Loading…
Loading…
7,171 results • Best match
Cleaning of drain of madhuban underpass, RRWS and Kutcha Nallah from Mudiyan Shop to conveyor 301 and Nudhkhurkee feeder breaker at ABOCP mine ABOCP under Block-II Area
Complete repairing/making of bearing housing and its block etc. of tail drum of unit no. 201 and 202 belt conveyor in RCB 00 level of Kathara Washery
Repairing of 08 nos. bearing block for for bearing 22228K and 07 nos. bearing block for bearing 22232K of different belt conveyor of main plant of Kedla Washery.
Repairing and maintenance of HT 11 KV O/H line of feeder No.-2 from Matigarha T/s to RRWS, JWTP upto conveyor belt under Block-II Area
Manual Picking up, removal of boulder, stones, metal pieces, shale etc. coming with raw coal from running conveyor belt on round the clock basis including Sundays and Holidays
Fabrication and Installation of cable tray unit C-2 conveyor belt (50 Meter) and cable tray B/W Thickener 1 and 2 (50 Meter) of Moonidih Coal Washery.
Custom Bid for Services - AMC for maintenance of the area of sumps and drain along the path of C16C17 belt conveyor in all three shifts at RJML CHP
Custom Bid for Services - Repairing of damaged wornout deck plate discharge chute of C2 C3 and fitting of top roller bracket in C2 C3 conveyor of Interim CHP
Custom Bid for Services - AMC for operation minor repairing of belt trailing cable handling greasing and lubrication of trippper conveyor C14C15 of RJML CHP in all three shifts
providing and fixing of HT bolt with nut and washer in main crusher roll shear hub of ATLAS COPCO make feeder breaker (Local Sl.No.2) installed at Tarmi siding under SDOCM
Custom Bid for Services - ARC for inspection and technical supervision consultancy of Atlas Copco make Air Compressors model ZR200 6 Nos Air Driers model MD600 3Nos and Air Receivers6 Nos with related piping and valves of CTPS
Custom Bid for Services - Deputation of Ex-BHEL Personnel for Technical Supervision of Works of Boiler Pressure Parts, Safety valves, Hangers and Welding Expert during Overhauling of Unit # 7, CTPS Similar Category Operation and Maintenance Power House/Power Plant
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COAL MINES; Repairing Replacement of damaged main grizzly of BTL Crusher and replacement of damaged wornout deck plate in C2 Conveyor of Rajmahal CHP; Service Provider
Proposal for Annual Rate Contract for manual picking of stones/boulders and other extraneous materials from running conveyors of 1A/1B, 2A/2B and 15A/15B and loading, transportation and unloading of the same of CHP of coal feeding path of BTPS-A.
Carriage of spillaged coal from the gallery and bottom areas of 301B and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Raj
Carriage of spillaged coal from the gallery of 1301 belt conveyors head drum and tail drum area by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at
Carriage of spillaged coal from the gallery and bottom areas of 301B and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Raj
Carriage of spillaged coal / boulder from the area in between tail side of 301A and 301B and area between tail side of 401A and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to nearby be
Carriage of spillaged coal from the gallery and bottom areas of 301B and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than 0.5 KM
Carriage of spillaged coal / boulder from the area between tail side of 301A and 301B and area in between tail side of 401A and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / c
Carriage of spillaged coal from the bottom area of 301 and 401 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged coal from the floor of 404A and 404B shuttle conveyors by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Was
Carriage of spillaged/ overflowed coal from the different equipments like chain/belt conveyors bucket elevators from the floors of 26 Mtrs 22 Mtrs and 16 Mtrs of PS-5 building by manual labour including loading unloading and stacking and loading of s
Carriage of spillaged coal from the floor of PS-11 bottom and gallery of 1101 and 1103 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.
Carriage of spillaged coal / boulder from the area between tail side of 301A and 301B and area between tail side of 401A and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute
Carriage of spillaged coal from the gallery of 1301 belt conveyors head drum and tail drum and tail drum areas by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less
Carriage of spillaged coal / boulder from the area between tail side of 301A and 301B and area between tail of 401A and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / su
Carriage of spillaged coal from the gallery and bottom area of 301B and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than 0.5 KM
Carriage of spillaged coal from the floor of PS-11 bottom and gallery of 1101 and 1103 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5
Carriage of spillaged coal from the gallery of 1201 belt conveyors head drum and tail drum area by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at
Carriage of spillaged coal from the bottom areas of 301A and 401A belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washer
Carriage of spillaged coal from the gallery and bottom areas of 301B and 401B belt conveyors by manual labour including loading, unloading and stacking and loading of stacked material to nearby belt/ chute/ suitable places for a lead less than 0.5 km
Carriage of spillaged coal from the bottom area of 301A and 401A belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa
Carriage of spillaged coal from the gallery and bottom areas of 301B and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Raj
Fabrication / Erection of top roller frame of different belt conveyors 40BC, 51BC by pass BC, Slurry BC, Clean Coal, Middling Coal BC and Clean Coal, Middling Coal Shuttle BC etc. work in Main Plant of Sawang Washery for a period of 06 months.
Carriage of spillaged coal from the gallery and bottom area of 301B and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajr
Carriage of spillaged coal from the bottom areas of 1204 and 1304 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washe
Carriage of spillaged/overflowed coal from the bucket/chain conveyors from the floor of 6 Mtr, 10 Mtr and 13 Mtr. of PS-5 building by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suit
Carriage of spillaged coal from the bottom area of 301A and 401A belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged coal / boulder from the area in between tail side 301A and 301B and area in between tail side of 401A and 401B belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / ch
Carriage of spillaged coal from the floor of 404A and 404B shuttle conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery wo
Carriage of spillaged coal from the floor of PS-11 bottom and gallery of 1101 and 1103 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less t
Dismantling, repairing and installation of 2 nos. Sump pumps (at each unit) and their discharge pipelines in tunnel of unit 501-A and tunnel of unit 105 belt conveyors along with cleaning of spilled coal around their sumps at Moonidih Coal Washery.
Carriage of spillaged coal from the bottom area of 301A and 401A belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washery
Carriage of spillaged coal from the bottom area of 1204 and 1304 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5 KM at Rajrappa Washer
Carriage of spillaged coal from the gallery and bottom tail drum side of 406 and 408 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute / suitable place for a lead less than
Carriage of already accumulated clean coal of WCP from top of roof shed of 1204 , 1304 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute / suitable place for a lead less than 0.5
Carriage of spillaged coal from the different equipments like chain belt conveyors and bucket elevators from the floor of 43M, 35M and 31M of PS-5 building by manual labour including loading unloading and stacking and loading of stacked material to n
Carriage of already accumulated clean and washed coal power from the top of roof shed of 1204 and 1304 belt conveyors by manual labour including loading unloading and stacking and loading of stacked material to belt / chute/ suitable place for a lead
Carraige of spillage of coal from the bottom area of 1204 and 1304 belt conveyors by manual labour including loading, unloading and stacking and loading of stacked material to nearby suitable places for a lead less than 0.5 km at Rajrappa Washery