Loading…
Loading…
4,611 results • Best match
Supply, delivery and fixing of MS chamber covers for inline booster in place of completely damaged cover by engaging of crane truck, fabrication team etc., at various locations in Karwan Constituency under Electrical and Mechanical Section, EAM Cell-VI of O and M Division No.III
Estimate for Engage of Hydraulic Crane for the lifting of Ganesh Idols at various wards and for immersion of Vinayaka Idols at Bhongir Pedda Cheruvu and Raigiri Cheruvu and Providing of Barricading at Immersion sites on Occasion of Vinayaka Chavathi Festival in Bhongir Municipality
Supply and spreading of chips and dust at various places , relocating and replacing of cement blocks at pillar no 143 by engaging of crane in ward no 61 in attapur div in rjnr c-11 GHMC ( Reserved for waddera /Sagara Communtties) (Rs. 1.50 Lakhs)
SUPPY & DELIVERY OF hydraulic 3DX EXCAVATOR LOADER FITTED WITH 1.10 CUM LOADER BUCKET, 0.26 CUMEXCAVATOR BUCKET POWERED BY JCB448 WATER COOLED 4 CYLINDER DIESEL ENGINE OF 76HP @ 2200 RPM, &FITTED WITH TORQUE CONVERTER,SHUTTLE REVERSER SYNCHROMESH GEARBOX, WITH REAR INDUSTRIAL TYRES IN GAJWEL-PRAGNAPUR MUNICIPALITY SIDDIPET DIST UNDER DISTRICT MINERAL FOUNDATION FUNDS
Removal of Deep Silt by means of Hydraulic Excavator on both sides (Up stream & Down stream)of culvert at Green park colony for expanding the catchment area of backwater in saroornagar lake to avoid flooding during the upcoming Monsoon season in Ward No. 18, Lingojiguda of L.B.Nagar Circle-4, GHMC. (FY 2020-21).
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING and LEVELLING, ETC., OF 124.26 LBCM OF IN-SITU OB (WHICH INCLUDES 8.20 LBCM OF COAL), WITH CONVENTIONAL EQUIPMENT, AND ADDITIONAL WORKS VIZ., 1000 SHOVEL HOURS, 500 DOZER HOURS and 30,000 RMT OF DRILLING AT MANUGURU OPENCAST PROJECT, MANUGURU AREA DURING A PERIOD OF 12 MONTHS.
SUPPLY, ERECTION AND COMMISSIONING OF CONDUCTOR BUS-BAR SYSTEM FOR EOT CRANE
Repair of Diesel engine for 75MT crane at Main Plant of HWPM
250 MT BASIC CAPACITY TYRE MOUNTED TELESCOPIC BOOM CRANE WITH FIX JIB
Engaging JCB and Tippers for Shifting of Deviders on Chilakanagar main road,Construction of basement wall for public toilet and Excavation of Excess debris beside the Existing CC Road from Veerareddy nagar chowrasta to mallanna temple of Boduppal Municipality under Municipal General Funds for the Year of 2018-19
Engaging of Mini Tipper(without labour), Tipper (10T), Tipper (25T), Skid Steer Loader(Bobcat) and Back Hoe Loader(JCB) on hire basis for removal of Garbage/Animal Waste in view of Bakrid Festival 2020 under Chandryangutta Circle No:8, CRZ, GHMC. (Bandlaguda Temporary Transfer Station under Circle No:8)
Engaging of JCB and Labour for cleaning of light jungle formed alongoverflow channels, back side of de-sledging room of Phase-IV Water Treatment Plant and between of Phase-III and IV Water Treatment Plants at Peddapur under Singur Section, Sub-Division No.II, Peddapur,O&M Division No.VIII, Patancheru
Engaging of Vehicles such as JCB, Blade Tractor, Tractor with trailers, etc., for clearing bushes, cleaning open spaces, leveling the surface, desilting, removing debris, lifting of silt and garbage and transpotation of garbage to the dumpstie as part of Pattana pragathi programme in Bodhan town under Pattana Pragathi Funds
Repairs to EOT Cranes at all three stages of Alisagar LIFT Irrigatation scheme Nizamabad 1st call
Providing Cantilevers/Straight poles with civil Foundations, Signal Aspect Red Lamps, Signal Aspect Yellow Lamps, Signal Aspect Green Arrows (2 Types) Controller, CDTS (Count down timers) Safety Box Batteries (100 Ah), Charges Controller cum ... and Crane rent ...
Providing and arrangement of Flood LED Lights, Generator, Sound system with Truss, Sound systems,Towers, Crane, Barricading , artificial bathukamma, LED Kamans ( Gao Structures), pooja material and Tent house material etc.,on hire basis on Occasion of Bathukamma Festival in Sangareddy town under Municipal General Fund 2023-24
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING, ETC., OF 320.873 LBCM OF IN-SITU HARD OB (WHICH INCLUDES 1.620 LBCM OF COAL) WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS, VIZ., 10,000 RMT OF DRILLING, 1000 SHOVEL ... 1000 DOZER HOURS ...
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 171.69 LBCM OF OB (169.59 LBCM OF OB AND 2.1 LBCM OF COAL) WITH HIRED CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ., 1000 DOZER HOURS, 1000 SHOVEL HOURS & 10000 RMT OF DRILLING AT RG OC-I EXPANSION PROJECT, RG-III AREA DURING A PERIOD OF 24 MONTHS.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING, ETC., OF 885.803 LBCM OF OB WHICH INCLUDES 11.262 LBCM COAL FROM SPLINTER COAL SEAMS & COAL BANDS WITH CONVENTIONAL EQUIPMENT AND ALSO ADDITIONAL WORKS, VIZ., 5000 SHOVEL ... 5000 DOZER HOURS ...
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area of 2024 BP Gandugulapalli package.no.VIII of Sathupally Division
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 2023 Buggapadu A & 2023 Aswaraopeta CMA Sathupally Division Pk.no.I
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas, Medak Division 2023 Gollur (1998 EP), Package no.III.
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2023 EP Satyampeta at Paloncha Division
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2025 Nagaram Bit I (Old 1999 EP)
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas 2024 BP Vedanthapur Package no: XI in Sathupalli Division.
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2025 EP MC Pally
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2023 LGM Pet (Package - 3)
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas at 2023 Muduchintalapally in RR Division (package No.1)
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area in 2023 EP Subbanapally Paloncha Division Pk.no.I
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas, in 2023 EP Chowtkur, Package no.I, MEDAK DIVISION.
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas, in 2023 Chowtkur, Package no.II, MEDAK DIVISION
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2023 EP Wodduramaram at Paloncha Division
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area of 2024 EP Mulakalapally Package.no.VI of Paloncha Division
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2025 Nagaram Bit II (Old 2000 EP)
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2025 EP Gajwel Bit II
Clear Felling Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas in 2025 EP Gajwel Bit I
Design, Fabrication, Erection AND Commissioning of Flame proof Electric Goliath Crane with accessories,
Desilting of canal silt from Sheakha bee colony to Jagtial road with engaging of labours, JCB and Tractor for lifting and dumping with lead up to 5 Km beyond the site during the sammakka jatara festival at Rekurty in Div NO. 18 of MCK estimate costof Rs.4.75 Lakhs under MGF
Engaging of JCB, Dewatering Pump for Monsoon Emergency Team for the year 2021-22 from 1st,June 2021 to 31st, october,2021 in W.No.15, Vanasthalipuram in L.B.Nagar Circle-4, GHMC. (Reserved for Individual / Sagara / Waddera LCCS Contractors, Proprietaryship/ Partnerships.) G.O. MS No.59, I&CAD(Reforms) dept, dt:21.05.2018
Engaging of JCB, Dewatering Pump for Monsoon Emergency Team for the year 2021-22 from 1st,June 2021 to 31st, october,2021 in W.No.16, Hasthinapuram in L.B.Nagar Circle-4, GHMC. (Reserved for Individual/ ST LCCS Contractors, Proprietaryship/ Partnerships.) As per G.O. MS No.59, I&CAD(Reforms) dept, dt:21.05.2018
LOWER FRONT WEAR PAD PART NO 6671000875, SIDE WEAR PAD PART NO 6671000258, WEAR PAD PART NO 6671000262, WEAR PAD PART NO 6671000263, WEAR PAD PART NO 6671000265, WEAR PAD PART NO W7671000008, WEAR PAD PART NO 6671000236, WEAR PAD PART NO 6671000259, VALVE SEAL KIT PART NO Z9372011190, SWIVEL ADAPTORS PART NO 7364001615, CVMC ASSY PART NO Z2162400025, SLAVE CYL PART NO Z7372000106 BY W7372000344, TRANSMISSION OUTPUT SHAFT SEAL PART NO 9904103618, LUB OIL FILTER ELEMENT PART NO 3937743, ELEMENT F F PART NO 3903640, FUEL FILTER PART NO 4093731, ELEMENT OUTER PART NO 3815928, ELEMENT INNER PART NO 3815929, FUEL FILTER PART NO 7437000873, ELEMENT PART NO 9437100754, STRAINER PART NO X7437000006, HYD HOSE KIT COMPLETE PART NO RT740HSK, PRESSURE SWITCH PART NO 6872100000, OIL PRESSURE GUAGE 24V PART NO Z7486000092, PRESSURE SENDER BY SWITCH OIL PART NO Z7486000103, FLUID LEVEL AND TEMP GAUGE PART NO X7486000024, LEVEL INDICATOR PART NO W7486000102, SENSOR CABLE 5 MTR Z9352000114
Engaging of Crane, Tractor, Labour for removing the Ganesh Idols and Durga Matha Idols immersion and leveling of ground and at Cherlapally Cheruvu, arrangements of stage and pandauls, chairs and providing temporary toilets at kapra lake and cherlapally lake in view of Ganesh festival of Kapra Circle, GHMC
Repair and Replacement of worn out parts like gears, wheels, rope, wooden blocks etc complete for HOT Crane along with temporary flood gate of Osmansagar flood gates including overhauling, servicing and put it into working condition at Osmansagar dam under Osmansagar Section, Sub-division No.II, Transmission Division No.I, Himayathsagar.
Providing Cantilevers/Straight poles with civil Foundations, Signal Aspect Red Lamps, Signal Aspect Yellow Lamps, Signal Aspect Green Arrows (2 Types) Controller, CDTS (Count down timers) Safety Box Batteries (100 Ah), Charges Controller cum ... and Crane rent ...
Providing Cantilevers/Straight poles with civil Foundations, Signal Aspect Red Lamps, Signal Aspect Yellow Lamps, Signal Aspect Green Arrows (2 Types) Controller, CDTS (Count down timers) Safety Box Batteries (100 Ah), Charges Controller cum ... and Crane rent ...
HAML-Hyderabad Metro Rail Project Phase-II-Corridor-VI-Road Widening from Darulshifa to Chandrayangutta - Dismantling of affected properties bearing sketch No.124, 127, 128, 156, 163, 165, 167, 174,179, 182, 197, 212, 235, 241, 254 on LHS under road ... reach excavator / ...
Hiring shovel 0.85 cum, 110HP Hydraulic Excavator capacity on Hour basis without Fuel (HSD oil), including hire and crew charges round the clock as and when required for 3 months (from the actual date of commencement/utilization to till the completion of quantity) for Clearance of RC Hopper Grid jams pertaining to CHP MM1 Sub Division-1, KTPP
Hiring of 0.5 Cu.M Capacity long boom Hydraulic Excavator with 12 Mtrs depth bucket reach for cleaning of GL Bunkers and other miscellaneous works as per necessity at CHP-SRP-OCP, SRP Area with 24 hours availability @minimum 250 hours per month for a period of TWO YEARS as per the Scope of work, Terms and Conditions of NIT
Hiring of 0.5 Cu.M Capacity long boom Hydraulic Excavator with 12 Mtrs depth bucket reach for cleaning of GL Bunkers and other miscellaneous works as per necessity at CHP-SRP-OCP, SRP Area with 24 hours availability @minimum 100 hours per month for a period of TWO YEARS as per the Scope of work, Terms and Conditions of NIT
Hiring shovel 0.85 cum, 110HP Hydraulic Excavator capacity on Hour basis without Fuel (HSD oil), including hire and crew charges round the clock as and when required for 3 months (from the actual date of commencement/utilization to till the completion of quantity) for Clearance of RC Hopper Grid jams pertaining to CHP MM1 Sub Division-1 KTPP