Loading…
Loading…
5,054 results • Best match
Providing assistance at different chutes, Location & transfer points for uninterrupted coal conveyance from wagon tipplers 5 &6 to crushers & crusher to bunkers due to complete wet coal and Providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from M/s MCL, M/s SCCL, M/s ECL and M/s WCL & Coal Clearing on wagon tipplers 5&6 Grid hoppers in Operation Division /CHP/Stage- III&IV /Dr.NTTPS as and when required, during the Period from 01.04.2025 or from the date of Commencement of work to 31.03.2026 or till the exhaust of quantities.
Removal of ash around Coarse Ash Hoppers under ESP Hoppers near ID fans Silos and removal of ash by digging carrying to outside by hand loads using baskets from dry fly ash (i.e. ESP I and II area and canals ID fan canals and area Compressor House area and canals and Vacuum System area and canals) and disposal of the same from Unit-I and Unit-II during the FY 2025-2026
Removal of ash around Coarse Ash Hoppers under ESP Hoppers near ID fans Silos and removal of ash by digging carrying to outside by hand loads using baskets from dry fly ash (i.e. ESP I and II area and canals ID fan canals and area, Compressor House area and canals and Vacuum System area and canals) and disposal of the same from Unit I and Unit II during the FY 2025-2026
IC-II overhauling kit for HP Disc valve of TRC 1000 MN/ UG compressor of M/s Elgi make. Each set consists of 3 items. 1. Sl. No.19 Part No: 000424350, Suction Valve Spring, Qty/Set -- 02 Nos 2. Sl. No. 4 Part No: 000524070, Packing for 60mm Dia Disc valve (Small) , Qty/Set -- 01 No. 3. Sl. No. 3 Part No: 000524060, Packing for 60mm Dia Disc valve (Big), Qty/Set -- 02 Nos.
Providing of patch repairs, carrying out of belt jointing works, edge repairs, relagging of pulleys and belt replacement works for the conveyor systems 1C,1D,3C,BFC,3D,3E,3F,4C,RSFD,6C, UC2 and JT-2 to JT-9 (Except JT-7&JT-8) ,RBF-1, 2&3 , Conveyor -5C, 5D,5E in MMSD-II of CHP/ Dr.MVR RTPP for the period upto 30.09.2026 from the date of issue of LOI
Providing of patch repairs, carrying out of belt jointing works, edge repairs, relagging of pulleys and belt replacement works for the conveyor systems 1C,1D,3C,BFC,3D,3E,3F,4C,RSFD,6C, UC2 and JT-2 to JT-9 (Except JT-7&JT-8) ,RBF-1, 2&3 , Conveyor -5C, 5D,5E in MMSD-II of CHP/ Dr.MVR RTPP for the period upto 30.09.2026 from the date of issue of LOI
Construction of ROB in lieu of LC No.8 at Gunadala at Railway Km.5/6-7 of Vijayawada - Gudivada Section in Krishna District Sub Work Providing men and machinery for Dismanting of structures and removal of debris for stage -1 activites for the construction of ROB in lieu of LC No.8 at Gunadala at Railway Km.5/6-7 of Vijayawada - Gudivada Section in Krishna District
EX.BHEL or EX.NTPC SUPERVISORY SERVICES FOR VARIOUS OVERHAUL WORKS OF SGand ITS AUXILLARIES AND DEPLOYMENT OF EX WRI WELDING EXPERT IN BOILERPASS 1 and 2 DURING BOILER OVERHAUL AT NTPC SIMHADRI.
Repairs of flue gas duct (APH outlet and to ESP inlet) at the boiler of unit- 1 including T@P and consumables during the running and annual overhaul period 2026-27
Repairs of flue gas duct (APH outlet and to ESP inlet) at the boiler of unit-2 including T@P and consumables during the running and annual overhaul period 2026-27
Fabrication of Modified new adjustable coal nozzle tips 26" size with Divider plate Y and Zarrangement for all corners 2&4 and 1&3 of units-5 and 6 Boilers for a period of 6 months from the date of commencement of the work during the year 2026-27.
Transformer oil filtration , replacement of transformer oil of 400KVA, 6.6KV/433V Power Transformer at Stacker Reclamier-I,II,III,IV, Overhaul of 3-Phase, 11KV/415V, 2000KVA Power transformer , overhaul of power transformers at locations of ... yard, conveyor galleries, ...
Replacement of Eroded and defective LTR, ITS, Hanger feed coil tubes, carrying out D-meter survey, erection and dismantling of temporary platforms at bottom ash hopper and wherever necessary, conducting DP test for the welded joints in pressure ... 2 boiler during ...
Replacement of Eroded and defective LTR, ITS and Hanger feed coil tubes,carrying out D-meter survey erection and dismantling of temporary platforms at bottom ash hoper and wherever necessary conducting DP test for the welded joints in pressure parts ... 2 boiler during ...
Fuel Filter Gasket Primary, Fuel Filter Gasket Secondary 100, Compressor HP Gasket 11486302, Bellow Gasket 10170534, Twin Beam Head Light Lamps 24V, Cabin Cooling fans for DLW Locomotives
Sewer inspection machinery (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6810875 Dated : 22-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 16 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SR.HEAD, PURCHASE AND STORES Satish Dhawan Space Centre SHAR, Department of Space, indian space research organization, Department of Space (President Of India Acting Through Sr. Head, Purchase And Stores)
Laying of Insulation wool and Cladding sheet for the flue gas duct, Secondary Air ducts & Primary Air Ducts at various locations of Unit-3/ Stage-II Boiler including T&P and consumables
Custom Bid for Services - 0200155109 - Painting on external surfaces of pipelines, tanks, equipment and metallic structures in UNIT 2 BOILER AND TURBINE AREA Similar Category Operation and Maintenance Power House/Power Plant
Requirement of Solenoid Valves and their Repair Kit for Onshore Gas Terminal HPHT Asset
Hiring of Third-Party Inspection Agency - Oil and Gas, Miscellaneous Products, Machinery & Equipment, As per tender document; As per tender document; As per tender document
Construction of Laboratory for BSL3 Facility and for Model systems in Biology at IISER, Tirupati, Permanent Campus in EPC mode -I (Design and Build Basis) SH: (a) Building portion i/c Internal Water supply, Sanitary installations, External Service ... Air Compressors , ...
M4750016321 - DIAPHRAGM SEAL 0-52-013-01050 12 BHEL, M4750026268 - DIAPH SEAL INBOARD CE CW PAPH RAD SEAL, M4750010408 - OUTBOARD SEAL 4-52-013-00995 BHEL BOILER, M4750026270 - DIAPH SEAL LEAF HE CE PAPH 27VIM RADSEAL, M4750010432 - T-BAR 4-52-013- ... BHEL BOILER 500MW, ... BHEL BOILER , ... BHEL BOILER , ... 3-52-013-00785 BOILER , ... BHEL BOILER , ... BHEL BOILER 500MW, ... BHEL BOILER 500MW, ... BHEL BOILER , ...
Filter Drier, TXV Thermal Expansion Valve, Valve Suction Service 1.125 OD, Ring Piston Compress, Valve Plate Package, Piston, Compressor Oil Synthetic 150 SUNISO 3 GS CAN of 3.78 Litres
Overhauling/Servicing/replacement of various sizes of valves and welding of pin holes at Valves end connection in boilers of Units- 5&6 as and when required and during Annual Overhaul periods for a period of 6 months from the date of commencement of the work during the year 2026-27.
Supervisory Works and Witnessing of Non-Destructive Tests and Any Other Type of Checks Involved in Maintenance Activities and Annual Overhaulsof Boiler and Aux, Turbine and Aux, Off-Site etc at NTPC Simhadri
Overhauling of Coal, Oil & Auxiliary air nozzle shaft assemblies, ignitor air, scanner air hoses, seal tubes, oil gun assemblies & replacement of worn out Coal burners in Unit-3 Boiler during 2026-27 overhaul
Custom Bid for Services - Painting on external surfaces of pipelines, tanks, equipment and metallic structures in UNIT 3 and 4 BOILER and TURBINE AREA Similar Category Operation and Maintenance Power House/Power Plant
MCB, Machinery compartment LED flood light fitting 70W230V AC, Geyser 25 LTR, Limit Switch, Multi Core 1.5 sqmm fire proof cable, loud speaker unit, UPS 3KVA
Replacement of Clutch plate Eicher Vehicle No 14D- 194352X, Replacement of Front Wheel bearing Eicher Vehicle No 14D-194352X, Replacement of Grease Eicher Vehicle No14D-194352X, Replacement of Wiper Blade Eicher Vehicle No 14D-194352X, Replacement of ... of Gear Box oil ... of Gear Box packing ... for Gear box and ... charges Lathe work ...
Desiltation of major drains From Raghavendra Swamy Math to Sharada Peetham, via Kambham Satram, From Godavari Bund at Kambham Satram, crossing the road via Sulabh Complex and up to Rajikula Kalyana Mandapam Sulabh Complex, From Rajikula Kalyana ... (with machinery excavator ...
Replacement of Eroded and defective ECO, LTS, LTR, HTR, HTS, ITS Hanger feed coil tubes,carrying out D-meter survey, erection & dismantling of temporary platforms at bottom ash hoper and wherever necessary, conducting DP test for the welded joints in ... 2 boiler during ...
Replacement of Eroded and defective ECO, LTS, LTR, HTR, HTS, ITS Hanger feed coil tubes,carrying out D-meter survey, erection & dismantling of temporary platforms at bottom ash hoper and wherever necessary, conducting DP test for the welded joints in ... 1 boiler during ...
Replacement of eroded and defective ECO LTS LTR HTR HTS ITS Hanger feed coil tubes carrying out D meter survey erection and dismantling of temporary platforms at bottom ash hopper and wherever necessary conducting DP test for the welded joints in ... unit-1 boiler during ...
Replacement of Eroded and defective ECO LTS LTR HTR HTS ITS Hanger feed coil tubes carrying out D-meter survey erection & dismantling of temporary platforms at bottom ash hoper and wherever necessary conducting DP test for the welded joints in ... 1 boiler during ...
Replacement of gravimetric feeder belts, failed bearings of take-up pulley head pulley inlet span rollers, clean-out conveyor and replacement of damaged coupling halves,studs, bushings of coupling drive studs of main drive and opening and closing of R.C feeder doors and replacement of bearings of weigh span roller, weigh roller with motion monitor and weigh sensing roller of R.C feeders of units-5&6 as and when required for a period of 6 months from the date of commencement of the work during the year 2026-27.
CONTRACT PROPOSAL FOR DEPLOYMENT OF EXPERT EX BHEL FOR ASSISTANCE ININSPECTION OF BOILER and AUXILIARIES INCLUDING HANGERS and SUPPORTSBOILER PRESSURE PARTS QUALITY CHECKS VALVES BURNERS WELDING AND NDTDURING OVERHAULING ACTIVITIES AT NTPC KUDGI STP
Custom Bid for Services - CMC Stack Analyzer in DHDS, Custom Bid for Services - CMC Oxygen Analyzer in CDU I II and CO Boiler, Custom Bid for Services - CMC Stack Analyzer in HRSG III IV
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers & crusher to bunkers due to complete wet coal at different chutes, Location & transfer points and Providing of labour charges for breaking & clearing of heavy size coal boulders and shale in coal rakes received from M/s MCL, M/s SCCL, M/s ECL and M/s WCL & Coal Clearing on wagon tipplers 1 to 4 Grid hoppers in Operation Division/CHP/Stage- I&II/Dr.NTTPS as and when required, during the Period from 01.04.2025 or from the date of Commencement of work to 31.03.2026 or till the exhaust of quantities.
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers & crusher to bunkers due to complete wet coal at different chutes, Location & transfer points and Providing of labour charges for breaking & clearing of heavy size coal boulders and shale in coal rakes received from M/s MCL, M/s SCCL, M/s ECL and M/s WCL & Coal Clearing on wagon tipplers 1 to 4 Grid hoppers in Operation Division/CHP/Stage- I&II/Dr.NTTPS as and when required, during the Period from 01.04.2025 or from the date of Commencement of work to 31.03.2026 or till the exhaust of quantities.
Repair and Replacement of parts of Tata LPT 709 Veh BA No 19 D 209560H Engine Oil, Engine Oil Filter, Diesel Filter Set, Air Filter, Gear Oil, Diff Oil, Coolant, Clutch Plate, Clutch Cover Assy, Clutch Release Bearing, Clutch Pipe, Brake Oil, Front ... for Gear Box Oil ... for Gear Box removing ...
Custom Bid for Services - Appointment of Public Analysts for Sampling and Analysis of Imported Coking Coal, Custom Bid for Services - Appointment of Public Analysts for Sampling and Analysis of PCI Coal and Imported Boiler Coal
General purpose Machinery and Spindle Oils (V2) Conforming to IS 493 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7093357 Dated : 09-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Custom Bid for Services - Schedule A Cost of Manpower Incl ESI EPF Bonus and GST, Custom Bid for Services - Schedule B Cost of Machinery and PPE Incl GST
LG ASSEMBLY, NCO BOILER, CC1000, IBR, LG ASSEMBLY, 16LG304AB, CC980, IBR, LG ASSEMBLY, 14LG5703, CC1750, NON IBR, LG ASSEMBLY, IBH9, 10, CC900, IBR, LG ASSEMBLY, 14X101, 102, CC500, NON IBR, LG ASSEMBLY, 280V01, CC2007, NON IBR
Certain Maintenance works (Break down and Repair works) and Overhauling of PA fans including their lube oil systems and Seal Air fans of Unit-1 Boiler including T&P and consumables during overhaul period 2026-27
Annual general cleaning and maintenance of HT motors, boards and bus ducts of Boiler,Turbine and common auxiliaries of unit 5 & 6 of Stage-3 Dr.NTTPS during the Annual Overhaul period for the year 2026-2027.
Certain Maintenance works (Break down and Repair works) and Overhauling of PA fans including their lube oil systems and Seal Air fans of Unit-2 Boiler including T&P and consumables during overhaul period 2026-27
Replacement of Defective ECo,LTR,LTS, HTS, HTR, ITS hanger feed coil tubes, eroded water wall tubes, fin welding of water wall tubes, metal build up on eroded portions of water wall tubes and coil tubes, providing of carbon steel pads on water wall ... Unit-II boiler during ...
Replacement of eroded and defective ECO,LTS,LTR,HTS,HTR,ITS hanger feed coil tubes eroded water wall tubes,fin welding of water wall tubes,metal build up on eroded portions of water wall tubes and coil tubes , providing of carbon steel pads on water ... unit-1 boiler during ...
Replacement of eroded and defective ECO,LTS,LTR,HTS,HTR,ITS hanger feed coil tubes,eroded water wall tubes,fin welding of water wall tubes,metal buildup on eroded portions of water wall tubes and coil tubes , providing of carbon steel pads on water ... unit-2 boiler during ...