Loading…
Loading…
5,054 results • Best match
Overhauling of bottom ash hopper and scraper conveyor of Units-3&4 of Stage-II, Dr.NTTPS during the annual overhaul period for the year 2020-21.
Overhauling of bottom ash hopper and scraper conveyor of Units-3&4 of Stage-II, Dr.NTTPS during the annual overhaul period for the year 2019-20.
Engaging of man mazdoor for maintenance of Conveyor belt machine (For Dry waste) at SWM unit at Ramapuram for month of Dec-2025, Jan & Feb-2026
Replacement of damaged ribbons tie rods conveyor body liners and Hot air boxes of mills of Unit 1 during annual overhaul for the year 2022-23
Labour charges for major welding works of Bottom ash hoppers clinker grinder bodys feed gate bodys bottom ash conveying pipe lines of 200NB size from Bottom ash hoppers to ash pump house and Refilling of material for clinker grinder and gear box shafts of Unit-I and II as and when required for the year 2024-2025.
Fabrication of new adjustable coal nozzle tips 26"size with divider plate "Y" and "Z" arrangement for all corners 2&4 and 1&3 of units-3&4 boilers as and when required during the year 2019-20.
Fabrication of Modified new adjustable coal nozzle tips 26 inches size with Divider plate Y and Z arrangement for all corners 2 and 4 and 1 and 3 of units 5 and 6 boilers for year 2022-23
Replacement of the damaged insulation over FG Ducts, steam pipe line, around boiler Ist & II nd pass & Replacement of Refractory at various locations of Boiler of Unit-I & II, for a period of 6 months from the date of commencement of work as and when required during the year 2026-2027, including Annual Overhauling works.
Providing labor assistance for cleaning of Jammed /overloaded coal at bunker floor conveyors and TP belt feeders and various locations of MM-II Sub-division/CHP(M.M)-I&II/Dr.NTTPS., during rainy season for the financial year 2025-26.
Providing labor assistance for cleaning of Jammed /overloaded coal at bunker floor conveyors and TP belt feeders and various locations of MM-II Sub-division/CHP(M.M)-I&II/Dr.NTTPS., during rainy season for the financial year 2025-26.
Providing labor assistance for upkeeping of conveyors & Stackers/Reclaimers in M-II & M-IV Sub-Divns./CHP(M.M)-I&II/Dr.NTTPS. as and when required during the year 2026-27(From 01.04.26 or from commencement of work to 30.09.26)
Providing labor assistance for cleaning of Jammed /overloaded coal at bunker floor conveyors and TP belt feeders and various locations of MM-II Sub-division/CHP(M.M)-I&II/Dr.NTTPS., during rainy season for the financial year 2025-26.
Removal, fabrication and erection of M.S Plates and HR Sheets for crusher house in MM III Sub division of CHP Stage III Dr.NTTPS as and when required for the year 2021 to 2022
Annual maintenance works Fire Hydrant, Mulsifier systems and air lines and Overhaul of Instrument Air Compressors, Air drying Units,& fire hydrant booster pumps of Stage-III as and when required during the year 2021-22.
Annual maintenance works Fire Hydrant, Mulsifier systems and air lines and Overhaul of Instrument Air Compressors, Air drying Units, fire hydrant booster pumps of Stage III as and when required during the year 2022-23
Replacement of damaged Condensers and Compressors, cleaning of suction air filters of AHUs, chemical cleaning of condenser tubes of Chillers and AC Package units of AC plant/Stage-I/Dr.NTTPS for the year 2025-26.
Annual maintenance works Fire Hydrant, Mulsifier systems and air lines and Overhaul of Instrument Air Compressors, Air drying Units & fire hydrant booster pumps of Stage-III as and when required during the year 2021-22.
Material Handling work involving receipt, unloading, stacking, issue of materials, for the Revamping of 2 nos. of Air Pre-heaters of Boilers (2 X 330 TPH) at RINL Visakhapatnam Steel Plant in Visakhapatnam-Andhra Pradesh using contractors own tool
Cooling fan with flange assembly as per M/s. ELGI part no. A070067 for RR20100 CG(M) compressor of 3-phase locos.
Supply and delivery of PAS, MAC 1000 Compressor Set for maintenance of UGD manholes in Circle-3 area. (General Funds) (4th call)
Urgent repairs and replacement of A Cs copper tubes and compressor etc in (R&B) IB and State Guest house at Guntur
Supply and delivery of PAS, MAC 1000 Compressor Set for maintenance of UGD manholes in Circle-1 area. (General Funds) (4th call)
Supply and delivery of PAS, MAC 1000 Compressor Set for maintenance of UGD manholes in Circle-3 area. (General Funds) (3rd call)
Supply and delivery of PAS, MAC 1000 Compressor Set for maintenance of UGD manholes in Circle-1 area. (General Funds) (2nd call)
Hire charges for providing JCB, Proclainer, Compressor, and Tractor for dismantling the structures (houses/shops/lodges) in view of the Master Plan
PROCUREMENT OF 37KW 50HP COMPRESSOR, 7BAR WORKING PRESSURE, 240CFM SCREW ELEMENT FOR DRY FLY ASH HANDLING SYSTEM OF UNIT 3 AND 4.
Dr. MVR RTPP-M12-CAM-Stage1-Procurement of Fenner make V Belts and pulleys for ash compressor, vacuum pumps and motors-reg
PROCUREMENT, INSTALLATION, TRIALS AND COMMISSIONING OF CO2 AND H2 COMPRESSOR REPAIR TEST FACILITY FOR UP-GRADATION OF SAX DEPARTMENT AT ND (V)
Breather valve(Diaphragm) as per M/s. ELGI CP - Part No. 000510060 for M/s. ELGI make Compressor model TRC 1000 MN.
Break-down works and repair works for Collecting electrodes in ESP passes of Unit-1 Boiler as and when required during the year 2019-20
Break down works and repair works for Collecting electrodes in ESP Passes of Unit 1 Boiler as and when required during the year 2020 21
Overhauling of Coal burner assemblies,Coal & Oil firing equipment and servicing of Oil nozzles of Unit-7,Stage-IV Boiler during Annual Overhaul-2020-21.
Annual Maintenance and Repairs to Insulation cladding sheet and Refractory in Unit I Boiler for the year 2018 19 including T and P and consumables
Replacement of IPW and DMW joints in HTR,HTSH and ITSH coils of Unit 1 boiler during annual overhaul period for the year 2019-20.
In-situ Servicing and Repairing of Valves with special purpose In situ machines of Unit 7 boiler during the AOH for the year 2025 26.
Servicing of HMT LatheMachine (Type: NL 26 type .3.0 mtrs M/C No.1057 ) at Work Shop section of Boiler Maintenance Division, Stage-I, Dr.NTTPS
Annual maintenance works Break down and repair works for Dampers and Gates of Unit I Boiler as and when required during the year 2019 20
HIGH SPEED GRINDING MACHINES,PLASMA CUTTING MACHINE AND CHAMFERING MACHINE FOR AOH AND BREAKDOWN WORKS OF BOILER PRESSURE PARTS AND FABRICATION OF COAL NOZZLE TIPS
Supply of BOILER RXA 02 200KGS HR F&A 100 DEGREE C 10.54Kg cm2 g Fuel HSD LDO, S.V.U. Womens Hostel, in S.V. University, Tirupati
Break down works and repair works for Collecting electrodes in ESP passes of Unit 1 Boiler as and when required during the year 2020 21
Fabrication replacement of honey combs in ESP inlet ducts of A B C and D passes of Unit-I boiler during annual overhaul 2023-24
Break-down works and repair works for Collecting electrodes in ESP passes of Unit-1 Boiler as and when required during the year 2022-23
Overhauling of Coal burner assemblies, Coal & Oil firing equipment and servicing of Oil nozzles of Unit-7 Stage-IV Boiler during Annual Overhaul-2025-26
Repairs of flue gas duct at the boiler of Unit 2 including TandP and consumables during the running and annual overhaul period 2022 to 23
Break-down works and repair works for Collecting electrodes in ESP passes of Unit-1 Boiler as and when required during the year 2023-24
In-situ Servicing and Repairing of Valves with special purpose In situ machines of Unit 7 boiler during the AOH for the year 2025 26.
Procurement of radial seals,ceramic fibre blanket and carbon ring for Air Preheater(Model :31.5 VITM 2000,50 deg PA) of 500MW boiler stage- IV/Dr.NTTPS
Replacement of IPW and DMW joints in HTR,HTSH and ITSH coils of Unit 1 boiler during annual overhaul period for the year 2019-20.
Major overhaul of 6.6KV motors of Turbine Boiler and Common auxilliaries of units 3 and 4 as and when required during the year 2023-24
Break-down works and repair works for Collecting electrodes in ESP passes of Unit-2 Boiler as and when required during the year 2022-23