Loading…
Loading…
4,611 results • Best match
BTPS - CHP - Engaging of 02No excavator machines of engine capacity not less than 48HP for clearing of grid jams at wagon tippler-1&2 and on Track Hopper-1A&1B grids for facilitating further unloading of coal tippers and also for removal of spilled over coal while unloading of coal trucks, pouring back the same into the respective grids and also for clearing the chain conveyor jams at contingency arrangement-1&2 on round the clock basis for arranging uninterrupted coal feeding to the units-1,2,3&4 of BTPS for the period of 45 days from 23.07.2024 or from the actual date of commencement of work.
Formation of temporary bund with sand bags, improvement/strengthening of approach road at Shamirpet Lake near new crane locations in view of Ganesh immersion 2026 in Shameerpet ward-300 Keesara Circle - 01,Malkajgiri Zone, MMC(item no.1)
Engaging of JCB and Supply and spreading of stone dust in various places in Manikonda ward no 127 and Neknampur ward no 128 on the occasion of Bonalu festival for the year 2026 in Narsingi circle-45, Serilingampally zone, CMC (ITEM NO.05)
Engaging of JCB vehicle and labour for desilting the Storm Water Drain from Opp Ranga Theatre to Judio in Kodad Municipality for the year 2026-27 under Municipal General Fund/State Finance Commission(Reserved for ST Societies, Include the Individual ST contractors, only)
Octagonal Pole 10 mtr, Round Arm Bracket, M20 x 900 J Bold, Base Plate, 10 x 4C AL AR Cable, 16A MCB, Installation of Poles with Crane, Digging Pits, Foundation, Cable Laying, LED Light 200 Watt, 2 Core Copper Wire
Carefully and Safely removing / shifting / placing the huge canon of 6 meters length and 0.6 meters outer diameter from the top of Majnu Bastion to ground level for safe guarding the cannon from falling down using suitable 50T Capacity Crane
Procurement and supply of hard granite stone blocks, Three line fine dressing and chiseling, Re-mending the old mended beams, Hiring of 16T capacity Hydraulic crane and Resetting of the new and mended roof beams, etc. all complete as per RFP
Construction of capping/coping stones of Prakara wall, Cost and supply of good quality river sand, Hiring charges of concrete miller/mixer, Hiring charges of 16T crane and Hiring charges for tractor etc. all complete as per the directions of Official
Operation and Maintenance of 2 Nos of Chute Sluice Gates Emergency Gates and 125T 25T and 75T 25T Gantry Crane of Gates Section III of Irrigation Sub Division No.01 of Nagarjunasagar Dam for the year 2025-26 (4th call)
One set of two items for 10 Tonne road mobile crane 1. Front Tyre, Tube and flap (Heavy Duty) set to size 11.00-20 (Type: Nylon Bias, Tube Type, Ply Rating: 16 PR, Rim size:8.00-20, IS Specification: IS 15636:2012-Pneumatic Tyres for commercial Vehicles)-Qty- 4Nos. 2. Rear Tyre, Tube and flap (Heavy Duty) set to size 13.00-24 (Type: Nylon Bias, Tube Type, Ply Rating: 20 PR, Rim size:8.00-24, IS Specification: IS 15636:2012-Pneumatic Tyres for commercial Vehicles)-Qty- 2Nos. Make: CEAT/MRF/APOLLO/JK/GOODYEAR or its equivalent.
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
Supplying of 70MT Telescopic crane with 42m boom, skilled labour, tools n plant with necessary equipment for the Dismantling rdemolition of damaged vertical window RCC fins on front side of building G 10 floor bldg works to be done upto floor 7 et
O and M Estimate for Supply and Application of Cadmium Compound, Lubrication/Overhauling to the Hoist Equipment of RC Gates, HR Gates, Stop Log Gates and 50 Tonne Gantry Crane of Proff G.V. Sudhakar Rao Lower Manair Dam for the year 2026-27
5 TON EOT Non Drive Wheel Shaft as per drawing no: D 97 CL 00 M084 M23, 5 TON EOT Drive Wheel Shaft as per drawing no: D 97 CL 00 M059 M23, Crane Wheel as per drawing no: D 96 CL 00 M004 P16
Working Platform for Mechanical Integration, Storage for Heavy Duty Mechanical items, Storage for Stores Mechanical Items, Heavy Duty Working Platform for Mechanical Integration, Crane Head Protection Wear, ESD Protective Wear with Logo, Discharge Barrier, Earthing Strip 10Sq mm BOQ Title Storage Safety and Protective Items
PKG-IX: Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
PKG - XXIV: Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
PKG-XVI: Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
PKG - XXIII: Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
PKG - XIII: Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
PKG-XVIII: Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
PKG - XX: Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
PKG-VIII: Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
PKG-VI: Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of Jungle growth, chipping and heaping and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation area.
Filling of pot holes with stone dust and gravel, Providing of sand bags and Engaging of blade tractor and back Hoe Loader (JCB) and engaging of labours on ocassion of Vinayaka Chavithi festival 2026 at Kothapally Cheruvu (Pond) of MCK Est. cost of Rs. 3.00 Lakhs under MGF
Filling of pot holes with stone dust and gravel, Providing of sand bags and Engaging of blade tractor and back Hoe Loader (JCB) and providing of barricading and engaging of labours on ocassion of Vinayaka Chavithi festival 2026 at chinthakunta canal of MCK Est. cost of Rs. 2.30 Lakhs under MGF
Desilting and Annual maintenance of open major nala from Swarnajayanthi complex to Begumpet MMTS Railway station, Leela Nagar, SP road to 1-8-303/48/25 and 1-8-303/48/25 to minister road and in old custom basthi nala using Machinery (Hydralic ... (Hydralic excavator ) ...
OUT SIDE MICROMETER ADJUSTABLE AND INTER CHANGEABLE ANVIL TYPE RANGE 900-1000MM, HEIGHT GAUGE DIAL TYPE RANGE 0 1500MM, BEVEL PROTRACTOR RANGE 0 360 AND 730, TORQUE WRENCH RANGE 70 330 NM, CRANE HOOK TYPE 2 5 TON CAPACITY LOAD INDICATOR WITH BOW SHACKLES BRAND CROSS BY OR EQUIVALENT
Removing and Relocating of central dividers with Crane (Cement Blocks) from Moosabowli chowrasta to Moti galli main road and towards Charminar from Laad Bazar and procession route in view of Ganesh festival 2025 in Ghansibazar Div-101, Charminar circle 28, CRZ, GHMC F-Y 2026-27 (Rs.1.40 lakhs)
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING & LEVELLING ETC., OF 460.096 LBCM (INCLUDING IN-SITU TOP SOIL 4.218 LBCM, SUB-SOIL 16.877 LBCM AND HARD OB 439.001 LBCM), DIVERSION OF NALLAH ALONG THE NORTH-WEST SIDE OF THE QUARRY ... 2000 DOZER HOURS ...
Earmarked for "SC/ST/Waddera/Sagara Labour Cooperative societies and individual"- KTPS V VI Stage- Civil- O M- III- Engaging the tractor and Dozer (D50) along with driver for collecting and clearing of debris, garbage, vegetation and leveling of areas at TGGENCO Housing Colony, New Bombay colony, KSP Camp Colony at Paloncha for the period from April 2026 to March 2027
CHP MM Hiring of shovel 0.85 cum 110HP Hydraulic Excavator capacity on Hour basis without Fuel HSD oil including hire and crew charges round the clock as and when required for 9 months from the actual date of commencement utilization or till the completion of quantity for Clearance of RC Hopper Grid jams pertaining to CHP MM1 Sub Division-1 KTPP
TGGENCO KTPP CHP MM Hiring of shovel 0.85 cum 110HP Hydraulic Excavator capacity on Hourly basis without Fuel HSD oil including hire and crew charges round the clock as and when required for 6 months from 01.04.2026 to 30.09.2026 from the actual date of commencement / utilization to till the completion of quantity for Clearance of RC Hopper Grid jams pertaining to SubDivision I
Custom Bid for Services - Earth work excavation in trenches for sub structure foundations etc not, Custom Bid for Services - Providing and laying plain cement concrete PCC 1and3and6 using 40mm, Custom Bid for Services - Providing and laying plain ... Engaging dozer or ... or excavator for ...
Providing LED Drivers PCBs Pole Clamp Sets Light Covers Contactors 2.5 Sq.mm and 4 Sq.mm 2 Core Service Wires ABC Bunch Cables and other necessary materials and engaging a private crane for maintenance of street lighting in Ward Nos. 1 to 33 High Mast Lighting and Central Lighting in Wanaparthy Municipality under Municipal General Funds.
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING and LEVELLING, ETC., OF 1107.353 LBCM OF IN-SITU OB (WHICH INCLUDES 10.145 LBCM OF TOP SOIL, 1039.483 LBCM OF HARD OB and 57.725 LBCM OF COAL) WITH CONVENTIONAL EQUIPMENT, AND ... 20000 DOZER HOURS ...
PJP DAM Design, Drawing, Fabrication, Supply, Erection, Testing and commissioning of 40 Ton capacity , Class II type moving gantry crane with all components nd accessories, rail trak for gantry with CR 80(52.82 Kg/m) and automatic lifting beam as per specification for spillway stoplog gate elements of priyadarshini Jurala Dam, Revulapally(V), Dharoor(M), Jogulamba Gadwal(Dist).
61203300, 904 10023, 40 300750, 1315 34182, 40 301633, 819 00143, 40 302811, 904 50023, 904 20172, 320 07394, 320 A7088, 320 A7170, 333 630, 32 915801, 32 915802, 320 04134, 531 03208, 531 03209, 40 30603, 40 303404, 1345 07012, 1310 0716, 1345 0701, ... 0701, JCB Super, ...
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING AND LEVELLING, ETC., OF 727.824 LBCM OF IN-SITU OB (WHICH INCLUDES 2.082 LBCM OF TOP SOIL, 3.459 LBCM OF SUB SOIL, 682.641 LBCM OF Hard OB, 39.642 LBCM OF COAL), EXCAVATION OF 2.333 ... 4000 DOZER HOURS ...
DRILLING, EXCAVATION, LOADING, TRANSPORTATION, DUMPING, SPREADING and LEVELLING ETC., OF 771.90 LBCM OF IN-SITU OB (WHICH INCLUDES 747.26 LBCM OF HARD OB, and 24.64 LBCM OF COAL) AND RE-HANDLING OF 84.91 LCM LOOSE OB and RE-HANDLING OF 8.38 LCM LOOSE ... 1500 DOZER HOURS, ...
Calibration Services - Mechanical, Electrical, Calibration of Electrical Wire Rope Hoist, Swift Make, Qty 06, 1 Ton each, CALIBRATION SERVICE REQUIRED ONCE IN SIX MONTHS FOR 2 YEARS; Functional Test/Load Test/Proof Load/Calibration of Lifting Mec.., ... EOT Crane 7 ... EOT Crane 5 ...
Micro relay change over 12V 40 301747, Flasher Hazard 40 303389, Buzzer 40 303384, Reverse Horn flasher 40 302585, Engine mounting pad 40 303517, Wiper motor 40 301771, Cabin mounting, Grease gun adapter, Side cutter RH 531 03208, Side cutter LH 531 ... cooler JCB , ...
Repair and Overhauling Service - built up trucks; DOOR HANDLE FOR ASHOK LEYLAND MRS; Yes; Buyer Premises, Repair and Overhauling Service - built up trucks; GROUND SWITCH FOR BEML CFT; Yes; Buyer Premises, Repair and Overhauling Service - Tractors ... - Backhoe Loaders ...