting Structure, Water distribution material along with other BOS of solar irrigation pump ... under JJM and ...