Different types of mechanical maintenance works of as and when required on Conveyor section MM-II sub division of CHP-III&IV/Dr.NTTPS as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Procurement of 415V,three phase 45kw Frame:280M 1470 RPM Vibrating Grizzling motor at crusher house-stage 3
Custom Bid for Services - Appointment of agent for participation in loading supervision jobs of boiler coal supplies from coal companies Ms Mahanadi Coalfields Limited MCL Ms Singareni Collieries Company Limited SCCL and other Coal India Limited CIL .., Custom Bid for Services - Minor Repair of Box Wagons at Ms Mahanadi Coalfields Ltd Talcher
Set of spares for ELGI Make TRC 1000 MN UG Compressor consisting of (1) PIPE HP CYL TO AFTER COOLER to ELGI Part No-070408200, Qty-01 No. (2) AFTER COOLER COMPLETE to ELGI Part No-070309690, Qty-01 No.
Repair kit for PR switch MCS 11(Low MR, RGCP, PAN-1, PAN-2, FP, Flow indicator, Direct brake, Vigiliance, Aux compressor, BP) to M/s. FTRTIPL part no. FT0051023-K02 consisting of 03 items as per attached Annexure-A.
Crushing of contractors hard stone using mechanized crusher to 50 mm gauge of 20000 Cum (as per specifications) transporting the same to Rayagada Depot unloading and stacking on level ground including dressing of ground and loading the same into Railway wagons at Rayagada Depot under the jurisdiction of Asst. Divl. Engineer/ Rayagada on Raipur - Vizianagaram line of Waltair Division.
Crushing of contractors hard stone using mechanized crusher to 50 mm gauge of 40000 Cum (as per specifications) transporting the same to BOBBILI Depot unloading and stacking on level ground including dressing of ground and loading the same into Railway wagons at BOBBILI Depot under the jurisdiction of Asst. Divl.Engineer/ Rayagada on Raipur - Vizianagaram line of Waltair Division
Providing labour assistance for clearing of jammed coal ,wet coal, slurry coal removed from crushers, vibrating screens & belt feeder chutes , Clearing of heavily accumulated coal heaps ,slurry coal on all the floors of crusher house for early restoration of various equipment in operation for uninterrupted supply of coal feeding to bunkers during rainy season for the year 2025-26
Different types Of mechanical maintenance works of emergency nature like replacement of fluid couplings , geared couplings , 150mm dia pipes , bearings of VGF ,bearings of RGRs and fabrication of lock plates , double scraper plates , idler frames etc ... in crusher house ...
Different types of mechanical maintenance works of emergency nature (like replacement of fluid couplings , geared couplings , 150mm dia pipes , bearings for VGFs bearings for RGRs and fabrication of lock plates, double scrapper plates , idler frames ... in crusher house ...
Different types Of mechanical maintenance works of emergency nature like replacement of fluid couplings , geared couplings , 150mm dia pipes , bearings of VGF ,bearings of RGRs and fabrication of lock plates , double scraper plates , idler frames etc ... in crusher house ...
Different types Of mechanical maintenance works of emergency nature like replacement of fluid couplings , geared couplings , 150mm dia pipes , bearings of VGF ,bearings of RGRs and fabrication of lock plates , double scraper plates , idler frames etc ... in crusher house ...
Providing assistance for uninterrupted coal coneyance from wagon tipplers 5& 6 to crushers and crusher to bunkers due to complete wet coal at different chutes,location and transfer points in General ?Sub-division/CHP/Stage-III & IV/DrNTTPS, as and when required during the period from 01.11.2024 or from the date of commencement of work to 31.03.2025
Annual Maintenance works Break down works and repair works for ESP of Unit I EERM, CERM and GD rapping gear boxes shaft bearings and drive as and when required during the year 2018 19 for Unit I Boiler including T and P and consumables
Replacement of Worn out Grinding roll assembly and Removal of wornout grinding roll reconditioning of Journal assembly ans Installation of new grinding roller with the reconditioned Journal assembly for HP 1203 Bowl Mills of Unit II Boiler with necessary T and P and consumables
Replacement of Worn out Grinding roll assembly and Removal of wornout grinding roll reconditioning of Journal assembly ans Installation of new grinding roller with the reconditioned Journal assembly for HP 1203 Bowl Mills of Unit II Boiler with necessary T and P and consumables
Repairs of secondary air duct (APH out let to wind box inlet) & Flue gas duct (Economizer outlet to APH and ESP outlet to Chimney area) at the boiler of Unit-II including T&P, consumables during the running and annual overhaul period 2025-26
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas ) as and when required during the year 2025-26 for Unit-1 Boiler including T&P and consumables
Repairs to secondary air duct APH outlet to windbox inlet and Flue gas duct Economizer outlet to APH and ESP outlet to Chimney area in the boiler of Unit I including T and P and consumables during the running and annual overhaul period 2018-19
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas ) as and when required during the year 2025-26 for Unit-1 Boiler including T&P and consumables
Replacement of Eroded and defective Water wall & Screen Tubes and Pin welding of pressure parts amd Metal build up on eroded portions of water wall tubes and coil tubes in Unit-5 Boiler-Stage-III-RTPP during annual overhaul period for the year 2022-23.
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas) as and when required during the year 2026-27 for Unit-1 Boiler including T&P and consumables
Erection of temporary platform inside furnace just above S Panel,Erection, shifting, dismantling of pneumatically operated Sky climbers and High pressure Jet cleaning of furnace water wall tubes, Providing of Shrouds for Unit-5 boiler during annual overhaul period for the year 2024-25
Repairs of secondary air duct (APH out let to wind box inlet) & Flue gas duct (Economizer outlet to APH and ESP outlet to Chimney area) at the boiler of Unit-II including T&P, consumables during the running and annual overhaul period 2025-26
Repairs to secondary air duct (APH out let to wind box inlet) & Flue gas duct (Economizer outlet to APH and ESP outlet to Chimney area) in the boiler of unit-1 including T&P and consumable during the running and annual overhaul period 2026-27
Repairs to secondary air duct (APH out let to wind box inlet) & Flue gas duct (Economizer outlet to APH and ESP outlet to Chimney area) in the boiler of unit-2 including T&P and consumable during the running and annual overhaul period 2026-27
Replacement of eroded and defective water wall and screen tubes, metal build up on eroded portions, Providing of SS shrouds, Rectification of cassette baffle plates and fin welding of pressure parts in Unit-3 boiler during annual overhaul period for the year 2025-26
Replacement of IPW and DMW joints and attachments in HTR and HTS coils and tubes necessary including HP welding in the areas like economizer, LTR, LTS, HTS, ITS, HTR, and Hanger platen coils of Units- 5 and 6 Boiler during Annual overhaul Period 2021-22
Erection of temporary platform inside furnace just above S Panel,Erection shifting dismantling of pneumatically operated Sky climbers and High pressure Jet cleaning of furnace water wall tubes Providing of Shrouds for Unit-5 boiler during annual overhaul period for the year 2024-25
Repairs to Hot primary air ducts (i.e. cross over ducts to common interconnecting ducts across 9th to 12 th floors ) in the boiler of unit- 1 during the running and overhaul period 2026-27 include insulation works ,Air cleaning and all T&P consumables
Overhaul works on Boiler pressure parts for replacement of eroded tubes of LTSH, Economizer tubes and metal filling on eroded tubes where ever required during D-meter survey, adjustment of Erosion protection shields at Unit-6 Stage-IV during annual overhaul period-2021-22
Repairs to secondary air duct (APH out let to wind box inlet) & Flue gas duct (Economizer outlet to APH and ESP outlet to Chimney area) in the boiler of unit-1 including T&P and consumable during the running and annual overhaul period 2024-25
Providing Machinery to carry out miscellaneous works such as filling rain cuts, Gullis, Scoured portions and syphon portions, illegal pipes removing free board repairs and clearing catch water drains in deepcut reaches in Ingaladahal Section of RBLLC.
Providing Machinery to carry out miscellaneous works such as filling rain cuts, Gullis, Scoured portions and syphon portions, illegal pipes removing free board repairs and clearing catch water drains in deepcut reaches in Ingaladahal Section of RBLLC.
SUPPLY, INSTALLATION, TESTING, DELIVER AND HANDOVER AT SITE OF PLC AND CALIBRATION EQUIPMENTS FOR SETTING UP OF REFERENCE CUM REPAIR FACILITY FOR IPMS IAC, IPMS SHAKTI AND PLC/ PCB REPAIR FACILITY AT MACHINERY CONTROLS DEPARTMENT, ND(V)
Supply of uniforms and tools or machinery for usage by Maintenance people of Indira Priyadarshini Municipal Stadium staff working including security house keeping and Hourticulture from dt 01 06 2025 to 31 03 2026 in Zone IV
2023-HOR01-CB-184 - Taskforce for Engaging One No. of 6 Cmt. Tipper on hire basis for tree branches pruning, lifting the tree waste in zone- III ( Asilmetta) including Greenbelt area and including all machinery & Crew etc.,
Capital Repairs of SG Internals Pass-II of Three 500MW Boilers of Stage-I and II during 2020-21 Overhauling at NTPC Simhadri.
Capital Repairs of SG Internals Pass-I of Three 500MW Boilers of Stage-I and II during 2020-21 Overhauling at NTPC Simhadri.
Custom Bid for Services - Fabrication of Consumable Items for Effluent Injection Pumps, Engines & Boilers for Surface installations Similar Category Repair and Overhauling Service
Supply of Straight tubes for RH, Economizer and DNPSH of 500MW Boiler
Overhauling of soot blower in Unit-2 Boiler during 2026-27 overhaul
HIRE CHARGES OF MACHINERY WITH MAN POWER FOR ONE YEAR FROM ACCEPTANCE OF TENDER WHEN REQUIRED TO MAIN TEMPLE, VARIOUS SUB TEMPLES, VARIOUS ADOPTED TEMPLES, INSTITUTIONS AND OTHER PLACES BELONGS TO SRI VENKATESWARA SWAMY VARI DEVASTHANAM, DWARAKA TIRUMALA
Engaging of Hydraulic Excavator- EX 200 machinery on hire basis for temporary diversion of water to improvement of Infilteration Gallery at Balaga Head water works in Srikakulam Municipal Corporationwhereever and whenever required -under summer action plan 2025-26.
HIRE CHARGES OF EARTH EXCAVATION AND LEVELING MACHINERY WITH MAN POWER DURING THE YEAR 2018-2019 WHEN REQUIRED TO VARIOUS SUB TEMPLES, VARIOUS ADOPTED TEMPLES, INSTITUTIONS AND OTHER PLACES BELONGS TO SRI VENKATESWARA SWAMY VARI DEVASTHANAM, DWARAKA TIRUMALA
Supply of 3.75 MT Sail Hard Plate - 12 mm thick and Cutting & Bending of Sheets into 144 Ribbons & Conveyor body's Bottom Plates as per required profile vide the sample & template provided towards Unit-6 AOH works on Ball Tube Mills: 6AB, 6CD & 6EF during the year 2023-24.
Providing of patch repairs and carrying out of belt jointing works, edge repairs, relaging of pulleys, belt dragging and belt replacement works for the conveyor systems from JT-5 to JT-9 and JT-9 to Bunker house in MMSD-III/CHP/RTPP for the year 2024-25
Lubrication grease (type: NLGI Grade 000) IRIX EP LSM 1500 of M/s. MOTUL Tech make (or) Centoplex GLP 200-000 of M/s. Kluber Lubrication make or its equivalent in M/s. Dow Corning/ Balmerol or similar for CNC Surface Wheel Lathe machine. Note: 1) One Kg Sample quantity should be got approved before effecting bulk supply. 2) Each Tin consisting of 5 Kgs.
Supply of Burner ignitor spares for BOIL
Supply, Installation & commissioning of four Telescopic chain conveyor Booms of 7.5-meter length sui