Loading…
Loading…
3,935 results • Best match
Creation of HT and LT line along with Substation.
Please refer BoQ
Refer to nemoncluture
Refer to BOQ
Refer to nemoncluture
PLEASE REFER TO BOQ
Creation of substation along with HT and LT Line
Creation of 63 KVA Sub station alongwith Erection of 11 KV line on 11 mtr., 9 mtr long ST poles, 30mm sq. ACSR weasel conductor and LT line on 8 mtr. long ST poles at WSS Tirshi Narore under JJM
Supply Installation, Testing, Commissioning of 02 Nos. 250 KVA and 02 Nos 100 KVA, 11/0.415KV Distribution Substations along with HT lines, Isolation Points and CT/PT Unit at various location of WSS Jal Shakti (PHE) Department under JJM Scheme.
Construction of 1.00 Lac Gallons SR, 0.70 Lac Gallons SR, 2 No. Pre Settling Tanks, 1 No. 0.03 MGD Slow Sand Filtration Plant, 8 No. Sluice Chambers, Approach Road, Chowkidar Quarter, 2 No. Pump Houses under JJM for WSS Lalpora Lolab
Refer to nemoncluture
Please refer
Creation of 63 KVA Sub stn. alongwith erection of 11 KV Line on 9mtr. ST poles at WSS Deot stage Dugwell
Please refer BOQ
Refer to nomenclature
Refer to nemoncluture
Refer to BOQ
Creation of 100 KVA Sub Station and 250 KVA Substation along with HT Line
Creation of substation along with HT and LT line
Handling, laying and joining by welding of departmental GI prefabricated 100mm diameter Medium Class GI Rising Mains
Refer to nemoncluture
Refer to nomenclature
Refer to nemoncluture
Handling, laying and joining by welding of departmental GI prefabricated 100mm diameter Medium Class GI Rising Mains