Loading…
Loading…
5,054 results • Best match
Engagement of 1 No. TMX-20 machine on hire basis including machinery hire charges, driver salary, cleaner salary, diesel oil, lubricants, maintenance, transport charges to and fro and all incidental charges etc. as directed by the departmental officers for utilization and clearance of garbage in drains and geddas in Zone-I Area-1 for a period of six months
Engagement of 1 No. TMX-20 machine on hire basis including machinery hire charges, driver salary, cleaner salary, diesel oil, lubricants, maintenance, transport charges to and fro and all incidental charges etc. as directed by the departmental officers for utilization and clearance of garbage in drains and geddas in Zone-I Area-1 for a period of six months
Supply of Dissimilar Material Weld Joint Pieces for Platen SH and LTRHareas of Stage-I Boiler 2X800 MW Units at NTPC Ltd - Darlipali STPP.
Upkeeping of roads and cleaning of drains at areas of Switch Yard , TG Building, Boiler, ESP at Stage-V for the year 2026-27
Procurement of soot blower drain control valve assemblies to be used instage II 3x500 MW and stage 3 1x500MW Boiler units at NTPC KORBA
PLC Siemens trainer, PLC Allen Bradley trainer, Traffic Light control PLC Application Board with casing to carry, Conveyor Belt PLC Application Board with casing to carry
Overhaul of 120 TR open type AC compressor, rewinding and mechanical overhaul of 7.5 TR AC compressor, overhaul of chiller pumps and other miscellaneous works of Unit-3&4 of Stage-II as and when required during the year 2026-27 from the date of commencement to 30.09.2026.
Ball tube Mills Internal AMC works like ,Shifting of screw conveyors, Replacement of (SC) ribbons, Tie rods , chain links, shaft and bearings ... etc, from the date of commencement of work to 30.09.2026 as and when required during year 2026-27
2ND CALL FOR SUPPLY, INSTALLATION, TESTING, TRAIL RUN, AND COMMISSIONING OF MACHINERY AND EQUIPMENT FOR LN GOLDSMITHS FOUNDATION
Supply of HSD and MS Petrol to the Port vehicles equipment and machinery through its authorized retail outlets.
Goods Transport Service – Per KM Based Service - Household/Office, Machinery & Equipment; Closed Body LCV Truck; 14 FT LCV
Hiring of JCB, Hydraulic excavator and Hiring of Tractor for Transportation of boulders, Foreign materials and scrap from JT-2, 3C pent house JT-4, Crusher house, JT-8, JT-9 and JT-11 and also removal of boulders, rocks and MS scrap at Wagon tippler-3 Hoppers, Stacker yard ,RC yard removal coal from bulged wagons and lifting of spilled over coal underneath the WT-3 plat form and lifting f coal in Stacker yard & RC yard in CHP RTPP for the year 2022-23
Hiring of JCB, Hydraulic excavator and Hiring of Tractor for Transportation of boulders, Foreign materials and scrap from JT- 2,3C pent house JT-4, Crusher house, JT-8, JT-9 and JT-11 and also removal of boulders, rocks and MS scrap at Wagon tippler-3 Hoppers, Stacker yard ,RC yard removal coal from bulged wagons and lifting of spilled over coal underneath the WT-3 plat form and lifting f coal in S/R yard & RC yard in CHP/ RTPP for the year 2022-23.
Hiring of JCB, Hydraulic excavator and Hiring of Tractor for Transportation of boulders, Foreign materials and scrap from JT- 2,3C pent house JT-4, Crusher house, JT-8, JT-9 and JT-11 and also removal of boulders, rocks and MS scrap at Wagon tippler-3 Hoppers, Stacker yard ,RC yard removal coal from bulged wagons and lifting of spilled over coal underneath the WT-3 plat form and lifting of coal in S/R yard , RC yard in CHP/ RTPP for the year 2023-24
Compressor oils (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7103684 Dated : 12-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Carrying out miscellaneous shrouding rectification works of SS gratings Erection of temporary platform inside furnace just above gooseneck erection shifting and dismantling of pneumatically operated Sky climbers High pressure Jet cleaning of furnace ... 2 boiler during ...
Carrying out miscellaneous shrouding rectification works of SS gratings Erection of temporary platform inside furnace just above gooseneck erection shifting and dismantling of pneumatically operated Sky climbers High pressure Jet cleaning of furnace ... 2 boiler during ...
Carrying out miscellaneous shrouding, rectification works of SS gratings Erection of temporary platform inside furnace just above gooseneck erection shifting and dismantling of pneumatically operated Sky climbers High pressure Jet cleaning of furnace ... 1 boiler during ...
Dr MVR RTPP Stage I O and M Civil Removal and disposal of ash debris in Stage I Boiler areas for the year 2026 27
Dr MVR RTPP Stage II-O and M Civil Removal and disposal of ash, debris in Stage II Boiler areas for the year 2026 27
Dr MVR RTPP Stage III O and M Civil Removal and disposal of ash, debris in Stage III Boiler areas for the year 2026 27
Wash Point-pump water working pressure 45kg per cm2, Hydraulic Ram, Tyre Removing Machine, Tyre Inflater, CO2 Extinguisher, Air Compressor, Nylon wire bride hose, GI, B Class Pipe, Sliding Jack-Hydraulic Trolley Jack for light and Heavy duty vehicles, Pneumatic Operated Greasing Machine -50 Kg Drum Capacity, Pneumatic Operated Greasing Machine -25 Kg Drum Capacity, Battery Charger, Electric Welding, Gas Welding Set, Puncture Repair Machine, Grinding Machine, Bench Vices-size 10 inch, Digital Insulation Tester-Megger, Wheel Balancing Machine, Battery cell tester, Hydrometer, Tool Box Trolley, Battery Operated Trolley, Vacuum Cleaner, Foot Pump, clamp meter, Portable spray or Jet hot water washer, Installation Testing and Commissioning charges
Replacement of gravimetric feeder belts, failed bearings of takeup pulley, head pulley, inlet span rollers, cleanout conveyor and replacement of damaged coupling halves, studs, bushings for coupling drive studs of main drive and opening and closing of RC feeder doors and replacement of bearings of weigh span roller, weigh span roller with motion monitor and weigh sensing roller of RC feeders of Units-5&6 as and when required during the year 2019-20.
Replacement of gravimetric feeder belts, failed bearings of taken up pulley, head pulley, inlet span rollers, cleanout conveyor and replacement of damaged coupling halves, studs, bushings for coupling drive and opening and closing of RC feeder doors and replacement of bearings of weigh span roller, weigh span roller with motion monitor and weigh sensing roller of RC Feeders of Units-5 and 6 as and when required during the year 2020-21.
Picking of shale, stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-3 &4 of CHP and transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) as and when required during the period from 01-6-2024 or commencement of the work to 30.11.2024 or till the exhaust of quantity.
Replacement of gravimetric feeder belts, failed bearings of take-up pulley head pulley inlet span rollers, clean-out conveyor and replacement of damaged coupling halves,studs, bushings of coupling drive studs of main drive and opening and closing of R.C feeder doors and replacement of bearings of weigh span roller, weigh roller with motion monitor and weigh sensing roller of R.C feeders of units-5&6 as and when required during the year 2025-26.
Replacement of gravimetric feeder belts, failed bearings of taken up pulley, head pulley, inlet span rollers, cleanout conveyor and replacement of damaged coupling halves, studs, bushings for coupling drive and opening and closing of RC feeder doors and replacement of bearings of weigh span roller, weigh span roller with motion monitor and weigh sensing roller of RC Feeders of Units-5 and 6 as and when required during the year 2020-21.
Transformer oil filtration , replacement of transformer oil of 400KVA, 6.6KV/433V Power Transformer at S/R-III,overhaul of power transformers at locations of S/R's-I&II&replacement of failed 433V/415V 3-phase 4-wire power/ lighting ... yard, conveyor galleries, ...
Assets Insurance Service - All Risk Policy, Electronic Equipment Insurance; Standard Fire & Special Perils Cover, MBD (Machinery breakdown) Cover; Mandatory
Desiltation of Major Drains in 19th Divisions by engaging of Machinery and Man power in Ananthapuramu Municipal Corporation, Anantapuramu.
Set of spares for ELGI Make TRC 1000 MN UG Compressor consisting of (1) BOTTOM PLATE to part no: 000415160, Qty-1 no. (2) SUCTION VALVE SPRING to part no: 000415170, Qty-1 no. (3) SUCTION VALVE PLATE to part no: 000415180, Qty-1 no. (4) DELIVERY VALVE PLATE to part no: 000415190, Qty-1 no. (5) DELIVERY VALVE SPRING to part no: 000415200, Qty-1 no.
Removal of ash around Coarse Ash Hoppers under ESP Hoppers near ID fans Silos and removal of ash by digging carrying to outside by hand loads using baskets from dry fly ash canals ESP I and II area canals ID fan canals Compressor House area canals and Vacuum System area canals and disposal of the same from Unit-I and Unit-II during the year 2024-25
U/V Release, Racking Handle S2, Transformer, Cluster contacts for S2500A Naval Application, Boiler heating element, Voltmeter selector switch 10A Position RY- YB-BR- OFF- 48x48m
Attending Running Maintenance and overhauling of soot blowers in boiler of unit-8 stage-V for a period of 06 Months during the year 2026-27
Filter for Coalescing Filter, Filter for Oil Conditioning System, High Pressure Filter-Oil Injection Sys, Lube Oil Filter - Compressor, Lube Oil Filter - Main
Ball Tube Mill External AMC works like Overhauling & replacement of MR/AR gear box, pinion bearings Hot air box feed pipe assembly,and checking /tightening of various types mill bolts.. etc of unit-3&4/stage.II for the period of six months , as and when required during the year 2026-27 from the date of commencement of work to 30.09.2026.
Ball tube mill externalAMC works like overhauling and replacement of MR/AR gear box,pinion bearings,Hot air box,feed pipe assembly and checking /tighting of various types mill bolts etc of units 3&4 stage-II for the period of six months as and when required during the year 2026-27fromt the date of commencement of work to 30.09.2026.
3 in one De-stoner grader with aspirator (Q3)
ITEM 1, ITEM 2, ITEM 3, ITEM 4, ITEM 5, ITEM 6, ITEM 7, ITEM 8, ITEM 9, ITEM 10, ITEM 11, ITEM 12, ITEM 13, ITEM 14, ITEM 15, ITEM 16, ITEM 17, ITEM 18, ITEM 19, ITEM 20, ITEM 21, ITEM 22, ITEM 23, ITEM 24, ITEM 25, ITEM 26, ITEM 27, ITEM 28, ITEM 29, ITEM 30 MULTIPLAY SYSTEM - Area: 70 x 44 x 12 ft. Capacity – 10-12 people. Product Size: 7700*10800*6600cm Material: heavy duty Galvanized steel pipes A class It should be made of high-quality PE material and has undergone strict processing, which has good durability and safety. Metal parts duly powder coated. There should be climbing device attached to the top of the slide, so that children can exercise their physical fitness and coordination ability through climbing, and it can also enhance children's self-confidence during the climbing process. The slide also should have a certain anti-UV function, which can be used for a long time in an outdoor environment without loss. Warranty -5 years for plastic parts, 7 years for metal parts., Heavy-Duty U swing 2 Seater - Galvanized Steel Pipe, Color Powder Coated Size:300*130*200 CM Capacity:2 Volume – 0.8 CBM Play Area – 16*7 ft. Capacity - 250 Kg, Chaos Climber – As per standard EN1176, EN177 for athletic activity. Balanced horizontally, ground support and suspended foot cleats. Base structure to be designed accordingly for at least 10-12 persons. Play Area – 15*14 ft. Assembly – 11.5 x10.5, with side ladders giving easy to climb in between., Metro Climber – Measurements : 3000*2700*3200mm Materials - Plastic parts : UV Resistance LLDPE, Posts parts: Galvanized steel pipe Certification - ISO 14001, ISO18000, ISO9001
Rice Transplanter (Q3) (3 (3 ))
Tractors (V1) (Q2) (3 (3 ))
20 ton Digital Weighing Bridge Including Civil Work - 01 set
Tractors (V1) (Q2) (3 (3 ))
Tractors (V1) (Q2) (3 (3 ))
Tractors (V1) (Q2) (3 (3 ))
Tractor Operated Aero Blast Sprayer (Q3) (3 (3 ))
Tractors (V1) (Q2) (3 (3 ))
Tractors (V1) (Q2) (3 (3 ))
Drone Simulator With Controller
Tractor Operated Boom Sprayer (Q3) (3 (3 ))