Loading…
Loading…
5,044 results • Best match
Overhauling kits for 18 months of Compressor Type 3HC-55 of M/s KPC
Tangerine handicraft brass plant container dia 16 inch X 12 inch, portable air compressor, tyre polish 5 ltr, Liquid car wax 01 kg, VIP folder leather BOQ Title BOQ Items
Procurement of Ingersoll Rand Mill Reject Compressor Spares (Model 16and 10 X 7 PHE7 NL) Stg III at NTPC Rihand
COMPREHENSIVE MAINTENANCE TO CENTRAL AC PLANTS OF VARIOUS CAPACITIES AND OVERHAULING OF AC COMPRESSORS OF AC PLANTS AND CONNECTED ALLIED WORKS UNDER GE UII VISAKHAPATNAM
Carrying out rectification works of SS gratings for eco, LTR and LTS area gratings, providing new T pieces in place of missed, damaged T pieces and metal build up of boiler tubes wherever necessary in the areas of eroded tubes in path of soot blowing ... VI Boilers during ...
EXCAVATING CONVEYOR BELT as per plasser part no. RE20.725, MAKE - Plasser, Dunlop, Nirlon,MRF,MR,Virshubh,Biswas& Jagriti.
Procurement of 40mm thick Ni-Hard IV conveyor body liners for Ball Tube Mills of Type BBD-4760
Procurement of Hydraulic Cylinders for Scraper Conveyor for Bottom Ash Hoppers of Unit-3&4 of Stage-II
Procurement of Conveyor body liners and ceramic tiles for ball tube mills of Stg-3 of Dr NTTPS.
Procurement of Conveyor body liners and ceramic tiles for ball tube mills of Stg-3 of Dr NTTPS.
Procurement of Non Drive pulley for the Boom conveyor Stacker reclaimer-I in MMSD-III/MMD/CHP /RTPP
Procurement of Screw conveyor Bearings HOUSINGS for Ball tube Mills of type BBD 4760 for Units 5&6
Procurement of Non Drive pulley for the Boom conveyor Stacker reclaimer-I in MMSD-III/MMD/CHP /RTPP
laying and jointing of the steel cord pipe conveyor belts of ECCS for the financial year 2024-25
Procurement of Hydraulic Cylinders for Scraper Conveyor for Bottom Ash Hoppers of Unit-3&4 of Stage-II
Supply of Screw Conveyor Bearings and its accessories for Ball tube Mills of Stage-II&Stage-III/Dr.NTTPS.
Custom Bid for Services - 200137017 Biennial contract for Vulcanizing and Lagging of CHP Conveyor system at NTPC SIMAHDRI
RTPP-Stage-II-O&M-Maintenance of common areas in all floors of main power house cleaning of ground at boilers ESPS of stage-II for 2017-18
Repairs and replacement of damaged insulation at various areasof boilers in units-3 and 4 as and when required during the year 2023-24 including annual overhaul works.
Refractory, Insulation and fixing of MS wire weld mesh works in the various areas of Boilers 5 &6 during the annual overhaul period for the year 2016-17.
Replacement of damaged Non-metallic expansion joints fabric of FG ducts of Unit I & II Boilers, stage-I Dr. NTTPS during Annual Overhauls for the year 2025-26.
Procurement of ceramic fiber blankets and Gratings at cold end side ( 5APC. FALK) of Air Preheaters 27VI(T) 72inch 74inch of Unit 1&2 Boilers of Stag1, Dr.NTTPS
Procurement of ceramic fiber blankets and Gratings at cold end side ( 5APC. FALK) of Air Preheaters 27VI(T) 72inch 74inch of Unit 1&2 Boilers of Stag1, Dr.NTTPS
Repairs and replacement of damaged insulation at various areasof boilers in units-3 and 4 as and when required during the year 2023-24 including annual overhaul works.
Supply of Spares for Bowl Mills XRP-783 of Units-I&II Boilers as per IS:210 FG 260Gr & ASTM A48 class 40 standards of Stage-I/Dr.NTTPS.
Break down and Repair Works Estimate for Belt Replacement, Belt Joint and pulley lagging for the conveyors in Coal Handling plant/Unit#3 during the financial year 2026-27
Break down and Repair Works Estimate for Belt Replacement, Belt Joint and pulley lagging for the conveyors in Coal Handling plant/Unit#3 during the financial year 2026-27
Break down and Repair Works Estimate for Belt Replacement, Belt Joint and pulley lagging for the conveyors in Coal Handling plant/Unit#3 during the financial year 2026-27
Break down and Repair Works Estimate for Belt Replacement, Belt Joint and pulley lagging for the conveyors in Coal Handling plant/Unit#3 during the financial year 2026-27
Repairs and replacement of conveyor belt, SS flat with needles, ss drum rollers, SS guards, Bearings and linked chain etc. for Mechanical Power Operated Escalator screen conveyor belt on out fall drain at Nizam Gate in circle-1 area Rc.E3-120171/2025
Rate Contract for Stitching of Boiler Suits, Shirts and Long Pants for a period of two years
Supply of Spare Quartz Secondary Boiler Condenser 1.5L PH as per enclosed tender specifications at Q (Q3)
Custom Bid for Services - SUPPLY AND RETUBING OF 13 TPH BOILER TUBES FOR YS DEPARTMENT AT NDV
D-meter Survey and rectification of eroded tubes in Unit-I Boiler during the overhaul 2020-21
Repairs of flue gas duct (APH outlet and to ESP inlet) at the boiler of unit- 2
Construction of shed for boiler at SVU College of Engineering Hostel for men's in SVU Campus, Tirupati.
Supply laying of steam pipeline from Boiler room to Kitchen at Tholappa Garden New SV Annaprasadam Tiruchanoor
Supply laying of steam pipeline from Boiler room to Kitchen at Tholappa Garden New SV Annaprasadam Tiruchanoor
Certain Repairs to Insulation, Cladding sheet and Refractory in Unit-I Boiler for the year 2022-23
Replacement of eroded furnace inlet term tubes bends in Unit 1 Boiler during the 2024 25 overhaul
Certain Repairs to Insulation, Cladding sheets and Refractory in Unit-II Boiler for the year 2022-23
Carrying out stress relieving of FSH tubes and Bends in Unit-1 Boiler during 2025-26 Overhaul
Supply and Installation of 1 Tonne Capacity IBR Steam boiler to Annadanam building to Srisaila Devasthanam, Srisailam
supply of bolt with nuts for esp,aph and ducts for unit-i and ii of boiler
supply of bolt with nuts for esp,aph and ducts for unit-i and ii of boiler
Certain repairs to Insulation, Cladding sheet and Refractory in Unit-2 Boiler for the year 2026-27
PROCUREMENT OF FREE FLOAT AIR TRAP FOR INSTRUMENT AIR LINE CONDENSATE TANKS AT BOILER AND TURBINE AREAS
Supply and fixation of Rice Preparation Boiler set, Gas Stoves, Gas Bank, Chimney, etc. to Cooking Building
Certain repairs to Insulation, Cladding sheet and Refractory in Unit-2 Boiler for the year 2026-27
Certain repairs to Insulation, Cladding sheet and Refractory in Unit-2 Boiler for the year 2026-27