Loading…
Loading…
7,101 results • Best match
Retrofitting of PWSS under JJM at Village Bilha Block Pawai based on T.W. i.c. motor pump, laying and jointing pipe line, etc i/c cost of all material and labour with 90 Days Trial Run Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Imaliya Bhurekhan and Suhajni Block Gunour based on TW. i.c. motorpump, Construction of 75KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of ent
Design and Construction of Piped Water Supply Scheme under JJM of retrofitting all works of Villages 1.Ghasoi 2 Guradiya Pratap 3 Pardikheda 4.Khejdiya Megha 5 Sawdi of Sitamau Block Distt. Mandaur as per attach Detail BOQ and NIT
Retrofitting of PWSS under JJM at Village Itay Block Pawai based on TW. i.c. Construction of 75KL RCC OHT, 30KL Sump Well Cum , pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Retrofitting of PWSS under JJM at Village Sunehi Block Pawai based on TW. i.c. Construction of 75KL RCC OHT, 30KL Sump Well, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Retrofitting of existing PWSS of village Joba (Patlon) and Patharkathi of Block Lakhnadon INC CONSTRUCTION of 20,30 KL R.C.C. Sumpwell AND 75 KL R.C.C. OHT 12 Mtr. staging, INC all cost OF LAB MAT 90 days trial run UNDER JJM
Providing of Laying Jointing of Retrofitting of Piped Water Supply Scheme Under JJM in VILLAGE Titvi, kunkhedi, Bakka, MahatpurJawra, of BLOCK BHIMPUR Distt. BETUL 04 Nos. construction of 75-75 Kl, 50-50 Kl OHT 12 mtr stagging 20KL 30Kl Sumpwell
Retrofitting of PWSS under JJM at Village Barachh Block Panna based on TW. i.c. motorpump, Construction of 225KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting work of JJM Piped Water Supply Scheme at Village Baharpur Ryt Over Head Tank (ESR OHT) 75 KL Capacity 15 meter staging. R.C.C. sump well 20 Kl capacity with brick masonry pump house, And Village Kharidih Block Karanjiya Distt Dindori
Providing of Laying Jointing of Retrofitting of Piped Water Supply Scheme Under JJM in Villages CHURANI HATHNAJHIRI KHANDARA MANDAIBUJURG BORIKAS in Block BETUL Distt. BETUL construction of 75 KL AND 50 KL overhead tank 12Mtr. Staging and 20KL and 30
Survey, Investigation, Design and New Piped Water Supply Scheme at Village Parsel Block- Karanjiya Construction of Over Head Tank 75 KL Retrofitting work of JJM at Village Bargaon OHT 75 KL And Village Bhakha Dongri, Block- Bajag Sump 20 Kl
Design, Construction and Retrofitting of PWSS under JJM at Village 1 NAUGANWA 2.KHEDAWADA 3.GAJNIKHEDI 4.BIRGODA RANDHIR 5.MOLANA 6.KHEDANARAYAN 7.PALSODA 8.SIKANDERKHEDA Block Badnagar i/c construction of Sumpwells , laying and jointing of pipe line
Retrofitting of PWSS under JJM at Village Badera Block Panna based on T.W. i.c. motor pump, laying and jointing pipe line, etc i/c cost of all material and labour with 90 Days Trial Run Commissioning period of entire scheme.
Design, Construction and Retrofitting of PWSS under JJM at Village 1. SAMANERA 2.KHEDA PACHOLA 3.CHIKLI 4.DHABLA RAJPUT 5.DHABLA HARDU 6.TUKRAL Block TARANA including construction of Overhead Tanks, Sumpwells and laying and jointing of pipe line etc.
Retrofitting of PWSS under JJM at Village Dadwariya Block Panna based on TW. i.c. Construction of 50KL RCC OHT, Sumpwell cum pumphouse 20KL, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Design, Construction and Retrofitting of PWSS under JJM at Village 1.BACHHODA 2.SIMROL 3.ALOTJAGIR 4.BANJARI 5.BHUWASA 6.GURLA 7.NAWADA 8.KARONDIYA 9.GHUDAWAN Block KHACHROD including construction of OHT, Sumpwells , laying and jointing of pipe line
Retrofitting of PWSS under JJM at Village Garhi Padariya Block Panna based on TW. i.c. motorpump, Construction of 175KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sch
Retrofitting of PWSS under JJM at Village Phulwari Block Panna based on TW. i.c. Construction of 50KL RCC OHT, Sumpwell cum pumphouse 20KL, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Providing of Laying Jointing of Retrofitting of Piped Water Supply Scheme Under JJM in VILLAGE Bela, Khamapur, Dori, Palaspani of BLOCK BHIMPUR Distt. BETUL construction of 4 Nos. 75Kl, 50-50-50 Kl OHT 12, 15 mtr staging 20KL Sumpwell
Retrofitting of PWSS under JJM at Village Makrandganj Simariya Block Panna based on TW. i.c. motorpump, Construction of 125KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of enti
Retrofitting of PWSS under JJM with Construction of Sump well (As per BOQ) including all allied work at Village (1) Basia Gange (2) Dagrania (3) Belaighat (4) Deori (5) Ikpana Basona (6) Khajuria Guru (7) Khiriyanikhar (8) Kanoni of Block Rahatga
Retrofitting of PWSS under JJM at Village Chhiraha Block Pawai based on T.W. i.c. motor pump, laying and jointing pipe line, etc i/c cost of all material and labour with 90 Days Trial Run Commissioning period of entire scheme.
Retrofitting of PWSS under JJM at Village Kamtana Block Gunour based on TW. i.c. motorpump, Construction of 225KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
RETROFITTING OF EXISTING PWSS OF VILLAGE PATAN PATHARIYA TOLA DUNGRA TOLA JUWAN TOLA, KUDARI, BICHHUA, KHAKHARIYA GOLI TOLA AND MADHI OF BLOCK LAKHNADON OF DISTT SEONI I/C CONST OF RCC SUMP AND RCC OHT UNDER JJM GROUP No 06
Retrofitting of PWSS under JJM at Village Chhaparwara Block Gunour based on TW. i.c. Construction of 75KL RCC OHT, Sumpwell cum pumphouse 20KL, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sch
Retrofitting of PWSS of FHTC Constructions of RCC OHT 100 K.L and 2 nos 20 kl Sumpwell at vill Chalni and RCC OHT 100 K.L 15 mtr staging and 20 kl Sumpwell at vill Devhara laying and jointing of Pipeline of Block Ghughari of District Mandla
Retrofitting of PWSS of FHTC Constructions of RCC OHT 50 K.L at vill Dongarmandla, RCC OHT 50 K.L and Sumpwell 20 K.L. at Village Pipardon G, 2 Nos 20 kl Sumpwell at vill Kandra and laying and jointing of Pipeline of Block Ghughari of District Mandla
Retrofitting of PWSS of FHTC Constructions of RCC OHT 100 K.L 15 mtr staging and 2 Nos 20 kl Sumpwell at vill Chhatarpur and RCC OHT 75 K.L 15 mtr staging at vill Naijhar and laying and jointing of Pipeline of Block Ghughari of District Mandla
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages BILKHIRIYA Block Phanda Distt BHOPAL based on Tubewells including installation of Electric submersible motor pu
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages RATUA RATANPUR Block Berasia Distt BHOPAL based on Tubewells including construction of 30 KL 50 KL capacity
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages CHANDERI Block Phanda Distt BHOPAL based on Tubewells including installation of Electric submersible motor pump
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages BERKHEDI BAJYAFT Block Phanda Distt BHOPAL Survey Investigation and Necessary Construction works required for
SurveyInvestigation and Necessary Construction With OHT work required for Retrofitting of Existing piped water supply schemes of 02 villages namely 1 JUNAPANIBHAVARDI DEEPGAONKALA of Block KHIRKIYA Distt HARDA
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages BABACHIYA Block Berasia Distt BHOPAL based on Tubewells including construction of 40 KL capacity sumpwell cum
Survey, Investigation, and Necessary Construction work required for Retrofitting of Existing piped water supply schemes of 11 villages of Block HARDA Distt. HARDA
Survey Investigation and Necessary Construction With OHT work required for Retrofitting of Existing piped water supply schemes of 03 villages namely 1 KHAMLAY 2 MANDALA 3 BARANGA of Block KHIRKIYA Distt HARDA
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages KHAM KHEDA Block Phanda Distt BHOPAL based on Tubewells including installation of Electric
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages BARRICHIR KHEDA Block Berasia Distt BHOPAL based on Tubewells including installation of Electric submersible
Survey, Investigation, and Necessary Construction With OHT work required for Retrofitting of Existing piped water supply schemes of 06 villages of Block KHIRKIYA Distt. HARDA
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages KODIA Block Phanda Distt BHOPAL based on Tubewells including installation of Electric submersible motor pumps
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages RUNAH Block Berasia Distt BHOPAL based on Tubewells including construction of 30 KL capacity sumpwell
Survey, Investigation, and Necessary Construction work required for Retrofitting of Existing piped water supply schemes of 06 villages of Block TIMARNI Distt. HARDA
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages DHATURIYA Block Berasia Distt BHOPAL based on Tubewells including installation of Electric submersible motor
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages ARRAWATI Block Berasia Distt BHOPAL based on Tubewells including installation
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages TEELAKHEDI Block Phanda Distt BHOPAL based on Tubewells including installation of Electric submersible motor pu
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages GUJARTODI Block Berasia Distt BHOPAL based on Tubewells including installation of Electric submersible motor p
Survey, Investigation, and Necessary Construction With OHT work required for Retrofitting of Existing piped water supply schemes of 05 villages of Block KHIRKIYA Distt. HARDA
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages BARKHEDA SALAM Block Phanda Distt BHOPAL based on Tubewells including installation of Electric submersible moto
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages CHATAHEDI Block Berasia Distt BHOPAL based on Tubewells including construction of 30 KL 20 KL capacity sumpw
Survey Investigation and Necessary Construction works required for Retrofitting of Existing piped water supply schemes of Villages BAKANIYA Block Phanda Distt BHOPAL based on Tubewells including installation of Electric submersible motor pump