Loading…
Loading…
5,045 results • Best match
Providing machinery such as Hydraulic excavator, Tractor on hire basis to carryout miscellaneous works HLC No.2 Section HPC
Providing weed removal by manual and machinery on YLM Canal, from Km 60.00 to Km 80.00 in Reach-I.
Providing weed removal by manual and machinery on YLM canal from Km 80.00 to km 100.00 in Reach-II
Engaging labour and machinery for rectification of water supply distribution leaks in 1 to 18 wards of Tadepalligudem Municipality
Construction of Modern Laundry building and providing machinery at Dhobi Ghat at MC market Premises in Division No.19.
Operation and Maintenance of Newly Procured Machinery/Vehicles by Engaging cleaners/ for a period of 12 months (General funds)
Procurement of Tools, equipment and Machinery along with installation, testing and commissioning for SKILL DEVELOPMENT CENTRE at Training Institute
Towards supply of Agricultural Engineering Machinery and Prime Mover (Tractor) at Dept. of Agricultural Engineering, Regional Agricultural Research Tirupati
Providing Pumpset machinery to CPWS Scheme to Ammanabrolu and Other habitations in N.G.Padu Mandal of Prakasam District., Est.cost:15.00lakhs
Supply and delivery of Machinery for cleaning of UDS Rodding machine with flex spring steel rods in Srikalahasthi Municipality
Annual maintenance and supply of materials to machinery inside Sri T T at Tirumala for the year 2021-22
Desilting of Major Drains in 21 - 25 Divisions by engaging of machinery and Man power in Anantapuramu Municipal Corporation.
Providing weed removal by manual and machinery from Km 0.00 to Km 15.00 in Reach-I on YLM canal.
Goods Transport Service – Per KM Based Service - Machinery & Equipment; 19 FT 6 WHEEL 8 TON TRUCK; 19 FT LCV
Repair and Overhauling Service - INTERNAL CLEANING OF MAIN BOILER USING HIGH PRESSURE WATER JETTING ONBOARD IN SHIP; ANY OTHER SUITABLE BRAND; No; Buyer Premises
Removal of existing roof sheet and Installation of new roof sheet with turbo ventilators in in Boiler House Phase II at Tummalapalle plant area
Major Overhaul of 6.6KV and 415V motors of Units-3&4 Boiler, Turbine & Common Auxiliaries as and when required during the year 2019-20
Removing of ash from pent house extended floor to disposal yard and Jet cleaning inside the Boiler of Unit-2 during 2024-25 overhaul
Repair and Overhauling Service - REPAIR REFITMENT AND SETTING TUNING OF MAIN BOILER MOUNTING OF ONBOARD IN SHIP; ANY OTHER SUITABLE BRAND; Yes; Buyer Premises
Major Overhaul of 6.6KV and 415V motors of Units-3&4 Boiler, Turbine & Common Auxiliaries as and when required during the year 2017-18.
RTPP-Stage II &III-O&M-Civil- Removal and disposal of ash , debris in Stage-II & III Boiler areas for the year 2020-21
Major Overhaul of 6.6KV and 415V Motors of Units 3&4 Boiler , Turbine & Common Auxilaries as and when required during the year 2018-19
Break-down and repair works for Collecting electrodes in ESP passes of Unit-2 Boiler as and when required during the year 2019-20
Removing of ash from pent house extended floor to disposal yard and Jet cleaning inside the Boiler of Unit-2 during 2024-25 overhaul
Major Overhaul of 6.6KV and 415V motors of Units-3&4 Boiler, Turbine & Common Auxiliaries as and when required during the year 2017-18.
Removing of ash from pent house, extended floor to disposal yard and Jet cleaning inside the Boiler of Unit-2 during 2025-26 overhaul
Removing of ash from pent house, extended floor to disposal yard and Jet cleaning inside the Boiler of Unit-2 during 2025-26 overhaul
Removing of ash from pent house extended floor to disposal yard and Jet cleaning inside the Boiler of Unit-1 during 2024 25 overhaul
Repairing of 20inch spool pieces at all corners of burner compartment of Boiler of Unit 2 during annual overhaul for the year 2025-26.
Repairs to ESP Roof and EERM manual door of the ESP pass-C&D of Unit-2 Boiler during the running period 2019-20
RTPP-Stage II &III-O&M-Civil- Removal and disposal of ash , debris in Stage-II & III Boiler areas for the year 2022-23
RTPP-Stage II &III-O&M-Civil- Removal and disposal of ash , debris in Stage-II & III Boiler areas for the year 2020-21
Supply erection and commissioning of Revomax D 850 kg per hr Boiler to Feed Milling Plant at S V Gosamrakshanasala TTD Tirupati Sub estimate
Major overhaul of 6.6KV motors of Boiler, Turbine and Common auxilliaries of units- 3 & 4 as and when required during the year 2022-23.
Removing of ash from pent house extended floor to disposal yard and Jet cleaning inside the Boiler of Unit-2 during 2024-25 overhaul
Removing of ash from pent house extended floor to disposal yard and Jet cleaning inside the Boiler of Unit-1 during 2024 25 overhaul
Engaging of Boiler operators on monthly hire basis at Laddu potu belongs to Srisaila Devasthanam, Srisailam (on rate contract) for a period one year
Providing of electrical cables & controls for the proposed shifting of Pump room, Boiler room & Madhavam Rest House main cables etc., at Srinivasam Complex, Tirupati
SUPPLY OF SUPERCERA CERAMIC FIBER INSULATION WOOL FOR APH AND HP-1203 MILLS OF UNIT-I AND II BOILER FOR THE YEAR 2021-22
Break-down and repair works for Collecting electrodes in ESP passes of Unit-2 Boiler as and when required during the year 2019-20
Major Overhaul of 6.6 KV motors of turbine ,Boiler and Common auxiliaries of Unit3 & 4 as and when required during the year 2025-26
Repair and Overhauling Service - REPIR AND PRESSURE TESTING OF AUXILIARY BOILER AND ASSOCIATED SYSTEMS ONBOARD IN SHIP; ANY OTHER SUITABLE BRAND; No; Buyer Premises
Custom Bid for Services - 200134699 Overhauling or Replacement of Coal Burners of Boiler 500 MW Unit Stage 1 during 202425 Overhauling at NTPC Simhadri
Custom Bid for Services - Annual Contract for Housekeeping of Boiler or TG and FGD area including mill reject handling and transportation at NTPC Simhadri
Overhaul of 120 TR open type AC compressor, rewinding and mechanical overhaul of 7.5 TR AC compressor, overhaul of chiller pumps and other miscellaneous works of Unit-3&4 of Stage-II as and when required during the year 2026-27 from the date of commencement to 30.09.2026.
VB Probe Metrix ST5484E 151 14 3 4 0 0, EXT Cable Metrix ST5484E 151 14 3 4 0 0, ROD DRP PRB Metrix MX2030 73 000 050 10, EXT Cable Metrix MX2031 090 01 05, PROXIMITOR Metrix MX2031 090 01 05
M2289166080, M2289166105, M2289166123, M2289166169, M2289536203
PRESSER PIPE LINE-part no.-00042658, PRESSURE PIPE LINE-part no.-000426591, AFTERCOOLER PIPE NO 1-part no.-000110940, V BELT-part no.-000905435, SAFETY VALVE ASSY. 3-4 BSP-part no.-0004356A, SHUT OF VALVE ASSY-part no.-000315240, ERMETO 1 INCH X 1 ... ELGI AIR COMPRESSOR COMPT.WITH-part ...
Overhauling of bottom ash hopper and scraper conveyor of Units-3&4 of Stage-II, Dr.NTTPS during the annual overhaul period for the year 2021-22.
SITC of Non-Inline Departure BHS System for 28 Nos Checkin Counters and 4 Nos Endless Slat Type Flat Arrival Carousal Conveyor Belts at Rajahmundry Airport