Loading…
Loading…
5,054 results • Best match
Conversion kit for M/s. ELGI make compressor model RR20100 to RR20100CG(M) of 3-phase locos as per M/s. ELGI part no. 072491069 consisting of 29 items, total 94 nos. and also clamp assembly kit as per M/s. ELGI part no. 072492799 consisting of 07 items, total 11 nos. mentioned overleaf.
Replacement of Eroded and defective Economizer, LTSH, Reheater coils, SH Hanger Tubes and SH side wall tubes, lowering/lifting of the coils, carrying out D-meter survey, providing of C.S pads on water wall tubes, erection & dismantling of temporary ... Unit-4 Boiler during ...
Replacement of Eroded and defective Economizer, LTSH, Reheater coils, SH Hanger tubes and SH side Wall tubes, lowering/lifting of the coils, carrying out D-meter survey, providing of C.S pads on water wall tubes, erection & dismantling of temporary ... Unit-4 boiler during ...
Replacement of Eroded and defective ECO LTS LTR HTS HTR ITS Hanger feed coil tubes carrying out D-meter survey erection & dismantling of temporary platforms at bottom ash hoper and wherever necessary conducting DP test for the welded joints in ... 2 boiler during ...
Replacement of Eroded and defective Economizer, LTSH, Reheater coils, SH Hanger Tubes and SH side wall tubes, lowering/lifting of the coils, carrying out D-meter survey, providing of C.S pads on water wall tubes, erection & dismantling of temporary ... Unit-3 boiler during ...
Lifting and Re erection of badly damaged and bent collecting electrodes, fabrication and erection of new supporting angles, cleat angles in ESP-A pass of any field of Unit-1 boiler welding of U guides and carrying of alignment of collecting electrodes to maintain gap between collecting electrodes include all T&P and consumables for during the overhaul 2025-26
Lifting and Re erection of badly damaged and bent collecting electrodes, fabrication and erection of new supporting angles, cleat angles in ESP C&D pass of any field of Unit- 1 boiler , welding of U guides and carrying of alignment of collecting electrodes to maintain gap between collecting electrodes include all T&P and consumables for during the overhaul 2025-26
Replacement of Eroded and defective ECO LTS LTR HTS HTR ITS Hanger feed coil tubes carrying out D-meter survey erection & dismantling of temporary platforms at bottom ash hoper and wherever necessary conducting DP test for the welded joints in ... 2 boiler during ...
Replacement of eroded and defective economizer, LTSH, Reheater coils, SH Hanger tubes and SH side wall tubes, lowering/lifting of the coils, carrying out D-meter survey, providing of C.S pads on water wall tubes, erection & dismantling of temporary ... Unit-3 boiler during ...
Lifting and Re erection of badly damaged and bent collecting electrodes, fabrication and erection of new supporting angles, cleat angles in ESP-C&D pass of any field of Unit-1 boiler , welding of U guides and carrying of alignment of collecting electrodes to maintain gap between collecting electrodes include all T&P and consumables for during the overhaul 2024-25
Cutting and welding of MS plates to the PF bends/Lines on eroded portion & erection and removal of scaffolding in PF Lines,Repair,Reconditioning and ceramic tiles replacement of damaged PF bends of PF lines of unit-3&4 Boiler for a period of 6 months from the date of commencement of work as and when required during the year 2026-27.
Replacement of eroded coal compartment or Coal nozzles and its tips by reconditioned coal nozzles and tips and servicing of oil nozzles, air nozzles and SADC dampers of Boiler AND Dismantling & assembling of fuel inlet bends of Unit-6 /Stage-IV during overhaul works 2023-24 AND Dismantling , assembling of fuel inlet bends of Unit-6 Stage-IV during overhaul works 2023-24
Lifting and Re erection of badly damaged and bent collecting electrodes, fabrication and erection of new supporting angles, cleat angles in ESP-A pass of any field of Unit-1 boiler welding of U guides and carrying of alignment of collecting electrodes to maintain gap between collecting electrodes include all T&P and consumables for during the overhaul 2025-26
Lifting and Re erection of badly damaged and bent collecting electrodes, fabrication and erection of new supporting angles, cleat angles in ESP #C&D pass of any field of Unit -2 boiler, welding of U guides and carrying of alignment of collecting electrodes to maintain gap between collecting electrodes include all T&P and consumables for during the overhaul 2026-27
Lifting and Re erection of badly damaged and bent collecting electrodes, fabrication and erection of new supporting angles, cleat angles in ESP #A&B pass of any field of Unit -2 boiler, welding of U guides and carrying of alignment of collecting electrodes to maintain gap between collecting electrodes include all T&P and consumables for during the overhaul 2026-27
Lifting and Re erection of badly damaged and bent collecting electrodes, fabrication and erection of new supporting angles, cleat angles in ESP C&D pass of any field of Unit- 1 boiler , welding of U guides and carrying of alignment of collecting electrodes to maintain gap between collecting electrodes include all T&P and consumables for during the overhaul 2025-26
Replacement of eroded and defective economizer, LTSH, Reheater coils, SH hanger tubes and SH side wall tubes, lowering/lifting of the coils, carrying out D-meter survey, providing of C.S pads on water wall tubes, erection & dismantling of temporary ... Unit-3 boiler during ...
Replacement of eroded and defective economizer, LTSH, Reheater coils, SH hanger tubes and SH side wall tubes, lowering/lifting of the coils, carrying out D-meter survey, providing of C.S pads on water wall tubes, erection & dismantling of temporary ... Unit-4 boiler during ...
Lifting and Re erection of badly damaged and bent collecting electrodes, fabrication and erection of new supporting angles, cleat angles in ESP-C&D pass of any field of Unit-1 boiler , welding of U guides and carrying of alignment of collecting electrodes to maintain gap between collecting electrodes include all T&P and consumables for during the overhaul 2024-25
Custom Bid for Services - SW1 Cost of Mechanized cleaning activity inclusive of Cost of Manpower wages EPF ESI provision of Uniform protective wear Machinery on lease Cleaning materials Consumables Implements etc inclusive of GST 18 percentage, Custom Bid for Services - SW2 Cost of Electrical consumption charges, Custom Bid for Services - SW3 Bonus provision Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based Cleaning, Sanitation and Disinfection Service - Outcome Based Cleaning, Sanitation and Disinfection Service - Outcome Based
Sewerage Collection and conveyance system in Pendurthi Area including construction and commissioning of Waste Water Treatment Plant and Teritiary Treatment of output capacity of 46 MLD on open technology which can meet the desired water quality ... pumping machinery and ...
Sewerage Collection and Covneyance System in Pendurthi area including Construction and Commissioning of Waste Water Treatment Plant and Teritary Treatment of output capacity of 46 MLD on Open Technology which can meet the desired water quality ... pumping machinery and ...
Sri.V.V.S.S.Devasthanam-Annavaram-The plastic material i.e. plastic water bottles, plastic cool drink bottles, plastic glasses, plastic covers etc. collected daily from the Sanitation Department as per the schedule below shall be crushed by the ... the machinery provided ...
Sewerage Collection and Covneyance System in Pendurthi area including Construction and Commissioning of Waste Water Treatment Plant and Teritary Treatment of output capacity of 46 MLD on Open Technology which can meet the desired water quality ... pumping machinery and ...
Ball tube mills rectification works comprising of screw conveyor conditioning, replacement of tie rods, seal air gaskets, bearings etc., & External works, Replacement/Overhaul of defective Reducer gear boxes, Lub oil pumps, coolers etc., checking of backlash in drive group including alignment if necessary and changing of grease in HS, LS coupling & pinion bearings in Units-5 and 6 as and when required during the year 2020-21.
Picking of shale, stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-3 &4 of CHP and transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) as and when required during the period from 01-01-2025 or commencement of the work to 31.03.2025.
Desilting of wet silt from existing Manholes, Internal plastering of damaged manholes and Raising of existing manholes at various locations of Thomson street, Ambusaranga street, Padmanagar, Conveyor belt, Feery road, Chilakapeta, Vada veedi, Kota veedi, Woodyard street, Nalla vari veedi and Kurpamarket main road under AE-12 Section in ward no.39, Zone-4, GVMC. (THIS WORK RESERVED FOR SC/ST WADERA/SAGARA (UPPARA) SOCITIES ONLY )
Picking of shale, stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-1 &2 of CHP and transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) as and when required during the period from 01.04.2022 to 30.09.2022 or till the exhaust of quantity.
Ball tube Mills Internal Rectification works comprising of Screw conveyor conditioning, replacement of tie Rods, Seal air gaskets, bearings etc., & External works : Replacement / Overhaul of defective Reducer Gear boxes, Lub oil Pumps, coolers., etc ,checking of backlash in drive group including alignment if necessary and Changing of grease in HS,LS Couplings & Pinion Bearings in Units-5&6 as and when required during the year 2025-26.
Orion 331 R of M/s Oriental chemicals or VC-601 of M/s Vinni chemicals Cleaning Compound for all Ferrous Components like cylinder heads, Exhaust & inlet valves of cylinder heads, compressor valves , nozzles tips etc of RDSO Specn. No. MP.0.8000.02 (Rev.-00) August -08, to RDSO Report no. MP.MI-15 (REV.13) May 2023 Page13
Set of spares for Auxiliary compressor MCPA, model no. CRC 150 & ICRC 150 of M/s. Elgi make. Set consisting of 02 items as follows. 1) Brush holder LH as per M/s. Elgi part no. 3NBD302000. Qty/set. = 01 no. 2) Brush holder RH as per M/s. Elgi part no. 3NBD302100. Qty/set. = 01 no.
AIR FILTER -FLTR001, OIL FILTER -FLTR002., OIL SEPERATOR -FLTR003, PRE FILTER -MIS000031., COMPRESSOR OIL COLAIR M 20 LTR, COMPRESSOR OIL COLAIR M 5 LTR, CARTRIDGE OF LINE FILTER CCF 264., CARTRIDGE OF LINE FILTER CPF 264., CARTRIDGE OF LINE FILTER CAF 264.
Reconditioning of coal nozzle castings and coal nozzle tips for Unit-3 and 4 Boiler, required for 2026-27 annual overhaul
Providing shed for ETP Effluent treatment plant machinery for ghee plant at SV Gosamrakshna sala Tirupati
Air Compressor for Tirupathi ASF, Multi Gas Detector for Hubli ASF, Multi Gas Detector for Vidyanagar ASF, FLP Air Compressor for Hubli ASF, SCBA Cylinder for Visakh ASF, Digital Conductivity Meter for Vijayawada ASF, FLP Enclosures for Visakh ASF, NAS Storage Server for Visakh ASF, Sply and Installation of 8 Channel DVR at Kurnool ASF, Sply and Installation of 2.4MP dome camera at Kurnool ASF, Sply and Installation of 2.4MP HD Bullet camera at Kurnool ASF, Sply and Installation of 8 Channel SMPS at Kurnool ASF, Sply and Installation of 1 TB Hard Disk Drive at Kurnool ASF, Sply and Installation of 4U Rack at Kurnool ASF, Sply and Installation of Cat6 CC Camera Cable at Kurnool ASF, Sply and Installation of 32 Inch LED Monitor at Kurnool ASF, Sply and Installation of Junction Box at Kurnool ASF, Sply and Installation of Video Bellon at Kurnool ASF, Supply of Revolving Charis to Hyderabad ASF, Supply of Office Table to Hyderabad ASF, Supply of File Cabinet to Hyderabad ASF, Supply of 1.5 Ton 5 Star AC to Tirupathi ASF, Supply of Positive Displacement Flow Meter to Rajahmundry ASF, Supply and Installation of Porta Cabin for Rajahmundry ASF, Supply and Installation of Security Cabin for Kunrool ASF
The works related to Stage-IV viz collection preparation and sampling of bunker coal collection of pulverized coal collection of Boiler Steam and DM plant streaming samples mixing of DM plant chemicals and collection of Bottom ash and Fly ash samples for laboratory analysis purpose as per IS method and plant standard operating procedures of analysis for the FY 2023-2024 from 01.04.2023 to 31.03.2024.
The works related to Stage-IV viz., collection, preparation and sampling of bunker coal collection of pulverized coal, collection of Boiler, Steam and DM plant streaming samples, mixing of DM plant chemicals and collection of Bottom ash & Fly ash samples for laboratory analysis purpose as per IS method and plant standard operating procedures of analysis for the FY 2023-2024 from 01.04.2023 to 31.03.2024
The works related to Stage-IV viz., collection, preparation and sampling of bunker coal collection of pulverized coal, collection of Boiler, Steam and DM plant streaming samples, mixing of DM plant chemicals and collection of Bottom ash and Fly ash samples for laboratory analysis purpose as per IS method and plant standard operating procedures of analysis for the FY 2023-2024 from 01.04.2023 to 31.03.2024
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Machine Workshop; Installation of heavy workshop machines Lathe Milling and Band saw machines and preparation of workshop floor for safe operation of machines at BARC Vi..
Picking of shale, stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-1 &2 of CHP and transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) as and when required during the period from 01-04-2021 to 30-09-2021 or till the exhaust of quantity.
Picking of shale, stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-1 &2 of CHP and transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) as and when required during the period from 01-10-2020 to 31-03-2021 or till the exhaust of quantity.
Picking of shale, stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-1 &2 of CHP and transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) as and when required during the period from 01-4-2024 to 31-03-2025 or till the exhaust of quantity
Picking of shale, stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-1 &2 of CHP and transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) as and when required during the period from 01-4-2024 to 31-03-2025 or till the exhaust of quantity
Ball tube Mills Internal Rectification works comprising of Screw conveyor conditioning, replacement of tie Rods, Seal air gaskets, bearings etc., External works Replacement / Overhaul of defective Reducer Gear boxes, Lub oil Pumps, coolers., etc ,checking of backlash in drive group including alignment if necessary and Changing of grease in HS, LS Couplings and Pinion Bearings in Units-5 and 6 as and when required during the year 2023-24
Picking of shale, stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-1 &2 of CHP and transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) as and when required during the period from 01-10-2022 to 31-03-2023 or till the exhaust of quantity.
Picking of shale, stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-1 &2 of CHP and transport of shale to Dump yard within the premises of CHP (distance 0 to 5 KM) as and when required during the period from 01-10-2021 to 31-03-2022 or till the exhaust of quantity.
HYDRAULIC HACK SAW (Q3), 01 IN NO PLASMA & OXY- ACETYLENE FLAME CNC PLATE CUTTING MACHINE WITH MOTOR DRIVER & COMPRESSOR (Q3)
Providing of 41 No's contractors workmen to assist in Trouble shooting round the clock, Upkeeping, Routine, Preventive and minor breakdown works of Common Auxiliaries equipment and equipment in WTP, ETP,STP,Raw water pump house, Cranes in above ... system, Compressor air ...
Set of gasket for Aux.Compressor-CRC-150, One set consisting of (1) Gasket Cylinder to valve flat 00041152C-01No (2) Gasket Crank Case to Motor 000411630-01 No (3) Gasket Cylinder Head to valve flat 00041153C-01 No (4) Gasket Crank Case To Cylinder ... aux. compressor 000420350-01
Set of Gaskets for 100 dia Disc valve of model RR20100 CG/M compressor of M/s. ELGI make consisting of 02 items as follows. 1) Gasket big DV dia 100 as per M/s. ELGI part no. 000519210. Qty/set. = 02 nos./set 2) Gasket small DV dia 100 as per M/s. ELGI part no. 000519220. Qty/set. = 01 no./set