Loading…
Loading…
19,485 results • Best match
Dismantling, lowering, loading, unloading and transporting of iron materials from shad of Mahuda Gr. W/S, Mld 20/21 Pits Colliery to Moonidih Project, iron steel materials like different size of guarder, channel, angel, cross bracing and GI Sheet
Supplying of Mirzapur Stone Boulder Protection of bund Spur No-7 on Vikramjot - Dhuswa Bund Km 10.750 stack yard on Left Bank of River Ghaghara in Distt- Basti including loading, unloading carriage and stacking etc all complete. Lot-01
Cleaning with loading, unloading of coal, coal-dust, rejection coal, scraped materials, deposited mixed earth, garbage, deposited ash, silt, slurry etc. and transportation of same from mill areas of unit-5 and 6...to the disposal yard of STPS.
Carriage of spillaged / overflowed coal from the different equipments like chain / belts / conveyors buckets elevators from the different floors 26 Mtr 22 Mtr and 16 Mtrs of PS-5 building by manual labour including loading unloading and stacking and
Carriage of spillaged coal from the primary crusher house / apron floor by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
For Six Months Replacement and Loading/Unloading of various capacity damaged small and medium distribution transformers installed from site to T/F workshop for DTC under the work area of B.K.T. Sub-Division, Under the jurisdiction of EDD-B.K.T.
Carriage of spillaged coal / accumulated coal from the pit of rail weigh bridge and surrounding area of winch house by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for
Construction of 35 (Thirty Five) Nos. Ventilation stopping and loading, unloading, laying of track line and haulage rope in proposed development panel of 25LW/21D in MK(T) seam at Bartarai Colliery, Amadnad UG Sub Area, , Jamuna Kotma Area.
Carriage of spillaged / accumulated slurry coal from the surrounding area of static thickener and PS-6 Pump House and its approach drain by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suita
Engaging of workers/labours for desilting and cleaning storm water drain including removing and refixing of slab and also loading, unloading desilt earth/mud in the open truck in ward no. 22 to 25 (Dabolim Constituency) within Municipal Jurisdiction
Carriage of spillaged / accumulated slurry coal from the surrounding area of static thickner PS-6 Pump House and its approach drain coal by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute
Transportation of 132 33 KV 20 25 MVA Transformer from 132 KV GSS Lalamdeshar distt BIKANER to 132 KV GSS Sanwad Distt Udaipur including Loading Unloading Insurance of Transformer for Aug work of Transformer at 132 kv GSS Sanwad
Carriage of Stock Material from One Store Center to another Store Center Under Jurisdiction of ESD, Kanpur and One Store of Other Division to Store Centers of this Circle under DVVNL, UPPCL Including Loading Unloading and proper stacking etc.
Carriage of spillaged coal from the floors of secondary crusher house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged / accumulated coal from the surrounding drain and bottom area of PS-4 building by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than
Carriage of OB soil/alluvium by mechanical transport from Rajnagar Opencast mine to Malga Colliery including loading, unloading, stacking and filling of transported materials in abandoned Incline no.1 and 2 and 02 nos. Airshaft of abandoned mine of
Carriage of spillaged coal from the floor of secondary crusher house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Construction of Wharf area (loading/unloading platforms) along with the associate of civil works such as drains etc and execution of various track works for the construction of proposed Ballast, Goods and Tower Wagon Siding etc in BEHR Yard
AMC for two years for cleaning of settling tank no. 1, 2, water flocculator, ground reservoir, drain, jungle and Alum lifting, loading, unloading and carriage from store to filter plant under Kathara Colliery (for a period of two years)
Repairing, Painting, Adjustment, Sealing, Punching of Seal, Cleaning, Brushing, Rearrangement including Loading/Unloading, Stamping and Certification of C.I. Master Weights (50 Kg each) pertaining to Test Wagons of Test Rakes of TPJ, MAS, MDU & TVC Divisions at LW/PER
Collection of scrap, loading, unloading and deposition of scrap at R/S CWS Jayant and material handling of spares for transmission and torque convertor assemblies and their dismantled parts in transmission shop for a period of 350 working days.
Annual work contract for handling of store material i.e. Loading Unloading, cleaning an stacking of items, preparation of SRNs and SINs of Store related items and operation of Hydra, LCV, diesel pump and weighbridge etc in KaTPP Store, Jhalawar
Hire and labour charges of Four wheeler Motor van Mounted PVC tank to various water scarcity area including loading unloading of PVC tank from nearby Pipe Water source of water within different draught prone area at Madarihat-Birpara Block
Loading, Unloading, Handling, Laying and Jumpering on overhead lines of PVC power cables, flexible cables from Unit Store, Workshop and field to work place for day to day switch shifting work in mines at Lakhanpur OCP, Lakhanpur Area, MCL
Contract for Providing of reliable and un-interrupted Power Supply during Shri Amarnath Ji Yatra 2024 BWO Loading ,Unloading including servicing of 1 No 62.5 kVA DG Set from Divisional Store Sumbal to Transit Camp Shadipora and its return
Supply of poly aluminum chloride PAC high basicity powder AI203-28 per is 15573-2018 including Transp. loading unloading and stacking at 90,95,363 MLD water treatment plant at Mandleshwar and village Bahklai with Transp. of Indore water Supply proje
For 06 Months Replacement and Loading/Unloading of various capacity damaged small/medium capacity distribution transformers installed at site in the work area of G.P.R.A. and New Campus, Sub-Division to T/F workshop for DTC, Under EDD-BKT
Rate Contract for Hiring of Back Hoe Loader Hydraulic Excavator 3d, Pneumatic Hammer and Crane for use in removal, Excavation and Leveling of Surface and Work of Loading/ Unloading at various Park in Horticulture Department, South Delhi Municipal Cor
Manufacture, Supply, Erection loading unloading at site along with all civil, mechanical ,electrical works and Commissioning of Pit less type fully Electronic Weigh Bridge having 50 MT capacity with a least count of 5 kgs and having a platform
Providing liquid chlorine gas cylinders (each containing 900 Kg) including carriage, loading, unloading and stacking at Water Works Sector 39 for use at Water Treatment Plant, Sector 39 Chandigarh and other Water Works for period of 12 months during
Providing liquid chlorine gas cylinders each containing 900 kg including carriage, loading, unloading and stacking at Water Works, Sector-39 for use at Water Treatment Plant, Sector 39, Chandigarh and other Water Works for period of 12 months during
Carriage of Stock Material from One Store Center to another Store Center Under Jurisdiction of ESD, Banda and One Store of Other Division to Store Centers of this Circle under DVVNL/UPPCL Including Loading/Unloading and proper stacking etc
Appointment of Handling Contractor (HC) for Loading / Unloading and Handling of food grains and other notified commodities as well as dead stock articles at HSWC godowns hired by FCI under guarantee Scheme at SWH Bhattu (Arihant Warehouse and Logisti
For Six Months, Replacement and Loading/Unloading of various capacity damaged small and medium capacity distribution transformers installed from site to T/F workshop for DTC under the work area of Itaunja, Sub-Division, Under jurisdiction of EDD-BKT
Dismantling Loading Unloading Transportation from Takari LIS St.2 to Tembhu LIS St.1A and Erection Testing and Commissioning of 50 MVA 220, 33 kV and 25 MVA, 33,6.6 kV Power Transformer at Tembhu LIS St.1A at Tembhu
Carriage, Loading, Unloading and required Rolling, Dragging of harvested SFC produce of 2024-25 from Mongpong-14 SFC sites to the Mongpong Timber Depot (Distance 0-10 Kms.) under Mongpong Logging and Eco Tourism Range of KPGD, WBFDC Ltd.
Loading, unloading, dismantling, cutting, welding and laying of 8 inch dia G.I. Pipeline required for extension of the existing delivery pipeline of the 2000 G.P.M. Pump Motor Set, installed at Patch A to supply water to the Reservoir Tank
Carriage of spillaged coal from the floors of secondary crusher house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Installation of New LT ABC ckt at Bamrauli, Prayagraj in BP-2022-23 (Upcoming Summer Season), including loading, unloading and Carriage of materials from Store Center Naini to Dump site and vice-versa, under supervision of EUDD-Bamrauli, Pyg.
Loading, unloading, transportation and installation of 2 no of 90KW, 1000 mm belt conveyor complete with electricals (one at 65LW/BD-HD in W8 section and another at 14L/BD of Bagdona Seam) at Tawa Mine Pathakhera Area WCL
Misc. works jungle clng, external painting of office bldg and periphery area repairing of loading unloading platform replcmnt of AC sheet with CGI sheet of frnt verendah, pantng of back side shed and levelling dressing under Regional store OA
Carriage of spillaged coal from the floors of secondary crusher house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged coal from the floor of secondary crusher house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Construction of 01 No. haulage foundation 60L N/8D, haulage material transporting (loading, unloading and fixing etc) up to 500Mtr, laying of one pair track line upto 40 Mtr and line packing in PG-4 panel, at Meera Incline
Loading, unloading and Mechanical carrying of Ductile iron pipes (Class K-9) of dia varies from 150 mm to 300mm from Barjala TRTC complex to Water Treatment Plant complex near Old Raj Bhavan Agartala in/c. all allied works.
Carriage of spillaged coal from the floor of secondary crusher house by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Loading unloading and safe cartage of burnt and damaged double pole mounted CT/PT combined unit under E.D.D.,Robertsganj from various places i.e. from different work places to Electricity Store Sub-Division (ESSD), Robertsganj and new CT/PT combine
Custom Bid for Services - Loading Unloading Transportation of Guards and Crew line boxes from all trains brake van special trains Light engines Road Vehicle to box RoomNominated place at Platform by SSSDLP and vice versa at Sadulpur Railway statio..
Supply Delivery and Installation of 100 Ltr capacity Nilkamal litter free twin bins Blue and Green color wth caps a MS stand handling twin bins and easily rotated front and back including transportation, loading, unloading and erection of bin
Loading, Unloading and Safe Carriage of 24 Fibre OPGW from 132 KV S/S Shatrughanpur-Gorakhpur to 132 KV S/S, Harraiya-Basti and installation of OPGW at 132 KV Basti (400 KV)-Harraiya Line Under ETD-I, Basti.