Loading…
Loading…
1,652 results • Best match
Supply, assembly and installation of custom-built wooden furniture in Gleeble Laboratory (Q3)
For Electric wiring in Sampling Rooms at Loyabad Coke Plant Laboratory Sijua Area
Lab scale PTFE Leaching facility
DESIGN AND FABRICATION OF CONTINUOUS VACUUM-DISTILLATION AND CASTING FACILITY OF MAGNESIUM
Supply Installation and Commissioning of HIGH TEMPERATURE EROSION-CORROSION TEST RIG
Supply, Installation and Commissioning of Displacement Measurement Systems and data-logging system for Creep Machines
Upgrdation of MATLAB Software and additional Toolboxes
Supply of Tubular high temperature vacuum furnace with gas purging facility
SUPPLY INSTALLATION COMMISSIONING OF HORIZONTAL FLUDIZED BED REACTOR
Computer controlled Microhardness Tester
Supply, Installation, Testing and Commissioning of Conference Room Audio Visual Solution 02 two Sets
USIMPAC Software New License
X Ray Fluorescence Spectrometer XRF Wavelength Dispersive
SUPPLY INSTALLATION AND COMMISSIONING OF VIBRATING SAMPLE MAGNETOMETER 3 TESLA
Jun air compressor
AMC of Universal Sheet Metal Testing Machine including Software and Camera
Spares of Magnetron Source
AMC OF ULTRA-HIGH RESOLUTION HITACHI SU7000
AMC OF SPARK EMISSION SPECTROMETER
AMC of Inductivity Coupled Plasma Mass Spectrometer (ICP-MS)
AMC of Ion Beam Milling
Astronomy Telescope, First Aid Kit Milton, Sewing Kit, Paper Microscope Biology, Electic Tools Soldering Kit, Water Flow Sensor, Sound Senser, Temperature Sensor
Sampling and Analysis of Copper bearing material at ICC(Works) through LME certified Laboratory
For Repairing of Roller machine size 3.35mm installed at Analytical Laboratory of Kusunda Area
Monthly Random sample analysis of Ore, Tailing and Concentrate from external Laboratory, Mosabani Plant
TRANSCUTANEOUS HANDHELD BILIRUBIN ANAYLZER, MICRO- METHOD BILITUBIN ANAYLZER, BUBBLE CPAP MACHINE, IRRADIANCE METER FOR PHOTOTHERAPY, CENTRIFUGE MACHINE WITH HEMATOCRIT CAPILLARY, AIR OXYGEN BLENDER, T-PIECE RESUSCITATOR
Breath Analyser (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 5, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6517312 Dated : 04-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
SUPPLY, INSTALLATION AND COMMISSIONG OF LABORATORY EQIPMENTS FOR VARIOUS BULK EXPLOSIVE PLANT LOCATIONS OF IOCL
Supply, Erection, Installation and Commissioning of Laboratory Fume Hood with Exhaust for MSB Concen (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Laboratory; Service Provider
HYDRANAL COULOMAT ANODE REAGENT, STD, KARL FISCHER REAGENT FOR COULOMETRY, FERROSPECTRALR FERROZINE LABORATORY, Fine chemicals
Electronic Weighing Scales-IS:9281-3 (1981) part I, II, III & Part IV, Laboratory Hot plate
Procurement of two (02) nos. of coal pulveriser for the Chemical Laboratory,CTPS (2 X 250 MW)
Humidity Chamber (Q3), Laboratory Drying Oven (Q3), Muffle Furnace (Q3), Micro weighing Balance with licensed software (Q3)
Sensor Gas Density Sensor, GD40T/EJAF3, for Yokogawa make Hydrogen Purity Analyser (psl-1) (Q3), Gas Density Converter, Model: GD402T-A-E E, Make: Yokogawa (Q3)
Procurement of Bleaching Powder, Stable grade-II conforming to IS-1065-1989 (2ND Revision) for Chemical Laboratory of CTPS.
Manpower Outsourcing Services - Minimum wage - Skilled; Healthcare; Staff Nurses, Manpower Outsourcing Services - Minimum wage - Unskilled; Healthcare; Laboratory Assistant/Attendant
Upgradation and system refinement of existing FO based VOD system, Advance Optical Power Meter, Optical Time Domain Reflectometer (OTDR), Portable Field Optical Spectrum Analyzer
Barium Chloride In 500 Gm. Pack ( 1 gram ), Lodine Resublimed In 100 Gm. Pack ( 2 gram ), Sodium Thiosulphate (Penta Hydrate) In 500 Gm. Pack ( 1 gram ), Bottle For Chemistry Lab (for Sampling) 500 Ml, Narrow Mouth With Cap, Material- Hard PP, 76-100 ... For Chemistry Lab (for ...
5 Part Automated Hematology Analyser (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6963418 Dated : 04-12-2025 Bid Document 1/11 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 669000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank PUNJAB NATIONAL BANK (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 26 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PUNJAB NATIONAL BANK(08220) Damodar Valley Corporation, Contracts and Materials, Damodar Valley Corporation, Ministry of Power (Damodar Valley Corporation)
Ammonium heptamolybdate tetra hydrate[ (NH4) 6Mo7O24.4H2O] (Q3), Lithium chloride(LiCl) (Q3), Silver Nitrate(AgNO3) (Q3), Laboratory Pipette Rubber Bulb (Q3)
Vertical extension of school/Administrative building (from level 12.6 mtr. to level 30.6 mtr.) for laboratory side only including internal W/S, S/I Internal E.I, lift fire fighting system, fire alarm & PA system, CCTV & networking system, AC system and solar photo voltaic system for IIAB at Garkhatanga, Ranchi SH: Providing various service for office of Architect office CPWD, Airport Road Hinoo Ranchi
Water Proofing of Building with Tarfelt
Office Chair (V3) (Q2), Auditorium Chair (V2) (Q2), Newspaper Reading Stand (Q3), Newspaper and Magazine Stand (Q3), Laboratory Steel Furniture (Q3)
ESR Analyzer (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2025/B/6965582 Dated : 05-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 20000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be 2/7 in favour of Beneficiary, wherever it is applicable. Beneficiary : DEPUTY COMMISSIONER, SERAIKELA KHARSAWAN Office Of The Deputy Commissioner Seraikela Jharkhand (Deputy Commissioner, Seraikela Kharsawan)
Leakage Current Meter/Analyser for Surge Arrester (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6215325 Dated : 13-06-2025 Bid Document 1/19 Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1524464.89 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank PUNJAB NATIONAL BANK EMD Amount 30489 ePBG Detail Advisory Bank PUNJAB NATIONAL BANK (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 42 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DAMODAR VALLEY CORPORATION Damodar Valley Corporation, Contracts and Materials, Damodar Valley Corporation, Ministry of Power (Damodar Valley Corporation) Splitting
single position Glove Box
Special Purpose customized overhead heat treatment furnace
VACUUM IMPREGNATION SYSTEM FOR COAL MOUNT SAMPLE PREPARATION
Spray Dryer with ultra-sonic spray nozzle