Loading…
Loading…
7,171 results • Best match
Dismantling Fitting of carrying frame and return rollers and welding of carrying roller at 301 belt conveyor of ROM section at Madhuban Coal Washery under Block II Area BCCL
Replacement of discharge chute, liner plate and payjama chute of unit no. 902-1 belt conveyor at PS-9 building at Madhuban Coal Washery under Block-II Area, BCCL.
Replacement and repairing of discharge chute liner plate and pyjama chute of 902-1 belt conveyor at PS-9 building at Madhuban Coal Washery under Block-II Area, BCCL.
Rehandling of spillage materials from unit no. BC-01 and unit no. BC-02 belt conveyor gallery and deck of 5.0 MTPA Madhuband Coal Washery under Block-II Area.
Cleaning of spillage muck debris of M-1 and M-2 Belt conveyor at 8th dip to Jharkhand Bunker XVI Top Seam 500MH at Moonidih Colliery W. J. Area
Dismantling and Replacement of worn-out Tipper Drum above Silo no.1 along with repairing/ strengthening of its supporting structures for unit 702 belt conveyor at Moonidih Coal Washery.
Upkeepment of spilled materials from Tail end side of unit no. 301 belt conveyor, deck plates, gallery, return rollers etc. at Madhuban Coal Washery under Block-II Area, BCCL
Repairing/ Strengthening of Take-up Slider along with fencing of take-up structure and adjacent pillars for unit 301-B belt conveyor at ROM Section of Moonidih Coal Washery.
Complete dismantling, repairing and fitting of bearing block in head drum (left side and right side) of unit no. 60 belt conveyor of Raw Coal Section at Kathara Washery
Contract for Stone Picking from over running Conveyor belts and their segregation for a period of two years as per scope of work for Coal Handling Plant, CTPS, DVC.
Dismantling, repairing and refitting of 0 nos. tyre coupling of unit no. 1201 and 1301 brlt conveyor of PS-9 at Madhuban Coal Washery under Block-II Area, BCCL .
Repairing/ Strengthening of existing stringer channel, Stringer support, tail end drum structure etc. of unit 610 (Conveyor belt) at 7 M floor of Washery Building at Moonidih Coal Washery.
Repairing replacement of damaged deck plats side channels structure support of unit no 201 belt conveyor of ROM section at of Madhuban Coal Washery under Block II Area BCCL
Complete repairing of 05 nos. rake and pinion gate with drive arrangement of raw coal bunker of unit 121 B1 and B2 belt conveyor main plant of Kedla Washery
Fabrication and Installation of new Discharge chute after dismantling and removal of existing worn-out chute of unit 501-B and unit 502 belt conveyor at Moonidih Coal Washery.
Repairing extension of motor base structure for Tyre coupling fitting of unit no. 902-1 conveyor of PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL.
Upkeepment of spilled materials from unit 401 belt conveyor, deck plates, gallery, return rollers and tailend area at ROM section of Madhuban Coal Washery under Block-II Area, BCCL .
Repairing/ Strengthening of existing stringer channel, stringer support, tail end drum structure etc of unit 610 Conveyor belt at 7 M floor of Washery Building at Moonidih Coal Washery.
Shifting , positioning, erection and commissioning of auto sampler at 917belt conveyor in RLB section after making of its base, supporting structure etc. complete in RLB section of Kathara Washery.
Repairing and strengthening of secondary feed chute (Chute-B) after dismantling of damaged portion of existing worn-out feed chute for unit 903 belt conveyor at Moonidih Coal Washery.
Repairing/ Strengthening of receiving chute and side skirt board along with making of screw take-up system of unit 401 belt conveyor at ROM Section at Moonidih Coal washery.
Break-up-cum dismantling and Repairing and Fabrication of CI wheel and shaft of A side shuttle Belt conveyor in RCB top of Raw Coal Section of Sawang Washery.
Providing of materials and fabrication of trolley wheel of counter weight 1401 and 1402 unit conveyor belt of Loading section at Madhuban Coal Washery under Block-II Area, BCCL.
Break-up-cum dismantling and Repairing and Fabrication of CI wheel and shaft of B side shuttle Belt conveyor in RCB top of Raw Coal Section of Sawang Washery.
Strengthening and alignment of Rail tracks after dismantling of tipper and fitting back of tipper for unit 403-B belt conveyor under Raw Coal Section at Moonidih Coal Washery
Alignment, fixing, testing withdrawal and fixing of flange of Sr. no. 7038728, 200 KW, 3.3 KV motor make Toshiba to minimize vibration in 1018 conveyor under CHP-CPP/PPR.
Cold Vulcanizing, patching of all the belt conveyor and rubber lagging in ROM and transfer B/C in PCH Section of Sawang Washery for the period of one year.
Replacement of the Bend pulley Drum Assembly and 02 Nos. snub drum assembly after dismantling of existing worn-out drums for unit 502 belt conveyor at Moonidih Coal Washery.
Upkeepment of spilled materials along gallery of 1601 and 1602 belt conveyor up to middling cilo at PS-9 section of Madhuban Coal Washery under Block-II Area, BCCL
Rehandling of spilled materials from PS-1 building drain along 201 belt conveyor and fire fighting pond of ROM section at Madhuban Coal Washery under Block-II Area, BCCL .
Replacement of reclaimer carriage both wheel shaft assembly of Unit 103A and dismantling, repairing and installation of sump pump near 201 belt conveyor tail end at Moonidih Coal Washery.
Fabrication and Installation of new Take-up slider frame after dismantling and removal of existing worn-out take up slider of unit 701 belt conveyor at Moonidih Coal Washery.
Dismantling, repairing and fitting of bearing block in tail drum (Left side and right side) of unit no. 66 picking belt conveyor of Raw Coal Section at Kathara Washery
Repairing/ Strengthening and Replacement of discharge chute along with its side skirts after dismantling of existing worn-out chute for unit C-1 belt conveyor at Moonidih Coal Washery.
Repairing/ Strengthening and Replacement of discharge chute along with its side skirts after dismantling of existing worn-out chute for unit C-2 belt conveyor at Moonidih Coal Washery.
Upkeepment of spilled materials from 801 belt conveyor gallery deck plates, idler frame, return rollers brackets of PS-8 section at Madhuban Coal Washery under Block-II Area, BCCL
Transportation of Vishwa-1200 belt conveyor TC-9 M-2 from 8th dip and installation at 6th dip, XVI Bottom Seam-500 MH at Moonidih Colliery W. J. Area
Complete repairing/making of bearing housing and its block etc. of tail drum of unit no. 180 and 181 belt conveyor in RCB 0-0 level of Kathara Washery
Replacement of liner plate in discharge chute of unit no. 122, 121A and 121B belt conveyor and making stair case walk way in Post washery gallery main Kedla Washery
Upkeepment of 704-2 PS-9 side belt conveyor, deck plate , return rollers and ground area of PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL .
Complete repairing and overhauling of 400 A Prabhu make FLP type, ACB switch 440 V, Sl No.-1331 at Feeder Breaker - II conveyor belt motor Nadkhurkee under ABOCP Mine
Repairing/ Strengthening and Replacement of discharge chute along with its side skirts after dismantling of existing worn-out chut for unit C-1 belt conveyor at Moonidih Coal Washery.
Regular Maintenance Contract (RMC) of Repairing/ Maintenance of two nos. of weightometer model NWS-BS-100 installed on conveyor belts unit 201 and unit 903 at Moonidih Coal Washery.
Removing of spillage muck/debris along TC-7 belt conveyor from TC-6 tail end to new bunker EL -3 in XVI (B) Seam at Moonidih Colliery, W.J. Area
New making of 06 Nos. of plumber block to be used in tail end drum and loop-take-up drums of conveyor belt system of AMPC of Barora Area.
Strengthening and alignment of Rail tracks after dismantling of tipper and fitting back of tipper for unit 403-A belt conveyor under Raw Coal Section at Moonidih Coal Washery.
Repair and maintenance work after dismantling of gear boxes installed at Drive drum of unit 801-B and C-2 conveyor belts under section-V at Moonidih Coal Washery.
Complete repairing and overhauling of star delta starter of conveyor belt motor SL No-43/12-3 of Nadkhurkee Feeder Breaker No-I at ABOCP Mines, Block-II Area
Welding of carrying rollers and idler frame with deck plates of conveyor belt at unit no. 301 and 401 section at Madhuban Coal Washery under Block-II Area, BCCL .
Critical Structural Repairing/ Restrengthening and Functional Restoration of Tripper chutes and support frame work above Silo no. 1 and 2 of unit 702 conveyor system at Moonicih Coal Washery.