Loading…
Loading…
2,979 results • Best match
Transportation and installation of 800mm belt conveyor and haulage track in 4LS development district seam C at Kapildhara UG Mine of Hasdeo Area.
Supply, Installation, Testing and Commissioning of 225 TR Screw Compressor in Existing Installed Chiller at Medical College, AIIMS Raipur.
Supply, Erection and commissioning of complete arrangement of Pneumatic tools with pipeline, compressor & accessories at Satellite Depot, Nagpur/SECR.
LP CylInder 100 mm dia for TRC 1000 MN compressor ELGI part no. 00021010A. Specn: ELGI part no. 00021010A.
FAN GUARD ASSLY. FOR ELGI COMPRESSOR TYPE TRC-1000 MN TO M/S ELGI's PT.NO. 000212340.Spec:ELGI's PT.NO. 000212340
Custom Bid for Services - CAPITAL REPAIR OF CHUTES OF CONVEYOR BELTS OF SCREEN BUILDING, CAPITAL REPAIR OF WIND MAIN AND CAPITAL REPAIR OF SINTER MACHINE DUCT FROM WIND MAIN OF SINTER MACHINE-1 Similar Category Repair and Overhauling Service
Repairing of repairing of two No. 3 stage, Model T-1090, Gear Boxes, Sr. No. S/GB/26 n S/GB/27, 02 No. 1150 mm x 650 mm Conveyor Drums n 02 No. 1150 mm x 600 mm Conveyor drums n 01 No. Equalising Gear Set -02 Nos. in one set
1600221478 PUMP UNIT 125L PER MIN 250 DM PER MIN P 0.5MPA Part no. 9107.55.100.10, 1600025747 BRANCH PIPE FEED SLEEVE Part no. 1273.59.27, 1600575782 OUTER ECCENTRIC BUSHING Part no. 1275.01.329, 1600575784 ECCENTRIC BUSHING Part no. 1275.03.308, 1600015731 OUTER ELASTIC ELEMENT Part no. 1275.13.116, 1600015730 INNER ELASTIC ELEMENT Part no. 1275.13.115
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Double Excel
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Double Excel
General purpose Machinery oils Bidder Turnover (Last 3 Years) 1 Lakh (s) Experience Criteria 2 Year (s)
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Double Excel
Goods Transport Service – Per KM Based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Triple Excel
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Double Excel
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Double Excel
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Double Excel
Goods Transport Service – Per KM Based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Double Excel
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Double Excel
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Double Excel
Custom Bid for Services - 200144427 DEPLOYMENT OF HIGH-RISE TELESCOPIC CRANE FOR REMOVAL AND REFIXING OF CT GEARBOX DUE TO NON AVAILABILTY OF GANTRY NTPC KORBA Similar Category Operation and Maintenance Power House/Power Plant
Supply, installation and commissioning of CNC under floor wheel lathe (BG) with Shed , Shunter plus Winch machine on Turnkey basis as per section-I and II of Specification No. IR/CNC-UFWL(BG)/2026
Revamping of Material Recovery Facility (MRF) including installation of Machinery and construction of Compost Plant in Municipal Areas of BILAIGARH, Chhattisgarh 4th Call
Revamping of Material Recovery Facility (MRF) including installation of Machinery and construction of Compost Plant in Municipal Areas of CHHUKHADAN, Chhattisgarh(23rd Call)
Custom Bid for Services - Annual maintenance contract for repairingservicing of 04 nos coal crusher machine at coal laboratory in SECL Manikpur 365 days Similar Category Annual Maintenance Service - Photocopier Machine
Work of welding and fixing of pick holders and picks on crusher roll of various feeder breakers of Gevra CHP and Dipka unit CHP at Gevra Project for one year.
Maintenance of HT/LT overhead lines for power supply arrangement to feeder breakers, departmental semi-mobile crusher, contractual mobile crushers, weighbridges, Dipka Mechanized siding (FMC Project) at Dipka Expansion Project.
Custom Bid for Services - Work of reconditioning of Grizzly Feeder Vibration Shaft Bearing Housing in Crusher house -2 CHP NTPC Korba Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - 200138851Work of reconditioning of Grizzly Feeder Vibration Shaft Bearing Housing in Crusher house 2 CHP NTPC Korba Similar Category Operation and Maintenance Power House/Power Plant
Job contract for application of ceramic fibre sealing technology in penthouse and APH of 210 MW and 500MW Boiler Units at VSTPS
Procurement of spares for Seisa make APH gearboxes to be used in stage 3(1 X 500 MW) boiler unit at KSTPS.
Supply Cum Application of LRB Mattress Insulation along with Aluminum Cladding / Corrugated Sheet at Duct, Boiler and ESP Areas in NTPC Kahalgaon
Custom Bid for Services - OVERHAULING CONTRACT OF DUCTS GATES DAMPERS FANS AIR PREHEATERS OF ONE 01 UNIT OF 800MW BOILER AT NTPCLARA
Custom Bid for Services - 200128349 Deployment of service engineer for jointing of NMEJ in boiler ducting areas at NTPC Lara STPP Stg
Replacement of defective top brackets, top self aligning brackets, top rollers, bottom rollers and bottom self aligning brackets including rectification/ restoration for 1600mm wide belt conveyors of New CHP, Silo and Mini CHP sections at DEP.
Assistance in day to day mechanical maintenance work of all the running feeder breakers, associated belt conveyors and Bunkers in Mini CHP in all three shifts for a period of 365 days at Dipka Expansion Project.
Work of assistance in electrical repair and maintenance of PQ series of belt conveyors and associated vibro feeders, substation equipments, light circuits etc. in all three shifts for a period of one year at Gevra Project.
Work of assistance in electrical repair and maintenance of M series of belt conveyors and associated vibro feeders, substation equipments, light circuits etc. in all three shifts for a period of one year at Gevra Project.
Work of assistance in electrical repair and maintenance of JK series of belt conveyors and associated vibro feeders, substation equipments, light circuits etc. in all three shifts for a period of one year at Gevra Project.
Assistance in major shutdown/preventive/ breakdown mechanical maintenance works at various locations of conveyors, 20,000 Te. Bunker and TRS-1 sections of New CHP phase-1 and AC-4 Feeder Breaker for a period of 365 days on as and when required basis
Custom Bid for Services - Rebabbiting of 2 No eccentric unit of Primary crusher HEC Ranchi Make at Crushing Plant Dep5 Similar Category Repair and Overhauling Service Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Insitu Repair of Buttress Thread of Spare Head Shaft of Primary Gyratory Crusher Model KKD 1500B at Crushing Plant Dep5 Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Cleaning of fallen/spilled coal along 43N, -20W belt and loading the same in to Belt conveyor in 5A seam of West Jhagrakhand Colliery.
Installation, transportation and periodical shortening of 800mm belt conveyor and cleaning for proposed LHD depillaring panel (-)3LS at Kurja UG Mine of Hasdeo Area.
Cleaning of spilled coal from Feeder breaker No 2 and 3 and C3 and C6 belt conveyor of Bhatgaon CHP / Siding under Bhatgaon Area
Strengthening of approach road to Q series conveyor belt at tail end with RCC box culvert at Gevra Project of Gevra Area (2nd call)
Installation of 1000mm belt conveyor along 25ALS in proposed depillaring panel 30LS(LHCM Panel) in seam A at Kurja UG Mine of Hasdeo Area
Assistance required for day to day maintenance of Haulage Track line and belt conveyor in seam C at Kapildhara Ug Mine of Hasdeo Area
Cleaning of Spillage Coal and maintenance of conveyor belts i.e. D-6 and D-7 of Seam-V (Mahesh Incline) , NCPH Colliery New Mine.
Repairing of 02 nos Tail End Drum of C3 and C7 belt and 01 No Discharge drum of C8 belt Conveyor of Bhatgaon CHP
Assistance in operation of belt conveyor system of New CHP in all three shifts for a period of 180 days at Dipka Expansion Project.