Loading…
Loading…
16,802 results • Best match
Repairing of Boundary Wall 145m Length for Pump House No - 1 of Talsa water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division P.H.E.Dte.
Sinking of Tube Well , Pump House , 200 cum OHR, Rising main pipe line, Interconnection pipe line, Laying distribution pipe line, Boundary wall, Installation of display Board, soil investigation under JJM with allied work for AMLAC
Sinking of 4 nos 200 mm dia River Bed Tube Wells in the River Ajoy at Bhaburia Head Works Site under Basudha PWSS W/S Scheme (JJM) under RCFA Division-I PHE Dte. (Part-B)
Laying distribution pipe line under JJM with allied work for JIRAPARA AND ITS ADJOINING MOUJAS PWSS in JAMBONI Block including supply of all labour and materials within Jhargram Sub-Division under Jhargram Division, PHE Dte.
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for AUGMENTATION OF HANTUPARA Water Supply Scheme TW No.- I, under JJM under NMD - II , PHE.Dte,APD.
Constructions of Pump House under JJM with allied work for JIRAPARA AND ITS ADJOINING MOUJAS PWSS in JAMBONI Block including supply of all labour and materials within Jhargram Sub-Division under Jhargram Division, PHE Dte.
Sinking of 4 nos 200 mm dia River bed tube wells in the river Ajoy at Bhaburia Head Work Site under Basudha Piped Water Supply Scheme (JJM) under RCFA Division-I PHE Dte. (Part-A)
Sinking of Tube Well, Interconnection pipe line, Laying distribution pipe line, under JJM with allied work for CHENCHUR GERYAAND ITS ADJOINING MOUJAS PWSS in JHARGRAM Block within Jhargram Sub-Division under Jhargram Division, PHE Dte.
Laying distribution pipe line under JJM with allied work for DALKATI AND ITS ADJOINING MOUJAS PWSS in JHARGRAM Block including supply of all labour and materials within Jhargram Sub-Division under Jhargram Division, PHE Dte.
Laying distribution pipe line under JJM with allied work for AMLACHATI AND ITS ADJOINING MOUJAS PWSS in JHARGRAM Block including supply of all labour and materials within Jhargram Sub-Division under Jhargram Division, PHE Dte.
Annual Operation Maintenance of DI/CI/UPVC/HDPE Distribution network at Madhaiaganj, Khatgoria, Borgoria, Kataberia, Kendula to Pratappur More, Rangamati, Mahespur, Kulbani System others allied works under modified RCFA Part-III PWSS (Non-JJM) un
PROVIDING FHTC LEFT OUT PORTION OF DANTRA PWSS
FHTC AT LEFT OUT PORTION OF HARADITYA PWSS
Augmentation of FHTC (Part-B) of Fazilnagar PWSS.
FHTC AT LEFT OUT PORTION OF BHANDARHATI PWSS
PROVIDING FHTC LEFT OUT PORTION OF BANDIPUR PWSS
FHTC AT LEFT OUT PORTION OF GOURHATI PWSS
Providing functional FHTC of Dharmadanga water supply scheme
Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Rejumination Tube Well and New Tube Well in connection to Accommodate FHTC at Pump House No.-I ,II , III , IV Zone-I Pump Ho
Balance work for Retrofitting to accommodate FHTC (750 nos) and laying of left-out portion uPVC pipeline due to uncovered area of this Zone at different nodal point under JJM in Surface water based water supply scheme for Zone-XI, Block-Kolaghat
Construction of Pump House (5.4 X 3.65) size, Rig Bore Big Dia Deep Tubewell by ODEX-165 method of drilling, boundary wall allied with laying of rising main, distribution system and providing FHTC under JJM for M M Terai PWSS within Naxalbari block
Retrofitting to accommodate FHTC(Balance work) (579 nos.) and laying of left-out portion uPVC pipeline due to uncovered area of this Zone and damaged pipe line at different nodal point under JJM in Surface water based water supply scheme for Zone-IV,
Laying distribution pipe line with Rising Main Switch Room along with PVC water storage OHR having capacity 20 Cum Development HW site FHTC and 2 yrs. OM under JJM for Hariatara PWSS Zone_III in KGP_I block under Midnapore Division PHE Dte. PART_II
Sinking of Tube Well Pipe line Rising Main Pump House Boundary Wall Soil invest. Construction of 100 CuM OHR and Accommodate FHTC inclu. 2 years O and M under JJM for Chandipur Z2 PWSS in Midnapore Sadar block under Midnapore Division PHE Dte.
Balance work for Retrofitting to accommodate FHTC (990 nos.) and laying of left-out portion UPVC pipeline due to uncovered area at different nodel point under JJM in Surface water based Water Supply Scheme for Zonr-XI, Block- Kolaghat in the District
Accommodate FHTC 70 including supplying, laying, fitting, fixing of 15mm dia. NB PVC Sch 8020mm dia HDPE(PE-100 PN-16 Pipe with all necessary specials, saddle piece etc. all complete including cost of all materials under JJM of Maliara Water Supply
Laying of Gap portion of D.I. Rising main pipe line (Zone-I Zone-III) under Improvement of Arsha its adjoining mouza W/S Scheme in connection with FHTC connection under JJM/ Jal Sapna Programme of Purulia Sadar Sub-Division under Purulia Division
Re-laying with UPVC Pipe line and retrofitting to accommodate FHTC (100 nos.) under JJM of Dona Zone-II Water Supply Scheme and its adjoining mouzas Water Supply Scheme at different Nodal Point in Moyna Block under Tamluk Sub-Division of Tamluk Divis
Providing FHTC in connection with JJM and Constr. of Office cum Guard room and Switch cum Chlorine Room,Boundary wall,Surface drain,Land development and other allied works at Head work site of Zone-I within Amdanga Block under Barasat Division, PHED
Jack Pushing of Clearwater Rising Main Pipeline at Chakdah Chowmataha Crossing along NH-12 and other allied works under JJM for Joykrishnapur ZII Chanduria Z XI Simurali Z X etc. Chakdah block for Chakdah WS Scheme provding FHTC under NAD-I PHED
Laying of 110 mm dia and 90 mm dia UPVC pipe, Providing FHTC, others Allied works in connection with JJM at Kathalbari village under Sultanganj pipe W/S scheme of Kaliachak-III Dev. Block under Malda Arsenic Area W/S Division PHE Dte.
Sinking of Tube Well Pipe line Rising Main Pump House Boundary Wall Soil invest. Construction of 100 CuM OHR and Accommodate FHTC inclu. 2 years O and M under JJM for Chandipur Z1 PWSS in Midnapore Sadar block under Midnapore Division PHE Dte.
Laying of HDPE Pipe Line from Susunia More to Murut Baha Eco-Park at Susunia mouza for retrofitting works for creation of FHTC (Functional House Hold Tap Connection in connection with Jal Jeevan Misson (JJM) and JAL SWAPNA of Hapania (Zone - D)
Construction of Boundary Wall at Head Work Site,C.C road from existing road to Head works Site and Land Development Work for HWS ,Providing FHTC in connection with JJM, Laying of rising main...Bakhrabad Piped W/S scheme at Kaliachak-II Block.
Retrofitting to accommodate FHTC (Balance work) (951 nos.) and laying of left-out portion uPVC pipeline due to uncovered area of this Zone and damaged pipe line at different nodal point under JJM in Surface water based water supply scheme for Zone-II
Sinking of Tube Well , Laying distribution system, Pump House at Head work site 2nd tube well site, Soil Test, OHR ( 250 Cum ) FHTC ( (1636 nos ) Boundary wall and Rising Main and 2 Years Maintenance under JJM with allied work for Jumki PWSS
Laying of additional pipelines and FHTC at north east part of Betna W/S Scheme under JJM at Betna W/S Scheme inconnection with Betna and Debogram watr supply scheme under Ranaghat - II block within Hanskhali Block under Nadia Arsenic Division-IPHED
Laying of additional pipelines and FHTC at south west part of Betna W/S Scheme under JJM at Betna W/S Scheme inconnection with Betna and Debogram watr supply scheme under Ranaghat - II block within Hanskhali Block under Nadia Arsenic Division-IPHE
Construction of 250 cum OHR, Rising main pipe line, Laying distribution pipe line, soil investigation under JJM with allied work for RADHANAGAR AND ItS ADJOINING MOUJAS PWSS in JHARGRAM Block including supply of
Extension of Distribution pipe line and FHTC work for Augmentation of Ground based Banspahari PWSS to Accommodate FHTC under Jhargram Division PHE Dte.
Emergent restoration of existing FHTC along with pipe line and other allied works in connection with retrofitting work at different places in connection with augm. of Malancha w/s scheme (Z-I), Minakhan block under Hasnasbad Sub-Division, P.H.E, Dte.
Standalone W/S System comprising of Installation of (IEP),Pump House and LDS and provision of FHTC including Sinking of 150 mm X 100 mm X135 m Rig Bored Tube Wellat different location under location Id Nayagram_4_7 under Jhargram Division.
Extension of pipe line from existing pipe line of Roopganj W/s Scheme to combat draught like situation in Kanksa block to provide FHTC at Arrah mouza (JL No-91) Bagdipara ,Ruidaspara ,Bouripara ,Adibasipara and arrah gram under DWSD,PHE Dte
Construction of Pump House, Boundary Wall, Tube well Boring by ODEX-165 Method of drilling at H/W site and 2nd site including laying distribution system and providing FHTC for KALCHINI TG ZONE-II PWSS Under Alipurduar Division PHE DTE
Construction of Pump House, Boundary Wall, Tube well Boring by ODEX-165 Method of drilling at 2nd and 3rd site including laying distribution system , Rising main and providing FHTC for KALCHINI TG ZONE-I PWSS Under Alipurduar Division PHE DTE.
Standalone W/S System comprising of Installation of (IEP),Pump House and LDS and provision of FHTC including Sinking of 150 mm X 100 mm X135 m Rig Bored Tube Wellat different location under location Id Gopiballavpur-I_4_1 under Jhargram Division.
Construction of Pump House, Boundary Wall, Tube well Boring by ODEX-165 Method of drilling at 3rd and 4th site including laying distribution system , Rising main and providing FHTC for KALCHINI TG ZONE-II PWSS Under Alipurduar Division PHE DTE.
Standalone W/S System comprising of Installation of (IEP),Pump House and LDS and provision of FHTC including Sinking of 150 mm X 100 mm X135 m Rig Bored Tube Wellat different location under location Id Nayagram_4_1 under Jhargram Division.
Laying of new UPVC/DI pipeline for filling of gap in the distribution system and laying of delivery line connection, providing FHTC, land development cons. Of surface drain, pathway and other allied work in connection with the Uttar Kamakhyaguri PWSS
Augmentation of ground water based Mandar W/S Scheme by providing LDS and FHTC work and Construction of R.C.C. OHR of capacity 150 cum and staging height 20.00 mtr. with in Ramnagar-II Dev. Block under Tamluk Division, PHE Dte.