Loading…
Loading…
856 results • Best match
Handling and Transport on Lumpsum Basis - Handling & Transport Service
Handling and Transport on Lumpsum Basis - Handling & Transport Service
Handling and Transport on Lumpsum Basis - Handling & Transport Service
Handling and Transport on Lumpsum Basis - Handling & Transport Service
Handling and Transport on Lumpsum Basis - Handling & Transport Service
Handling and Transport on Lumpsum Basis - Handling & Transport Service
Handling and Transport on Lumpsum Basis - Handling & Transport Service
Handling and Transport on Lumpsum Basis - Handling & Transport Service
Handling and Transport on Lumpsum Basis - Handling & Transport Service
Carriage of spillaged coal from the loading section by manual labour including loading unloading and stacking to Belt/chute/Suitable place for a lead less than 0.50 KM for a period of 1 year at Rajrappa Washery Project.
Carriage of spillaged coal from the floors of secondary crusher house by manual labour including loading, unloading and stacking and loading of stacked material to nearby belt/chute/suitable places for a lead less than 0.5 km.
Carriage of accumulated slurry coal from the slurry pond No. 12C by manual labour including loading unloading and stacking in suitable place for a lead less than 0.5 KM at Rajrappa Washery for pollution control related works
Loading, unloading and placing of test weights (20 Kg C.I. each) at the weigh bridge platform for calibration/verification of weighbridge and cleaning the Load Cell area (where load cells wire laid/dressed and load cell mounted)
Carriage of accumulated coal from the area between boundary wall of Regional Store, Rajrappa Washery Project and Bhreja Pond including Rain Water Harvesting Pond by manual labour including loading unloading and stacking and loading of stacked materia
Carriage of spillaged coal from the Raw coal section by manual labour including loading unloading and stacking to Belt/chute/Suitable place for lead less than 0.1 KM for a period of 06 months at Rajrappa Washery Project.
Hiring of truck for collection of wooden support materials i.e., 7000 Nos. of cogging sleepers and 300 nos. of Sal props from Bankura Forest corporation division, Manchantala, Bankura to Regional store, Dhori Area (including loading, unloading and st
Carriage of spillaged washed coal power ground storage (PS-13) by manual labour including loading unloading and stacking and loading of stacked material to nearby suitable place for a lead less than 0.5 KM at Rajrappa Washery Project
Carriage of spillaged coal from gallery and bottom and tail side of 406 and 408 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to nearby belt or chute or suitable place
Loading, unloading and placing of test weights (20Kg C.I. each) at the weighbridge platform for calibration of weighbridge and monthly cleaning of weighbridge platform and load cell area for the period of one year of different weighbridges installed
Handling and Transport on Lumpsum Basis - Handling & Transport Service, Custom handling service
Carriage of spillaged/overflowed coal from the different equipments like chain / belt conveyor and bucket elevators from different floors of 26 Mtrs. , 22 Mtrs. , 16 Mtrs, of PS-5 building by manual labour including loading unloading and stacking and
Dismantling, lowering, loading, unloading and transporting of iron materials from shad of Mahuda Gr. W/S, Mld 20/21 Pits Colliery to Moonidih Project, iron steel materials like different size of guarder, channel, angel, cross bracing and GI Sheet
Carriage of spillaged / overflowed coal from the different equipments like chain / belts / conveyors buckets elevators from the different floors 26 Mtr 22 Mtr and 16 Mtrs of PS-5 building by manual labour including loading unloading and stacking and
Carriage of spillaged coal from the primary crusher house / apron floor by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged coal / accumulated coal from the pit of rail weigh bridge and surrounding area of winch house by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for
Carriage of spillaged / accumulated slurry coal from the surrounding area of static thickener and PS-6 Pump House and its approach drain by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suita
Carriage of spillaged / accumulated slurry coal from the surrounding area of static thickner PS-6 Pump House and its approach drain coal by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute
Carriage of spillaged coal from the floors of secondary crusher house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged / accumulated coal from the surrounding drain and bottom area of PS-4 building by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than
Carriage of spillaged coal from the floor of secondary crusher house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
AMC for two years for cleaning of settling tank no. 1, 2, water flocculator, ground reservoir, drain, jungle and Alum lifting, loading, unloading and carriage from store to filter plant under Kathara Colliery (for a period of two years)
Loading, unloading, dismantling, cutting, welding and laying of 8 inch dia G.I. Pipeline required for extension of the existing delivery pipeline of the 2000 G.P.M. Pump Motor Set, installed at Patch A to supply water to the Reservoir Tank
Carriage of spillaged coal from the floors of secondary crusher house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged coal from the floors of secondary crusher house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged coal from the floor of secondary crusher house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged coal from the floor of secondary crusher house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged / accumulated slurry coal from the surrounding area of static thickner PS-6 Pump House and its approach drain coal by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / sui
Carriage of spillaged/ overflowed coal from the different equipments like chain / belt conveyor and bucket elevator from the different floors 26M, 22M and 16M of PS-5 building by manual labour including loading unloading and stacking and loading of
carriage of Spillaged coal from Apron Feeder Floor Floor of Primary Crusher Secondary Crusher Floor n surrounding area of Raw Coal site office of Raw Coal Section by manual labour including loading unloading stacking to belt chutes suitable place
Handling and Transport on Lumpsum Basis - Handling & Transport Service, As per tender document
Handling and Transport on Lumpsum Basis - Handling & Transport Service, Handling & Transport Service, Handling & Transport Service on Lumpsum Basis - Explosive van of carrying capacity of 10 Te
Carriage of spillaged coal from the different equipments like chain belt conveyors and bucket elevator from the floors of 45M, 35M and 31M of PS-5 building by manual labour including loading unloading and stacking and loading of stacked material to
Carriage of spillaged coal from the floor of 404A and 404B shuttle conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged coal from the floor of 404A and 404B shuttle conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged/ overflowed coal from the gallery and bottom and tail drum side of 406 and 408 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead
Carriage of spillaged coal from the floors of secondary house building by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery w
Carriage of spillaged / overflfowed coal from the gallery of 1301 belt conveyor head drum and tail drum areas by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less
Carriage of spillaged coal from the floors of 404A and 404B shuttle conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Cleaning/ Carriage of already accumulated slurry coal from the Bhareja Pond by manual labour including loading, unloading and stacking and loading of stacked material to nearby belt/ chute/ suitable places for a lead less than 0.5 km at Rajrappa Was
Carriage of spillaged coal from the gallery of 1301 belt conveyors head drum and tail drum area and surrounding area of ground silo by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / sui