Loading…
Loading…
5,054 results • Best match
Regular and Periodical Maintenance of Conveyor System pertaining to SD I of EandM I
PROCUREMENT OF TYRE COUPLINGS FOR IAC & SAC IN COMPRESSOR HOUSE.
SWITCH/DISTRIBUTION BOARD, HCOS, ENGINE DIESEL ALTERNATOR AND COMPRESSOR AC
Spares for AC & REF PLANT, OVERHAUL KIT AC COMPRESSOR 5H120ETC
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas ) as and when required during the period from 01.04.2019 to 31.03.2020 for Unit-1 ... Unit-1 Boiler including ...
Annual Maintenance works Break down and repair works adjustment of eroded grinding rolls and other repair works for HP 1203 Bowl Mills as and when required and during the shut down of the Mills for the Mills for the year 2018 19 of Unit II Boiler
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas ) as and when required during the period from 01.04.2023 to 31.03.2024 for Unit-2 ... Unit-2 Boiler including ...
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas ) as and when required during the period from 01.04.2023 to 31.03.2024 for Unit-2 ... Unit-2 Boiler including ...
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas ) as and when required during the period from 01.04.2025 to 31.03.2026 for Unit-II ... Unit-II Boiler including ...
Breakdown and running maintenance works for Aluminum sheet and Insulation for ducts All elevations of primary air cold and hot hot secondary air and flue gas as and when required during the period from 01.04.2020 to 31.03.2021 for Unit I Boiler including T and P and consumables
Cutting and welding of MS plates to the PF bends lines on eroded portion and erection and removal of scaffolding in PF lines repair reconditioning and ceramic tiles replacement of damaged PF bends of PF lines of units 3 and 4 boiler for the 2024 2025
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas ) as and when required during the period from 01.04.2022 to 31.03.2023 for Unit-1 ... Unit-1 Boiler including ...
Overhaul works on Boiler pressure parts for replacement of eroded tubes of LTSH, Back-pass and Economizer Tubes and metal filling on eroded tubes where ever required after D-Meter survey, adjustment of Erosion protection shields at Unit-6 Stage-IV during annual overhaul period-2023-24
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas ) as and when required during the period from 01.04.2024 to 31.03.2025 for Unit-1 ... Unit-1 Boiler including ...
Removal and replacement of rotor shaft bearing assembly of PA fan # 2B with spare assembly fixing of all blades and complete alignment of fan and motor for PA fan # 2B of Unit -2 boiler with all T&P and consumables including removal and refixing all insulation works
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas ) as and when required during the period from 01.04.2025 to 31.03.2026 for Unit-1 ... Unit-1 Boiler including ...
Removal of damaged Rain water drain line of ESP A,B,C & D-Pass Roof and fabrication and erection Rain water drain line of ESP A,B, C & D-Pass Roof of Unit-2 Boiler including all T&P and consumables during the year 2025-26
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and fluegas ) as and when required during the period from 01.04.2022 to 31.03.2023 for Unit-2 Boiler including T&P and consumables
Replacement of damaged/worn-out LDO (80/ 100) pipe lines with newly fabricated bends, reducers, different sizes of Fuel oil pump house area to unit -1 Boiler along with necessary preparation of steam blowing and water flushing of LDO pipe lines during the year 2026-2027
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas) as and when required during the period from 01.04.2026 to 31.03.2027 for Unit-2 Boiler including T&P and consumables
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas) as and when required during the period from 01.04.2026 to 31.03.2027 for Unit-2 Boiler including T&P and consumables
Cutting and welding of MS plates to the PF bends lines on eroded portion and erection and removal of scaffolding in PF lines repair reconditioning and ceramic tiles replacement of damaged PF bends of PF lines of units 3 and 4 boiler for the 2025-2026
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Onboard INS Jalashwa; Repair on Lathe Machine Rotable Chuck Gland/Seal; Service Provider
Overhauling kits for 18 months of Compressor Type TRC-1000 DCM of M/s ELGI Part No.072403609 Complete set of Gaskets and rings - 1 set Consisting of 57 items: (Full description is as per in the Annexure enclosed in the documents).
Capital Repairs of SG Internals Pass-I of Two (2) 500MW Boilers of Stage-I and II during 2021-23 Overhauling at NTPC Simhadri.
Capital Repairs of SG Internals Pass-II of Two (2) 500MW Boilers of Stage-I and II during 2021-23 Overhauling at NTPC Simhadri.
Engaging of Hydraulic Excavator- EX 200 machinery on hire basis for temporary diversion of water to improvement of Infilteration Gallery at Adivarampeta Head water works in Srikakulam Municipal Corporation whereever and whenever required -under summer action plan 2025-26.
Engaging of Hydraulic Excavator- EX 200 machinery on hire basis for temporary diversion of water to improvement of Infilteration Gallery at Adivarampeta Head water works in Srikakulam Municipal Corporation whereever and whenever required -under summer action plan 2025-26.
Laying of 1100mm Dia Pumping Main from Mangalam filter house to Anjaneya Swamy temple balance length of 500 Rmt including pumping Machinery - 15th FC Grants - Annual Development Plants (ADPs) - Tied Grant -2022-23 (1st Installment) (2nd Call)(3rd Call)
2023-HOR01-CB-185 Taskforce for Engaging one no. of 6 Cmt. Tipper on hire basis for tree branches pruning, lifting the tree waste in zone-4 & 5 (suryabagh & Gnanapuram) including all machinery & Crew etc.,(Est Amount Rs.17.75Lakhs)
Supply of Sootblower gland packing sets and spiral wound gaskets for 800MW Boiler
Supply of Ballast Crushing of contractor's hardstone using mechanized crusher to 50mm gauge of 23391 Cum (as per specifications), transporting the same to Kantakapalli (KPL) station depot, unloading and stacking on level ground including dressing of ground and loading the same into Railway wagons at Kantakapalli (KPL) station depot under the jurisdiction of Assistant Divisional Engineer/ Track of Waltair Division.
"Supply and Spreading of Crusher dust, LDPE Sheet and 20mm HBG metal in LV PTR Bays of all 132/33KV Power Transformers & 220/132KV 100MVA Power Transformers-1&2 and Feeder bays of 132KV Rajanagaram, 132KV Peddapuram, 132KV R.V.K. Feeders, 132KV Mallaiahpeta-1&2 Feeders, 132KV Railway traction feeder and 132KV Nidadavole-1 Feeder at 220KV Sub-station, Bommuru in East Godavari District"
Supply and spreading of crusher dust, LDPE sheet and 20 mm HBG metal in all the 220KV bays(except 220KV Bhavojipeta) 220KV PT set-I & II bays under 2Nos 220KV bus sections duly including certain balance portion in the 132KV yard and also construction of curb wall along the boundaries of the metal spreading wherever necessary at 220KV SS Bommur
Up keeping of Mill rejects Trench and its conveyor belt of Unit-I&II including operation of top & bottom Mill rejects gates, cold air gates and removing of foreign materials from mills & chutes of Unit-I&II round the clock for the period from 01-04-2019 to 31-03-2020.
Up keeping of Mill rejects Trench and its conveyor belts of Units I&II including operation of top & bottom Mill rejects gates, cold air gates and removing of foreign materials from mills & chutes of Unit-I&II round the clock for the period from 01- 04-2017 to 31-03-2018.
Providing of patch repairs and carrying out of belt jointing works, edge repairs, relagging of pulleys, belt dragging and belt replacement works for the conveyor systems from JT-5 to JT-9 and JT-9 to Bunker house in MMSD-III/CHP/Dr MVR RTPP for the year 2025-26
Providing of patch repairs and carrying out of belt jointing works, edge repairs, relagging of pulleys, belt dragging and belt replacement works for the conveyor systems from JT-5 to JT-9 and JT-9 to Bunker house in MMSD-III/CHP/Dr MVR RTPP for the year 2025-26
Custom Bid for Services - ONE TIME REPAIR AND REFURBISHMENT OF 02 NO ELECTRICAL MACHINERY TEST STATIONS 75KW AND 100KW INCLUDING THEIR ALL UNITS SUB UNITS AND RESPECTIVE LOAD BANKS AND ONE GENERATOR TEST STATION AND ITS LOAD BANK 340KW INCLUDING IT..
Navarathnalu - Pedalandariki ILLU - Chevireddy Pally Village (Urban) - Jungle Clearance, Cutting the heaps and filling the dips by machinery - leveling the site and formation of Roads with Gravel from Ch.465.00 Mts to 545.00 Mts (From East to West) in Venkatagiri Municipality
Navarathnalu - Pedalandariki ILLU - Chevireddy Pally Village (Urban) - Jungle Clearance, Cutting the heaps and filling the dips by machinery - leveling the site and formation of Roads with Gravel from Ch.250 to 360.00 Mts (From East to West) in Venkatagiri Municipality
Navarathnalu - Pedalandariki ILLU - Chevireddy Pally Village (Urban) - Jungle Clearance, Cutting the heaps and filling the dips by machinery - leveling the site and formation of Roads with Gravel from Ch.0 to 250.00 Mts (From East to West) in Venkatagiri Municipality
Navarathnalu - Pedalandariki ILLU - Chevireddy Pally Village (Urban) - Jungle Clearance, Cutting the heaps and filling the dips by machinery - leveling the site and formation of Roads with Gravel from Ch.660 Mts to 720 Mts (From East to West) in Venkatagiri Municipality
Navarathnalu - Pedalandariki ILLU - Chevireddy Pally Village (Urban) - Jungle Clearance, Cutting the heaps and filling the dips by machinery - leveling the site and formation of Roads with Gravel from Ch.780 Mts to 810 Mts (From East to West) in Venkatagiri Municipality
Navarathnalu - Pedalandariki ILLU - Chevireddy Pally Village (Urban) - Jungle Clearance, Cutting the heaps and filling the dips by machinery - leveling the site and formation of Roads with Gravel from Ch.250 to 360.00 Mts (From East to West) in Venkatagiri Municipality
Engaging of Hydraulic Excavator- EX 200 machinery on hire basis for temporary diversion of water to improvement of Infiltration Gallery at Adivarampeta Head water works in Srikakulam Municipal Corporation where ever and whenever required -under summer action plan 2026-27
Providing Machinery to carry out miscellaneous works such as filling rain cuts, Gullis, Scoured portions and siphon portions, illegal pipes removing free board repairs and clearing catch water drains in deepcut reaches for Rabi Season in Basapuram Section of RBLLC.
Navarathnalu - Pedalandariki ILLU - Chevireddy Pally Village (Urban) - Jungle Clearance, Cutting the heaps and filling the dips by machinery - leveling the site and formation of Roads with Gravel from Ch.360.00 Mts to 465.00 Mts (From East to West) in Venkatagiri Municipality
Goods Transport Service – Per KM Based Service - Machinery & Equipment; Suitable for transporting 19 feet length 5 feet width 3 ton each CTs side by side; Suitable for transporting 19 feet length 5 feet width 3 ton each CTs side by side
Repairs and replacement of damaged insulation at various areas of Boilers in Units-3&4 during the annual overhaul period for the year 2026-27.