Loading…
Loading…
16,802 results • Best match
Balance work for construction of Pump house /Chlorine room sinking of 150 X80X120 mtr deapth TW ,supplying laying of HDPE distribution pipe line and providing FHTC at Bonagram mouza of Augmentation of Banagram piped W/s Scheme under DWSD,PHE Dte.
Augmentation of ground water based Majna W/S Scheme by providing LDS and FHTC work and Construction of R.C.C. OHR of capacity 250 cum and staging height 20.00 mtr. with in Contai-I Dev. Block under Tamluk Division, PHE Dte.
Balance work of construction of Pump house /Chlorine room sinking of 150X80 X120 mm depath tube well supplying laying of HDPE distribution pipe in and providing FHTC at Dhobaru mouzas of Dhobaru piped W/S scheme under DWSD,PHE Dte
Balance work of construction of Pump house /Chlorine room sinking of 150X80 X120 mm depth tube well supplying laying of HDPE distribution pipe in and providing FHTC at Garadaha mouzas of Garadaha piped W/S scheme under DWSD,PHE Dte
Supplying and aligning of HDPE distribution pipe line and allied works including Functional House Holds Tap connectin (FHTC ) and connection providing to Jamdoba Mouza-40 and Telipara Mouza- JL-41 of Telipara block -Kanksa under TELIPARA piped W/s Sc
Ground Water Based Stand alone Piped Water Supply Schemes to accommodate FHTC in Chhota Brindabanpur,Harin Ganj,Jankipur,Kallokal,Keudi Villages Having Less than 20 Household at Binpur-I Block under Jhargram Division, PHE Dte. 3rd Call (1st Call eNI
Augmentation of ground water based Golaranij W/S by providing LDS and FHTC work and Construction of R.C.C. OHR of capacity 250 cum and staging height 20.00 mtr. including Sub Soil Investigation within Potashpur-I Dev. Block under Tamluk Division
Tube well Boring by ODEX-165 Method of drilling at TUBE WELL site including laying distribution system with new HDPE pipeline ,One nos pump house boundary wall, providing FHTC and others allied works for Bhutri Forest PWSS Under Alipurduar Divi
Augmentation of ground water based Kasbagola W/S Scheme by providing LDS and FHTC work and Construction of R.C.C. OHR of capacity 300 cum and staging height 20.00 mtr. with in Egra-I Dev. Block under Tamluk Division, PHE Dte.
Tube well Boring by ODEX-165 method of drilling at Head work site, Construction of 1 no. Pump house and Boundary wall at headwork site, Rising Main and Distribution line with FHTC (Part-1) for BANDAPANI TG AREA PWSS (ZONE-I).
Construction of 2nos Tw boring by ODEX-165 method of drilling including distribution system with new UPVC pipeline, 2 nos Pump house, Boundary wall, pathway, providing FHTC and other allied works for 28 and 29 mile busty PWSS under Alipurduar Divisio
Augmentation of Khairullachak W/S scheme by providing LDS, FHTC,Tube Well and Construction of 150 Cum OHR and staging height 20.00 mtr. with allied work in Midnapore Sadar Block within Midnapore Sadar Sub-division under Midnapore Division, PHE Dte
Standalone W/S System comprising of Installation of (IEP),Pump House and LDS and provision of FHTC including Sinking of 150 mm X 100 mm X135 m Rig Bored Tube Wellat different location under location Id Nayagram_4_3 under Jhargram Division.
Extension Distribution pipeline for smooth functioning of Ghokurpal water (Out of 45 nos Mini PWSS) at Nayagram Block and providing due FHTC with extension pipeline of Banisole scheme (Out of 45 nos Mini PWSS) at Nayagram Block Within Jhargram Divisi
Cons. of tube wells at 2nd site by Reverse rotary method of drilling, cons. of pump house and boundary wall at 2nd site, rising main, distribution line(C) and providing FHTC as per Departmental Design and drawing for Khagenhat PWSS
Standalone W/S System comprising of Installation of (IEP),Pump House and LDS and provision of FHTC including Sinking of 150 mm X 100 mm X135 m Rig Bored Tube Wellat different location under location Id Nayagram_4_5 under Jhargram Division.
Standalone W/S System comprising of Installation of (IEP),Pump House and LDS and provision of FHTC including Sinking of 150 mm X 100 mm X135 m Rig Bored Tube Wellat different location under location Id Gopiballavpur-I_4_2 under Jhargram Division.
Standalone W/S System comprising of Installation of (IEP),Pump House and LDS and provision of FHTC including Sinking of 150 mm X 100 mm X135 m Rig Bored Tube Wellat different location under location Id Nayagram_4_6 under Jhargram Division.
Balance work of construction of Pump house /Chlorine room sinking of 150X80 X120 mm depth tube well supplying laying of HDPE distribution pipe in and providing FHTC at Garkilla -Kherobari (JL-27),Gourangapur(JL-28) mouzas of Garkilla-Kherobari pipe
Standalone W/S System comprising of Installation of (IEP),Pump House and LDS and provision of FHTC including Sinking of 150 mm X 100 mm X135 m Rig Bored Tube Wellat different location under location Id Nayagram_4_2 under Jhargram Division.
Constructions of pump house and Tube well Boring by ODEX-165 Method of drilling at HW site and 2nd site, Laying of distribution system with HDPE/DI pipeline, providing FHTC and others allied works for Dhantali PWSS Under Alipurduar Division PHE
Construction of pump house/Chlorine room,sinking tube well of 150 X 80 X 120 mtr depth and supplying laying of HDPE distributin pipe line and providing FHTC at DHOBARU mouza of Dhobaru piped W/s Scheme under DWSD, PHE Dte
Sinking of 2(Two) Nos TW,FHTC,laying Rising main andlaying distribution system (LDS) ,construction of boundary wall ,Pump House and restoration of road andother allied works for Augmentation of ground water based W/s Scheme for Basudha under DWSD,Blo
Balance work for supplying laying and aliging of HDPE distribution pipe line and allied works including FHTC and connection providing to Jamdoba mouza JL No-40 and Telipara Mouza JL-41 of Telipara W/s Scheme udner DWSD ,PHE Dte
Construction of Pump House, Boundary Wall, Tube well Boring by ODEX-165 Method of drilling at 2nd and 3rd site including laying distribution system , Rising main and providing FHTC for MADARIHAT TEA GARDEN AREA PWSS Under Alipurduar Division PHE DTE
Supplying, laying, fitting, fixing, jointing etc. of different dia HDPE pipe line for DS and Laying of RM from existing HW Site to OHR Site and Providing FHTC including supplying, laying, fitting, fixing pipe with all complete for Thakdari WSS, BARD
Standalone W/S System comprising of Installation of (IEP),Pump House and LDS and provision of FHTC including Sinking of 150 mm X 100 mm X135 m Rig Bored Tube Wellat different location under location Id Nayagram_4_4 under Jhargram Division.
Extension of pipe line from exisitng pipe line of Kanksa (Zone-II) (Ph-II) W/S scheme at Panagarh Bazar and east canal par in Knksa block to providing FHTC at Kanksa mouza(JL-89) Kanksa under DWSD PHE Dte.
Additional work of Soil investigation and construction of CWR/Pump House etc, Land development of H/W Site,drain and internal Path Way, Concrete Road Restoration,FHTC with Platform with necessary allied Works of Sub Surface Based PURANGAN and Sub Sur
Augmentation of ground water based Kalindi W/S Scheme by providing LDS and FHTC work and Construction of R.C.C. OHR of capacity 450 cum and staging height 20.00 mtr. with in Ramnagar-II Dev. Block under Tamluk Division, PHE Dte.
Re-Laying of Damaged Pipe Lines during Construction of PMGSY Roads,and Left out pipe line including balance FHTC Within Zone-IV Of Nayagram (Part) Sub-Surface Based Piped Water Supply Scheme Within Nayagram Block Under Jhargram Division, PHE Dte.
Tube well Boring by ODEX-165 method of drilling at 2nd TW site, Construction of Pump house and Boundary wall at 2nd site, Laying of Rising and delivery line connection, Providing FHTC and other allied works for KOHINUR TG PWSS
Balance work for supplying laying and aligning of HDPE distribution pipe line and allied works including FHTC and connection providing to JAMDOBA mouzas JL-40 and Paschim Telipara mouzas JL-41 of Augmentation of Telipara W/s Scheme under DWSD under
Additional work for laying of extension or laying of paralled pipe line construction of boundary wall providng leftout FHTC road restoration work inter connection of tube well with allied work for Augmentation of Galsi PWSS ,Galsi-Block Dist- Purba b
Supply and delivery of 100 A 4 Pole onload Change over (in connection with Aug. work related to FHTC) at Pump House No. I, II and III (Rep.) (Zone-I) under Khulna-Bhanderkhali W/S Scheme District of 24 Pgs. (N).
Field Level data validation of FHTC executed by various Agencies on the basis of pictorial data with the objective of controlling multiple entry, ....Pipe Water Supply Scheme 7 nos PWSS of 130 PWSS within Gopiballavpur II Block in the District ..
Balance work for supplying laying and aligning of HDPe distribution pipe line and allied works including FHTC and connection providing to Raghunathpur mouzas JL-39 and Paschim Gangarampur mouzas JL-92 of Augmentation of Telipara W/s Scheme under DWSD
Estimate for Restoration of UPVC pipe line and FHTC due to damaged of Pipeline and House Connection by Gram Panchyat for Construction of Culvert at Chatra Bridge and Construction of Drain at Shippur and Bena Mouza under Chandipur water Supply Scheme
Extensioin of pipe line from existing pipe line of Kanksa Zone-II PH-II W/s Scheme to combat draught like situation in Kanksa block to providing FHTC at Debipur mouza JL-87 ,Sharmapara ,Singh para under DWSD,PHE Dte.
S/D and installation of MCC Panel and valve set for Augmentation Tubewell at PH No-II Zone-I in connection to accomodate FHTC under Gobindapur ground water based water supply scheme under Block_Shantipur Dist- Nadia under under EMD, PHE Dte.
S/D and installation of MCC Panel and valve set for Augmentation Tubewell at PH No-I Zone-I in connection to accomodate FHTC under Gobindapur ground water based water supply scheme under Block_Shantipur Dist- Nadia under under EMD, PHE Dte.
Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC FHTC all related structure of 6nos Mini pipe water supply scheme out of269 nos Mini PWSS of GopiballavpurII Block within JhargramSub Division underJhargram Division PHE Dte For 12 Mo.
Maintenance of Rising Main, Delivery Main Pipe Line (CI/DI/HDPE/uPVC),FHTC and all related structure of 09(Nine) nos.Standalone Piped Water Supply schemes out of 269 nosStandalone PWSS at Jamboni Block within Jhargram RWS Sub-Division under Jhargram
Maintenance of Rising Main, Delivery Main Pipe Line (CI/DI/HDPE/uPVC),FHTC and all related structure of 09(Nine) nos.Standalone Piped Water Supply schemes out of 269 nosStandalone PWSS at Jamboni Block within Jhargram RWS Sub-Division under Jhargram
Emergency work for interconnection of existing line with main line, FHTC repairing valve installation in branch line ,construction of street stand post and other allied work at Ukhra pathak para of Ukhra water supply scheme under RCFA Division-I PHE
Construction of Pump House, 150 cum OHR, Rising main pipe line, Interconnection pipe line, Laying distribution pipe line, Installation of display Board, soil investigation , under JJM with allied work for MURABANI AND ITS ADJOINING MOUJAS PWSS
Supply, delivery, installation, commissioning and trial run of electro-mechanical components along with Cu wound line voltage corrector for CHANDAMARI water supply scheme, TW no III (OHR SITE) under JJM under NMD-II, PHE Dte. APD.
Construction of the Boundary wall in Pump House No. 3 of Bergum Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte.
Supply, delivery, installation, commissioning and trial run of electro-mechanical components along with Cu wound line voltage corrector for KHAGENHAT water supply scheme, TW no I AND II under JJM under NMD-II, PHE Dte. APD.
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for GARBHADANGA Water Supply Scheme TW No.- I, II AND III under JJM under NMD - II , PHE.Dte,APD.