Loading…
Loading…
4,611 results • Best match
Engaging of JCB and Tractor with trolley for special sanitation programme in Mahabubnagar Municipal Corporation
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 603.537 LBCM OF OB (543.531 LBCM OF OB, 13.057 LBCM OF COAL, 46.949 LBCM OF TOP SOIL) WITH HIRED CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 2000 DOZER HOURS, 2000 SHOVEL HOURS & 130000 RMT OF DRILLING AT KTK OC-III PROJECT (Phase-I), BHPL AREA DURING A PERIOD OF 36 MONTHS.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 1416.720 LBCM OF IN-SITU OB (1245.914 LBCM OF IN-SITU OB WITH HIRED HEMM IN COMBINATION WITH CONVENTIONAL EQUIPMENT & 170.806 LBCM OF IN-SITU OB WITH CONVENTIONAL ... 1000 DOZER HOURS ...
Earmarked for "SC/ST/Waddera/Sagara Labour Cooperative societies & individual" - KTPS V & VI Stage - O&M - III - Civil - Engaging the tractor & dozer along with driver for collecting and clearing of debris, garbage, vegetation and leveling of areas at TSGENCO Housing Colony, New Bombay colony, KSP Camp Colony at Paloncha for the period from April 2024 to March 2025
Earmarked for "SC/ST/Waddera/Sagara Labour Cooperative societies & individual" - KTPS V & VI Stage - O&M - III - Civil - Engaging the tractor & dozer along with driver for collecting and clearing of debris, garbage, vegetation and leveling of areas at TSGENCO Housing Colony, New Bombay colony, KSP Camp Colony at Paloncha for the period from April 2022 to March 2023
Hiring of Hydraulic Excavators and Engaging of Labours for Desiltation of Nalas and Storm water Drains in Adilabad Municipality, Est. Cost Rs.10.00 Lakhs, MGF or 15th FC Untied Grant
Tyre Changer Machine for Light Vehs, Mobile Workshop Floor Crane, Two Wheeler Repair Lift
Supply, Fabrication and Testing of Safety platform for EOT Crane at BDL-KBU (Q3)
Design, Fabrication, Supply, Installation & Commissioning of Double Girder EOT Crane 5 T with spares
Engaging of Vehicles and Machinery of Mini Tipper(without labour), Tipper (10T), Tipper (25T), Skid Steer Loader(Bobcat) and Back Hoe Loader(JCB) on hire basis for removal of Garbage/Animal Waste in view of Bakrid Festival-2021 under Chandryangutta Circle No:8, CRZ, GHMC. (Bandlaguda Temporary Transfer Station under Circle No:8)
Engaging of Vehicles and Machinery of Mini Tipper(without labour), Tipper (10T), Tipper (25T), Skid Steer Loader(Bobcat) and Back Hoe Loader(JCB) on hire basis for removal of Garbage/Animal Waste in view of Bakrid Festival-2021 under Rajendranagar Circle No:11, CRZ, GHMC. (Kattedan Transfer Station under Circle No:11)
Desilting of canal silt from Jagtial main road to gouds colony with engaging of labours, JCB and Tractor for lifting and dumping with lead up to 5 Km beyond the site during the sammakka Jatara Festival at Rekurty in Div No. 18 of MCK estimate cost fo Rs. 2.20 lakhs under MGF
Engaging of Vehicles and Machinery of Mini Tipper(without labour), Tipper (10T), Tipper (25T), Skid Steer Loader(Bobcat) and Back Hoe Loader(JCB) on hire basis for removal of Garbage/Animal Waste in view of Bakrid Festival-2021 under Falaknuma Circle No:10, CRZ, GHMC. (Miralam Transfer Station under Circle No:10)
Engaging of Tractor with Trolly, Labour and JCB for Monsoon Emergency Team for the year 2020-21 from 1st,June 2020 to 31st, october,2020 in W.No.17, Champapet in L.B.Nagar Circle-4, GHMC. (Reserved for Individual SC Contractors, Proprietaryship/ Partnerships.) as per G.O. MS No.59, I&CAD(Reforms) dept, dt:21.05.2018
Engaging of Vehicles such as JCB and Tractor with trailers for spreading of gravel and levelling for the development of tree parks in the dumping yard in Bodhan town Under Swachh Bharath Mission Funds ("Invited Under earmarked works - The labour cooperative contract societies of SCs/STs/Wadera/ Sagara are only eligible to participate")
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 1980 BP SRIRAMPUR in package III of Kothagudem Division
Clear felling & Chipping and heaping in the entire area , Uprootal of stumps, Tilling of Soil over entire area to a depth of 0.45 Mtrs using heavy Machinery i.e. excavators fitted with 0.90 Cubic Meters and above capacity bucket , collection and removal of all stacking , filling of resultant pits with soil and levelling of the site in the Plantation area in 2023 EP Narayanpur ' K ' (Old 1981 EP) and 2023 EP Narayanpur ' K '(Sec I 2004 BP) at Warangal division (Package No- II)
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area of 2025 EP Mulakalapally (2003 EP) Package.no.IX of Paloncha Division
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 2008 EP Katkur in package XII of Sathupalli Division
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 1979 BP SRIRAMPUR in package I of Kothagudem Division
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted 200 LC with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 1979 BP SRIRAMPUR in package V of Kothagudem Division
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area of 2025 EP Lingaredypally (2005 EP) Package.no.X of Paloncha Division
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 2007 EP SRIRAMPUR & 2007 EP NAGUPALLY in package III of Kothagudem Division
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 1980 BP Lankalapalli in package XIII of Sathupalli Division
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area of 2024 EP Narayanpur (K) (2002 BP) of Mulugu Division
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 1979 BP NAGUPALLY in package IV of Kothagudem Division
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. 200LC excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 2024 EP Katkur Package No IX in Sathupalli Division.
Clear felling & Chipping and Heaping in the entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2023 EP Kamalapur(2006) at WARANGAL DIVISION (PACKAGE.NO -I)
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 2007 EP GARIMELLAPADU & 2007 EP MARRIGUDEM at Package I of Kothagudem division.
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. 200 LC excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 2024 BP Guntimadugu package no X in Sathupalli Division.
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area of 2024 EP KOMATPALLY (2008) of Mulugu Division in Package. No. II
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 1984 CP Laxmidevipalli at Kothagudem Division (Package no.1).
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2007 EP Nagupally at Kothagudem Division (Package no.II)
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 1979 BP Gandugulapalli in package XV of Sathupalli Division
Removing of silt and carting with tractor , labour and JCB at various wards in Suryapet Municipality
Supply and spreading of stone dust at various places in Rajendranagar Circle, relocating and replacing of cement blocks at Pillar No. 143 by engaging of Crane at various places in Attapur Division, Ward-61 in Rajendranagar Circle-11, GHMC (Ganesh Festival 2024)e-11, GHMC (Ganesh Festival 2024) (Rs.1.40 Lakhs)
Providing Cantilevers/Straight poles with civil Foundations, Signal Aspect Red Lamps, Signal Aspect Yellow Lamps, Signal Aspect Green Arrows (2 Types) Controller, CDTS (Count down timers) Safety Box Batteries (100 Ah), Charges Controller cum ... and Crane rent ...
Supply, Erection, installation and commissioning of 5 Ton EOT crane at BEML Limited, Service Center
5 TON EOT Non Drive Wheel Shaft, 5 TON EOT DRIVE WHEEL SHAFT, CRANE WHEEL
Design, Manufacturing, Supply, I&C of Electrically operated Under Slung Crane detail as per Annex
Annual Desilting of culverts present at Green park colony and Thapovan colony by Engaging of Pontoon Mounted Excavator along with Excavator (Mechanical means) for the year 2026 in Ward No. 37 - Lingojiguda of L.B.Nagar Circle-13, GHMC (AS.DATE:21-01-2026, BUDGET YEAR 2025-26) (Re call)
Laying of CC road from Indane oil petrol bunk to Vijay plywood and from DEZYD IQ Studio to MGB JCB opposite Miyapur metro station beside culvery temple road in Madhapur Ward no 107, Chandanagar Circle-21, Serilingampally Zone, GHMC (Reserved for SC contractors, proprietor firms, partnership firms and pvt ltd companies promoted by the SC's)
Engaging of vehicles such as JCB and tractor with trailers lifting of silt and garbage and trasnportation of garbage to the dumpste as part of pattana Pragathi Programme in Bodhan town Under Pattana Pragathi Funds ("Invited Under earmarked works - The labour cooperative contract societies of SCs/STs/Wadera/ Sagara are only eligible to participate")
Earmarked for "SC/ST/Waddera/Sagara Labour Cooperative societies and individual" - KTPS V VI Stages- O M-III-Civil-Engaging the tractor and Dozer (D50) along with driver for collecting and clearing of debris, garbage, vegetation and leveling of areas at TGGENCO Housing Colony, New Bombay colony, KSP Camp Colony at Paloncha for the period from April 2025 to March 2026.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 543.853 LBCM OF OB (510.380 LBCM OF OB, 9.561 LBCM of Coal, 23.312 LBCM OF BLACK COTTON SOIL & 0.60 LBCM FOR DIVERSION OF NALLAH) WITH HIRED CONVENTIONAL EQUIPMENT ... 4000 DOZER HOURS, ...
Annual Maintenance Estimate for Supply of Lubricants and Application of Cardium Compound to Radial Crest Gates, R.B.C Head Regulators, Stop Log Blocks and Gantry Crane and Supply of Diesel and Maintenance of Generator of Sri Kumuram Bheem Project near Ada(V), Asifabad(M), Kumuram Bheem Asifabad(Dist.) for the year 2025-26
Annual Maintenance Estimate for Supply of Lubricants and Application of Cardium Compound to Radial Crest Gates, R.B.C Head Regulators, Stop Log Blocks and Gantry Crane and Supply of Diesel And Maintenance of Generator of Sri Kumuram Bheem Project near Ada(V), Asifabad(M), Kumuram Bheem Asifabad District for the year 2024-25
Dismantling of Existing System by removing the existing cable, power sockets & Installation Tetsting, Commissioning of 185 Sqmm 3.5 core 1100V grade armoured alluminium cable,200 KVA Voltage Stabiliser, Junction boxes and 25 Nos. of Power Sockets for ... Gantry Crane of ...
Arrangement of Heavy Crane Drivers and Swimmers on occasion of Vinayaka Nimajjanam under Municipal General Funds
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area of 2025 EP Mulakalapally (2004 EP) and 2025 EP Wodduramaram (2002 EP) Package.no.VII of Paloncha Division