Loading…
Loading…
5,054 results • Best match
SCHEDULE-11 (TOOLS, MACHINERY AND EQUIPMENT FOR ELECTRICAL TRADE) (Q3)
48H ELEC CAROUSEL, ELE LEAK DETECTOR, O RING LEAK DETECTOR, DESIGN AND SPLY CONVEYOR, V MERGER CHAIN CONVEYOR, MERGER POINT AUTOMATION, INST AND COMM WORKS, AMC 1st YR BEYOND DLP, AMC 2nd YR BEYOND DLP, AMC 3rd YR BEYOND DLP
Laying and jointing of the Steel pipe conveyor belts of ECCS for the financial year 2026-27
Replacement of IPW joints, DMW joints, attachment welds in HTRH, HTSH and ITSH coils of units-3&4 boilers during annual overhaul period for the year 2026-27.
Break down and Repair Works Estimate for Belt Replacement, Belt Joint and pulley lagging for the conveyors in Coal Handling plant/Unit#3 during the financial year 2026-27
REMOVAL OF WET SILT USING MACHINERY AT PANDURANGA MAIN ROAD, PATTABHI SEETHA RAMA NAGAR MAIN ROAD, HANUMAN NAGAR BACK SIDE OF ID HOSPITAL, SEETHAIAH DONKA ROAD, MADHURA NAGAR OPP. ID HOSPITAL PRASANTHI NAGAR 1ST LINE IN GORANTLA IN DIV.NO.57 UNDER AE-1 SECTION.
Engaging of Machinery (EX 70 & EX 200 Chain Mounted) for a period of 3 months (10 days for every month) for removal of floated material & silt and Providing Transportation for disposal of removed material from the site at Gangulagedda in ward no. 29. (2nd Call)
Allotment of Ex. ESSAR Land including Plant and Machinery on long term lease annual lease rental basis of 30 years without renewal option on as is where is basis in Zone - Z-4 Plot 148.38 Acres at Port area for Industrial Purpose 2nd call
2026-HOR01-GN-126- Engagement of one No:5.50 Cum capacity tipper on hire basis along with telescopic pole pruner, chain saw, semiskilled labour and other machinery for pruning, cutting. loading , unloading and lifting of tree braches /tree waste in GAJUWAKA for 04 months.
Replacement of IPW/DMW joints and attachments(in HTR&HTS coils) and tubes necessary including HP welding in the areas like a)Economiser b)LTR c)LTS d)HTS e)ITS f)HTR and g)Hanger platen coils of Units-5&6 Boiler during annual overhaul period for the year 2019-20.
Replacement of eroded water wall tubes fin welding of water wall tubes metal build up on eroded portions of water wall tubes and coil tubes providing of carbon steel pads on water wall tubes and rectification of burner bottoms & tops of Unit 2 boiler during annual overhaul period for the year 2018-19
Replacement of eroded water wall tubes fin welding of water wall tubes metal build up on eroded portions of water wall tubes and coil tubes providing of carbon steel pads on water wall tubes and rectification of burner bottoms & tops of Unit 1 boiler during annual overhaul period for the year 2018-19
Replacement of IPW/DMW joints and attachments(in HTR&HTS coils) and tubes necessary including HP welding in the areas like a)Economiser b)LTR c)LTS d)HTS e)ITS f)HTR and g)Hanger plten coils of Units-5&6 boiler during annual overhaul period for the year 2016-17.
Replacement of IPW/DMW joints and attachments(in HTR&HTS coils) and tubes necessary including HP welding in the areas like a)Economiser, b)LTR, c)LTS, d)HTS, e)ITS, f)HTR and g)Hanger platen coils of Units-5&6 Boiler during annual overhaul period for the year 2018-19.
Commissioning of LDO piping up to Unit-3 Boiler fuel station includes Steam flushing of piping and overhauling of all connected equipment of Fuel Oil Pressurizing Pump House (FOPH) at Stage-2 & erection, fabrication of damaged roof sheet and painting of LDO Day Tank at Stage-2 including all paints & other consumables.
Replacement of eroded and defective Economizer, LTSH, Reheater Coils, SH Hanger Tubes and SH side wall tubes, lowering/lifting of the coils, carrying out D-meter survey, erection & dismantling of temporary platforms and carrying out DP test on welded ... Unit-4 Boiler during ...
Carrying out Erection of temporary platform inside furnace just above gooseneck, erection, shifting and dismantling of pneumatically operated Sky climbers, High pressure Jet cleaning of furnace water wall tubes,Opening of inlet coil seal boxes and ... Unit-2 boiler during ...
Removal and replacement of rotor shaft bearing assembly of ID fan 2A with spare assembly ( overhauled at M/S BHEL Ranipet) fixing of all blades and complete alignment of fan and motor for ID fan 2A of Unit 2 boiler with all T&P and consumables including removal and refixing all insulation works
Break-down and running maintenance works for screwing of existing insulation sheets, repairs to Insulation & Cladding sheet for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas) as and when required during the ... Stage-II Boiler including ...
Replacement of eroded water wall tubes fin welding of water wall tubes metal build up on eroded portions of water wall tubes and coil tubes providing of carbon steel pads on water wall tubes and rectification of burner bottoms & tops of Unit 1 boiler during annual overhaul period for the year 2021-22
Patch welding at all classifier pipes including bends at various corners covering the areas from mills to main boiler at all four corners and replacement of damaged victaulic/dresser couplings and gaskets for pulverized fuel lines in Unit-6 of Stage-IV/Dr.MVR RTPP as and when required during the year 2025-26.
Break-down and running maintenance works for screwing of existing insulation sheets, repairs to Insulation & Cladding sheet for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas) as and when required during the ... Stage-II Boiler including ...
SS PLATES RACK, MENU STAND A4 SIZE, BAMBOO KITCHEN ORGANIZER, 40 DISPLAY UNIT, ELECTRIC WATER BOILER
SUPPLY OF BOILER FILL PUMP FOR REGULAR AND BREAKDOWN MAINTENANCE OF THE EQUIPMENT IN SD-III
Running Maintenance and overhauling of Valves in Unit-3/ Stage-II Boiler during 2026-27 overhaul
Rectifications of lighting circuits at higher elevations, maintenance of welding TB circuits of boiler 5&6 all floors, ESPs, TG floor, '0' meters, '5' meters elevation, Tranformer yard and compressor house , Annual Up keeping of Switch gear rooms and cable galleries,soot blowers of Unit 5 & 6, as and when required during the year of 2026-27.
Works Contract SINGLE STAGE POST OPERATIONAL CHEMICAL CLEANING OF ONE 500MW BHEL BOILERWATER CIRCUIT DURING OVERHAULING IN FY 2024 25 AT NTPC Simhadri
Up keeping and accumulated coal dust cleaning external and internal parts of electrical equipment and accessories such as HT and LT switchgear and motors, lighting fixtures, cable trays along the conveyors , lighting in under/over elevation of Marshaling yard and stacker/reclaimers , BOBR including jungle cutting at yard lighting towers , crushed yard towers and BHEL shed area in EM/CHP/Dr.NTTPS , during the period from 01-04-2019 to 31-03-2020 for the year 2019-20
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ONBOARD INS JALASHWA; OPERATIONALISATIION OF THREADING MECHANISM AND ALIGNMENT OF CHUCK CENTRIC MECHANISM OF LATHE MACHINE; Service Provider
Repairs to primary air, secondary air, flue gas ducts(APH outlet to ESP inlet) of Units 3&4 boilers during the annual overhaul period for the year 2026-27.
Replacement of failed RC feeder belts, failed bearings of take up pulley, head pulley, weigh span rollers, removing of coal on feeder conveyor belt, overhauling of feeder and bunker outlet gates and patch welding of PF Lines, Feeder outlet chutes, Replacement of defective Feeder Main drive & COC Drive Gear boxes as and when required during the year 2025-26
Providing of patch repairs and carrying out of belt jointing works, edge repairs, relagging of pulleys, belt dragging and belt replacement works for the conveyor systems from JT-5 to JT-9 and JT-9 to Bunker house in MMSD-III/CHP/Dr MVR RTPP for the period upto 30.09.2026 from the date of issue of LOI.
Classifiers Cleaning of Ball tube Mills ; including Fabrication & Welding of SS plates [10 mm thick] to RC feed pipes, transition pieces - MS plates [12 mm thick] to PF ducts, coal reject lines, conveyor body etc., and Replacement of Packing ropes at various expansion joints of Units-5&6 Mills as & when required during the year 2024-25.
Procurement of 8Nos various outdoor VCB spares suitable for various makes of VCBs 1)Spring Charging Motor with Bridge Rectifier 2) Spring Charge motor with gearbox ERL/ Stelmec/CGL Delco Motor 3) Big Cam with Main shaft with bearings with gunmetal material 4) Closing Latch Assembly (System control, Megawin, BHEL) 5) Remote/Local Switch 6) Master trip Relay 2 NO &2 NC 7) Alstom Ratchet wheel Assembly and SS pin with gun metal 8) Anti-Pumping & Timer Circuit
Dismantling and shifting of screw conveyor inside the mill, re erection including tie rods, screw conveyor bearing housing and stuffing box, replacement of eroded feed pipe, mixing box and transition piece with new spares, replacement of screw ... screw conveyor removable ...
Service Contract for Online Safety Valve Pressure Setting by Trevi Test during Boiler Overhauls at NTPC Simhadri
Running Maintenance and overhauling of Soot blowers in Unit-3/Stage-II Boiler during 2026-27 overhaul
Rectification of tube leaks in Unit-3/Stage-II Boiler for the period 01.04.2026 to 31.03. 2027
Break-down and running maintenance works for screwing of existing insulation sheets, repairs to Insulation & Cladding sheet for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas) as and when required during the ... Stage-II Boiler including ...
Upkeeping of Mills at higher elevation i.e., cleaning and clearing of coal rejects , dust at dynamic classifier area and Mills Bay area and lube oil pumps area and to attend Lube oil pumps servicing, replacement works and for maintenance of Lube oil ... of Boiler Mills ...
Break-down and running maintenance works for screwing of existing insulation sheets, repairs to Insulation & Cladding sheet for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas) as and when required during the ... Stage-II Boiler including ...
Replacement of eroded water wall tubes fin welding of water wall tubes metal build up on eroded portions of water wall tubes and coil tubes providing of carbon steel pads on water wall tubes and rectification of burner bottoms and tops of Unit 2 ... 2 boiler during ...
Replacement of eroded and defective Economizer, LTSH, Reheater coils, SH Hanger Tubes and SH side wall tubes, lowering/lifting of the coils, carrying out D-meter survey, erection and dismantling of temporary platforms and carrying out DP test on ... Unit-4 boiler during ...
Lifting and Re erection of badly damaged and bent collecting electrodes, fabrication and erection of new supporting angles, cleat angles in ESP -C pass of 2C22 complete field of Unit 2 boiler , welding of U guides and carrying of alignment of collecting electrodes to maintain gap between collecting electrodes include all T&P and consumables
Replacement of eroded water wall tubes fin welding of water wall tubes metal build up on eroded portions of water wall tubes and coil tubes providing of carbon steel pads on water wall tubes and rectification of burner bottoms and tops of Unit 2 ... 2 boiler during ...
Replacement of Eroded and defective Economizer, LTSH, PSH, Re heater coils, SH Hanger Tubes and SH side wall tubes, lowering/lifting of the coils, carrying out D-meter survey erection & dismantling of temporary platforms and carrying out DP test on ... Unit-5 boiler during ...
Upkeeping of Mills at higher elevation i.e., cleaning and clearing of coal rejects , dust at dynamic classifier area and Mills Bay area and lube oil pumps area and to attend Lube oil pumps servicing, replacement works and for maintenance of Lube oil ... of Boiler Mills ...
Replacement of eroded and defective Economizer, LTSH, Reheater coils, SH Hanger Tubes and SH side wall tubes, lowering/lifting of the coils, carrying out D-meter survey, erection and dismantling of temporary platforms and carrying out DP test on ... Unit-3 boiler during ...
Replacement of eroded and defective Economizer, LTSH, Reheater Coils, SH Hanger Tubes and SH side wall tubes, lowering/lifting of the coils, carrying out D-meter survey, erection and dismantling of temporary platforms and carrying out DP test on ... Unit-3 Boiler during ...
Replacement of eroded and defective Economizer, LTSH, Reheater coils, SH Hanger Tubes and SH side wall tubes, lowering/lifting of the coils, carrying out D-meter survey, erection and dismantling of temporary platforms and carrying out DP test on ... Unit-3 boiler during ...