Loading…
Loading…
5,054 results • Best match
Custom Bid for Services - Refurbishment of DGS-74K001, Custom Bid for Services - Refurbishment of DGS-75K051-LP, Custom Bid for Services - Refurbishment of DGS-75K051-HP, Custom Bid for Services - Refurbishment of DGS-90K001, Custom Bid for Services ... Gas Compressor Station ... Gas Compressor Station ... Gas Compressor Station ... Gas Compressor Station ... Gas Compressor Station ... Gas Compressor Station
Replacement, laying and vulcanization of SBC-2 New Conveyor belt at NALCO Port Facilities Visakhapatnam
Custom Bid for Services - Refurbishment, Dry Gas seal, OTBS, 4K51, TBS, 4K51 Similar Category Operation And Maintenance Of Gas Compressor Station Operation And Maintenance Of Gas Compressor Station
Supply of Fin Bars and Erosion shield and Clamps for BoilerPressure parts
Carrying out miscellaneous shrouding, Erection of temporary platform inside furnace just above gooseneck, erection, shifting and dismantling of pneumatically operated Sky climbers, High pressure Jet cleaning of furnace water wall tubes and ... 1 boiler during ...
Carrying out miscellaneous shrouding, Erection of temporary platform inside furnace just above gooseneck, erection, shifting and dismantling of pneumatically operated Sky climbers, High pressure Jet cleaning of furnace water wall tubes and ... 2 boiler during ...
Replacement of IPW/DMW joints and attachments(in HTR&HTS coils) and tubes necessary in the areas like a)Economiser, b)LTR, c)LTS, d)HTS, e)ITS, f)HTR and g)Hanger platen coils of Units-5&6 Boiler during annual overhaul period for the year 2017-18.
Carrying out Cleaning and Inspection of Erosion protection shields of BP front wall, RH front and rear coil Assy. LTSH, Economizer, Cassette baffles of LTSH & Economizer, Alignment bands and Mechanical spacer bars of LTSH and adjustment and fixing ... of Boiler / ...
Replacement of Worn out Grinding rolls Bull ring segments Vane wheel assembly Bull ring clamping ring Bowl extension ring and other connected mill internals and other repair works for Mill 1A and 1D of Unit I Boiler with necessary T and P and consumables during the FY 2018 19
Procurement of cold end sector grating assemblies with support blocks and hot end sector plate complete assembly including static seal assembly and adjustor rod and pipe assembly(Primary air to Flue gas side and secondary air to Flue gas side) of Air ... 500MW boiler stage-IV/Dr.NTTPS
Removal & re-fixing of aluminum insulation sheeting on water wall tubes around soot blowers and burner panels, hot venturi ducting of mills, Hot air bus ducts, Inter connecting duct over APH and ID fan to Chimney areas of Boiler in unit-7 during Annual/Capital overhaul period 2021-22.
Carrying out, Cleaning and Inspection of Erosion protection shields of BP front wall, RH front and rear coil Assy. LTSH, Economizer, Cassette baffles of LTSH & Economizer, Alignment bands and Mechanical spacer bars of LTSH and adjustment and fixing ... of Boiler / ...
Carrying out Cleaning and Inspection of Erosion protection shields of BP front wall, RH front and rear coil Assy. LTSH, Economizer, Cassette baffles of LTSH & Economizer, Alignment bands and Mechanical spacer bars of LTSH and adjustment and fixing ... of Boiler / ...
Fabrication of New Adjustable Coal Nozzle tips "26"size with divider "Y" and "Z" arrangement for all corners 2&4 and 1&3 of unit 3&4 boiler for a period of 6 months from the date of commencement of work as and when required during the year2026-27.
Removal & re-fixing of aluminum insulation sheeting on water wall tubes around soot blowers and burner panels, hot venturi ducting of mills, Hot air bus ducts, Inter connecting duct over APH and ID fan to Chimney areas of Boiler in unit-7 during Annual overhaul period 20232-24.
Procurement of cold end sector grating assemblies with support blocks and hot end sector plate complete assembly including static seal assembly and adjustor rod and pipe assembly(Primary air to Flue gas side and secondary air to Flue gas side) of Air ... 500MW boiler stage-IV/Dr.NTTPS
Removal & re-fixing of aluminum insulation sheeting on water wall tubes around soot blowers and burner panels, hot venturi ducting of mills, Hot air bus ducts, Inter connecting duct over APH and ID fan to Chimney areas of Boiler in unit-7 during Annual overhaul period 2025-26
Cutting and welding of MS plates to the PF bends/Lines on eroded portion and erection and removal of scaffolding in PF Lines, Repair,Reconditioning & ceramic tiles replacement of damaged PF bends of PF lines of units-3&4 boiler for the year 2022-23 as and when required.
Replacement of Worn out Grinding rolls Bull ring segments Vane wheel assembly Bull ring clamping ring Bowl extension ring and other connected mill internals and other repair works for Mill 1B and 1C of Unit I Boiler with necessary T and P and consumables during the year 2018 19
Set consisting of 03 items Compressor for RR 20100 CG(M). 1) Bracket Motor side to ELGI Part No.070300890 = 03 Nos. 2) Clamp cooler right to ELGI Part No.070408030 = 08 Nos. 3) Stud M16 x 60 to ELGI Part No.000465300 = 50 Nos.
Set of 02 items consisting of (1) V-Belt SPC2000, 110V Alternator - 16 Nos. (2) Compressor V-Belt C84 - 10 Nos. Make: PIX / FENNER / Roulands or equivalent with ISI Mark. Note: Year of manufacture of the v-belts should be printed on the top surface.
Spring loaded switch for compressor, used as BLCP [POS. No.172] type SBM- F/TUSO/21/22/R20 as per CLW Specification. No.CLW/ES/3/0075 Alt-B or latest and ABB Document No. HBTB 5604R2001 or latest if any for 3-phase locos.
Replacement of gravimetric feeder belts, replacement of head pulley bearings, coupling halves, studs, bronze and rubber bushes of main drive pulley coupling, opening of R.C. feeder doors and closing of R.C. feeder doors, replacement and overhauling ... main gear box of ...
Replacement of gravimetric feeder belts, replacement of head pulley bearings, coupling halves, studs, bronze and rubber bushes of main drive pulley coupling, opening of R.C. feeder doors and closing of R.C. feeder doors, replacement and overhauling ... main gear box of ...
Rectification of tube leaks in Unit-2 Boiler for the period 01.04.2026 to 31.03.2027
Rectification of tube leaks in Unit-1 Boiler for the period 01.04.2026 to 31.03.2027
Evacuation of accumulated ash from Unit 2 Boiler pent house during 2026 2027 Overhaul
Repairing/Servicing/Overhauling of Valves in Unit-2 Boiler for the year 2026-2027
Custom Bid for Services - RLA of shell type WHB, Custom Bid for Services - RLA of water tube boilers Similar Category Assets Insurance Service Assets Insurance Service
Handling of coal on running conveyor belts pertains to Stage-1and 2 of CHP by Picking of shale, stone, oversize coal and foreign material and transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) as and when required during the period from 01.04.19 to 30.09.19
Replacement of damaged deck sheets for the conveyor system 1C,1D,3C,BFC,3D,3E,3F,4A, 4B,4C,RSFD,6C,UC2,BF-1,BF-2,RBF-1,2&3,FC-1A,FC-1B,5A,5B,6A,6B,7A,7B,5C,5D,5E in MMSD- II of CHP/RTPP for the year 2025-26
Replacement of damaged deck sheets for the conveyor system 1C,1D,3C,BFC,3D, 3E,3F,4A,4B,4C,RSFD,6C,UC2,BF-1,BF-2,RBF-1,2&3,FC-1A, FC-1B,5A,5B,6A 6B ,7A, 7B,5C,5D,5E in MMSD- II of CHP/RTPP for the year 2024-25
Providing of patch repairs and carrying out of belt jointing works, edge repairs, relaging of pulleys and belt replacement works for the conveyor system from JT-5 to JT-9 and JT-9 to Bunker house in MMSD-III and MMSD-II of CHP/RTPP- estimate from August 2021 to March 2022.
PUMP IMO PART NO 1420120190, GUIDE VANE INLET PN 3001890280, DRAIN VALVE PN 1621317780, DRAIN VALVE PN 1621317781, DEMISTER PN 1621865000, FAN RADIAL PN 1635350000, COOLER OIL PN 1621848700, STRAINER PN 1621808500, FILTER PN 1621962703, VALVE BLOW OFF PN 9095052274, COUPLING PART NO 1623161680, CORE INTERCOOLER PN 1621992802, CORE INTERCOOLER KIT PN 2906907000, CORE AFTERCOOLER PN 1635232702, CORE AFTERCOOLER KIT PN 2906907100, CHECK VALVE KIT PN 2906051900, OIL CHECK VALVE PN 1420150345
Replacement of damaged mother and liner plates in 12A/B, 13A/B, 14A/B, 20, 21, 25 conveyors, vibrating feeders, hopper discharge chutes, hopper grid pieces, rail table platform, spill plates, chequered plates and I-Beam of weighment table of wagon tippler-5&6 in MM-I/CHP/Stage-III/Dr.NTTPS as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Replacement of damaged mother and liner plates in 12A/B, 13A/B, 14A/B, 20, 21, 25 conveyors, vibrating feeders, hopper discharge chutes, hopper grid pieces, rail table platform, spill plates, chequered plates and I-Beam of weighment table of wagon tippler-5&6 in MM-I/CHP/Stage-III/Dr.NTTPS as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Replacement of damaged mother and liner plates in 12A/B, 13A/B, 14A/B, 20, 21 and 25 conveyors, Replacement of damaged mother & liner plates in vibrating feeders, hopper discharge chutes, hopper grid pieces and rail table platform, replacement of spill plates, chequered plates and I-Beam of weighment table of wagon tippler-5&6 in MM-I/CHP/Stage-III/Dr.NTTPS as and when necessary during the year 2023-24 (FROM 01.04.2023 TO 31.03.2024)
Providing labor assistance for Emergency coal clearing of coal heaps in Wagon Tipplers- 1to 4, slurry coal, jammed coal and wet coal in crushers, vibrating screens& belt feeder chutes & poking of bunkers in M-1(conveyors), M-1(crushers),M-II & M-IV Sub-Divns./CHP(M.M)-I&II/Dr.NTTPS. as and when required during the period from 01.11.2024 or from the date of commencement of work to 31.03.2025 or till the exhaust of quantities
Set of spares for ELGI Make TRC 1000 MN Compressor consisting of (1) PIPE ASSY LH LP CYL- I/C to Part No: 00478410, Qty-01 No. (2) PIPE ASSY RH LP CYL-I/C to Part No: 000478400, Qty- 01 No. (3) I/C ASSY to Part No: 00032097А, Qty-01 No. (4) PIPE ASSY ... ( Compressor is ...
Providing Ground leveling with Men and Machinery, Spreading of Red Soil for Greenery, Painting to South side entrance ,west side entrance, DSA Building ,Compound wall and e-Seva Building and Repairs to Existing Ladies and Gents Toilets in IGMC Stadium. 1st Call
Honeycomb Tabletop - Magnetic, Passive support - automated pressure and level controlled including compressor
Breakdown and running maintenance works for Aluminum sheet and Insulation for ducts All elevations of primary air cold and hot hot secondary air and flue gas as and when required during the period from 01 04 2018 to 31 03 2019 Unit I Boiler including T and P and consumables
Removal and replacement of rotor shaft bearing assembly of ID Fan-1B with spare assembly fixing of all blades and complete alignment of fan and motor-1B of Unit-1 boiler with all T&P and consumables including removal and re fixing all insulation works during the year 2025-26
Services
Carrying out servicing/ overhauling /replacement of various sizes of LP /HP valves of units- 3&4 boilers during the annual overhaul period for the year 2026-27.
PROCUREMENT OF V-BELTS(D-298)FOR ECS-I AND II / STAGE.I AND V-BELTS FOR AC PLANT AND COMPRESSOR HOUSE SECTION / STAGE.II AND TRAINING INSTITUTE / DR.NTTPS AND SPACE WEDGE BELT SAVER SPC-4650(V BELTS) TO D-85-D MODEL ASH DISPOSAL PUMPS/STAGE-II
Procurement of Coal Compartment Assembly and Coal Nozzle for Fuel pipefor Boiler at NTPC Gadarwara
Repairing/Servicing/Overhauling of Valves in Unit-1 Boiler for the period 01.04.2026 to 31.03.2027
Custom Bid for Services - Reconditioning Of Rotors Of Main Air Blower, Custom Bid for Services - Reconditioning Of Rotors Of Control Air Blower, Custom Bid for Services - Reconditioning Of Rotors Of Wet Gas Compressor Similar Category Operation And ... Gas Compressor Station ... Gas Compressor Station ... Gas Compressor Station ...
ROIC Printer, Software along with Machinery and other Accessories. (Q3)