Loading…
Loading…
856 results • Best match
Carriage of spillaged coal from the floors of primary crusher house / apron floor by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Wash
Cleaning the slurry and debris under the weighing platform of KKC link siding road weighbridge and its outside drain and transporting of 20kg CI test weights from KKC link siding road weighbridge to Damoda road weighbridge and loading unloading and s
Carriage of spillaged /overflowed coal from the apron floor from AB side of receiving Raw Coal Bunker by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5
Carriage of accumulated slurry / coal from the surrounding area of fresh water pump house and its approach drains by manual labour including loading unloading and stacking and loading of stacked material to nearby suitable place for a lead less than
Carriage of spillaged / overflowed coal from the different equipments like chain / belts / conveyors and bucket elevators from different floors of 26 Mtrs. 22 Mtrs. 22 Mtrs. 16 Mtrs. Of PS-5 building by manual labour including loading unloading and s
Carriage of spillaged / overflowed coal from the bottom and tail drum area of 406, 408, belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.
Carriage of spillaged coal from the floors of 1106 belt surrounding area of rail weighbridge by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than 0.5 KM
Carriage of spillaged coal from the floor of secondary house building by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged coal from the different equipments like chain, belt conveyors and bucket elevator from the floor 45M, 35M and 31M of PS-5 building by manual labour including loading unloading and stacking and loading of stacked material to belt
Carriage of accumulated slurry coal from the underside of mechanical workshop by manual labour including loading unloading and stacking and loading of stacked materials to nearby belt/ chute/ suitable place for a lead less tha 0.5 KM at Rajrappa Wa
Carriage of spillaged / overflowed coal from the apron floor from AB side of Receiving Raw Coal Bunker by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5
Carriage of spillaged coal from the floor of 404A and 404B shuttle conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged / overflowed coal from the gallery and bottom area of 5011 and 5012 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than
Carriage of spillage coal from the floors of 1106 belt surrounding area of rail weighbridge by manual labour including loading, unloading and stacking and loading of stacked material to nearby belt/chute/suitable places for a lead less than 0.5 km
Carriage of spillaged accumulated washed coal power from the surrounding area of winch house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Raj
Cleaning/Carriage of accumulated slurry coal of drain from WCP boundary wall towards north side 11A slurry pond by manual labour including loading, unloading ,stacking of material to suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged / overflowed coal from the gallery and bottom and tail drum side area of 406 and 408 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for
Carriage of spillaged coal from the 305 Screen and its floor area by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM of Rajrappa Washery
carriage of spillaged coal from the surrounding area of media circuit by manual labour including loading unloading stacking and work of iron ore loading and charging by manual labour to media tank or a period of 1 year in RJP Washery
cleaning of spillage coal from different floors and equipment of PS5 main washing plant n PS4 building by the Manual labor including loading unloading n stacking to belt/chutes/suitable place for Lead less than 0.50 KM at Rajrappa Washery
Carriage of accumulated coal from the Rail weighbridge area and surrounding area of winch house by manual labour including loading, unloading and stacking loading to nearby belt/chute/suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged coal from the floor of primary crusher house / apron floor by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washer
Carriage of spillaged / overflowed coal from the gallery of 1301 belt conveyor head drum and tail drum areas by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less th
Carriage of Spillaged coal from the Raw coal section by manual labor including loading unloading and stacking to Belt/chute/Suitable place for a lead less than 0.1 KM for a period of 03(Three) months at Rajrappa Washery Project
Carriage of spillaged / overflowed coal from the gallery and bottom and tail drum side of 406 an 408 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead
Carriage of spillaged coal from the floor of primary crusher house / apron floor by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washer
Carriage of spillaged / accumulated coal from the surrounding drain and bottom area of PS-4 building by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5
Carriage of spillaged /overflowed coal from the gallery and bottom area of 5011 and 5012 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0
Carriage of spillaged / overflowed coal from the different equipments like chain, belt conveyor and bucket elevator from the floors of 45M, 35M and 31M of PS-5 building by manual labour including loading unloading and stacking and loading of stacked
Carriage of accumulated slurry coal from the under side of mechanical workshop by manual labour including loading unloading and stacking and loading of stacked material to nearby suitable place for a lead less than 0.5 KM at Rajrappa Washery Project
Carriage of spillaged coal from the surrounding areas of raw coal site office by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of already accumulated slurry coal from the back side of light vehicle workshop drain to new culvert ner Bhareja Pump House by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute/ su
Carriage of spillaged coal from the floor of primary crusher house /apron floor by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa
Carriage of spillaged coal from the floors of 404A and 404B shuttle conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of already accumulated slurry coal from the inside of mechanical workshop by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute/ suitable place for a lead less than 0.5 KM at Rajrapp
Carriage of spillaged / overflowed coal from the gallery and bottom area of 5011 and 5012 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0
Loading, unloading and placing of Test weights (20 Kg C.I each) at the weighbridge platform during weights verification/Calibration of weighbridge no-2 installed at PEOCP under Hzb. Area. for verifications during 12 months at an interval of 2 weeks.
Carriage of spillaged coal from the floors of 404A and 404B shuttle conveyors by manual labour including loading, unloading and stacking and loading of stacked material to nearby belt/chute/suitable places for a lead less than 0.5 km
Handling and Transport on Lumpsum Basis - Handling & Transport Service, for Ranchi OA under Ranchi BA
Handling and Transport on Lumpsum Basis - Handling & Transport Service, for Daltonganj OA under Ranchi BA
Handling and Transport on Lumpsum Basis - Handling & Transport Service, for Hazaribagh OA under Ranchi BA
Carriage of spillaged coal from the gallery and bottom areas of 301B and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Raj
Carriage of spillaged coal from the gallery of 1301 belt conveyors head drum and tail drum area by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at
Carriage of spillaged coal from the gallery and bottom areas of 301B and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Raj
Carriage of spillaged coal / boulder from the area in between tail side of 301A and 301B and area between tail side of 401A and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to nearby be
Carriage of accumulated slurry coal from the surrounding area of PS-14 and pump house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa
Carriage of spillaged / overflowed coal from the bottom area of 1001 belts and west side of drain of PS-5 building by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead l
Carriage of spillaged coal from the bottom area of 301A and 401A belt conveyor by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged coal from the roof of 406, 408 belt shed near transfer point by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Wash
Carriage of spillaged coal from the gallery and bottom areas of 301B and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than 0.5 KM