Loading…
Loading…
7,169 results • Best match
Modification and complete repairing of star Delta starter for conveyor motor of Feeder Breaker No.-02 along with pull cord at ABOCP Mine
Upkeepment of drain front side of PS-8 building and near 901 belt conveyor at Madhuban Coal Washery under Block-II Area, BCCL
Repairing of bearing housing and replacement of damaged bearing of 90KW hydraulic conveyor chain drive motor of feeder breaker (stand by) under SDOCM
Repairing and modification of Receiving chute and repairing/ strengthening of damaged tail-end platform of U-126 loading Conveyor, at Mohuda Coal Washery..
Repairing for fabrication, erection of conveyor structure both side angle, chanel etc of unit no. 51 in Raw coal section at Kathara Washery
Dismantling of R-7 belt conveyor structure for providing clean site for construction of new sub station of Gidi Washery under Argada Area.
Repairing/ Replacement of Discharge Chute after dismantling of existing worn-out discharge chute for unit 301-A belt conveyor at Moonidih Coal Washery
Fabrication and erection of tail drums structure of belt conveyor unit no. 52, 74 and 79 at Raw Coal Section of Kathara Washery
Supply and Fitting of cast Steel Gear Coupling both side for primary conveyor Belt of Mobile Feeder at BNR Siding Under ROCP/SJ
Repairing, Fabrication/Erection of Middling Coal BC Conveyor structure and Top roller frame dismantling repairing and refitting in Main Plant at Sawang Washery.
Repairing of 06 (Six) nos. bearing block for bearing 22220 EK of different unit belt conveyor of Hydro Cyclone Section at Kathara Washery.
Overhauling of APHMEL make TB-05 1000mm, 600TPH Conveyor Belt with drive Capacity 1 x 110kW, 550 Volts at Churi Colliery, NK Area
Upkeepment of 507 belt conveyor and surrounding area PS-5 section of ROM section at Madhuban Coal Washery under Block-II Area, BCCL.
Repairing/ Strengthening of base, Guide frame, ladder and its supporting structure of Sliding pulley of unit 704 belt conveyor at Moonidih Coal Washery.
Dismantling Transporting and fitting of counter weight of 301 belt conveyor at ROM section of Madhuban Coal Washery under Block II Area BCCL
Cleaning along Drive Heads and Tails ends of 6 No. of Conveyor belts in XVI T seam in production shifts on Daily Basis.
Complete repairing of 06 (six) nos. bearing block for bearing 22220 EK of different unit belt conveyor of RLB Section at Kathara Washery
Repairing, changing and overhauling of 268 belt conveyor discharge chute and 426 B/C flap gate in Hydro Cyclone Section of Kathara Washery
Supplying and Making Straight Through Cable Jointing 11KV 3 Core Cable of Controlling Main and Conveyor Belt CHP-111 at CK Siding/KOCP..
Repairing of head drum size 1600 x 1000 x 10 mm of unit no. 929 belt conveyor in RLB Section of Kathara Washery
Repairing of 02nos of feeder breaker chute, Bunker platform and conveyor belt structure repairing of feeder breaker no.1 at Phularitand AMP Colliery.
Repairing/ Strengthening of base, Guide frame, Ladder and its supporting structure of sliding pulley of unit 702 belt conveyor of Moonidih Coal Washery.
Repairing/ Strengthening of damaged portion of deck plate, stringer channel etc. of unit 401, 105 and 201 belt conveyor of Moonidih Coal Washery.
Fabrication / Erection and repairing of Top roller frame of different belts conveyor BC-04, BC-08, BC-09, BC-10 of Sawang Washery.
Release of Break of wagons, cleaning of chutes and conveyor during loading of rake at Madhuban Coal Washery under Block-II Area, BCCL
Provision of LPG Cylinder Filling facilities along with in-line allied equipment along with accessories and Conveyor System at Indane Bottling Plant, Jamshedpur
Upkeepment of materials from unit no. 1404 belt conveyor and its hopper tailend side at Madhuban Coal Washery under Block-II Area, BCCL.
Cleaning along Drive heads and Tail ends of 9 No. of conveyor belts in XVI(T) seam in production shifts on Daily Basis
Replacement of conv. belt 1000mm width of 303, 227, 415, 247 and 307 belt conveyor and joint vulcanized main plant of Kedla Washery.
Complete repairing of 02 nos. tail snub pulley (Dia400X1400mm) of unit no. 121B and 122 belt conveyor of main plant of Kedla Washery
Repairing of spure and pinion gear of unit no. 118A shuttle belt conveyor 02 (two) pairs of Pre-Washery section at Kedla Washery
Complete repairing of damaged 03 pairs of Gear coupling GC-12 for different units of belt conveyor of main plant of Kedla Washery.
Repairing/ Replacement of Discharge Chute after dismantling of existing worn-out discharge chute for unit 301-B belt conveyor at Moonidih Coal Washery.
Dismentling of old motor, installing and shifting of new motor and its coupling etc. of mini conveyor at RLB section of Kathara Washery
Structural Repairing / Re-strengthening and functional restoration of discharge chute and supporting framework of unit 301-B belt conveyor at Moonidih coal Washery.
Repairing/ Strengthening of Stringer channel, posts, bracing angle, deck plate and discharge chute for unit 801-A belt conveyor at Moonidih Coal Washery.
Work of full repairing of conveyor chain of IR make feeder breaker (local sl. no. - 01) at Tarmi siding under SDOCM, Dhori Area
Required cutting / welding of Impact Plate also box making in Impact plate by MS Plate at 1701 Intermediate Conveyor under CHP-CPP, Piparwar
Complete repairing of 03 nos. snub pulley dia (654X1400mm) unit no. 116 A and B belt conveyor of Pre-Washery at Kedla Washery
Repairing Erection and Fabrication of shuttle conveyor A Steel structure and replacement repairing of top roller frame in PCH Section at Sawang Washery.
For repairing/straightening of mast platform for the purpose of fitting new conveyor muffle of Drill DR-226 at AKWMOCP , KATRAS AREA, BCCL
Complete repairing of 08(Eight) nos. bearing block for bearing 23136K of different unit of belt conveyor of main plant of Kedla Washery
Repairing of one 630mm dia 1150mm length and one 630mm dia 1400mm length conveyor belt drum of feeder breaker of Muraidih AMP Colliery
Long term Maintenance Contract for Mechanical Maintenance of Equipment, Conveyor Belt Joining and Fabrication work at Coal Handling Plant of NTPC North Karanpura
Dismantling of chain sprocket, sprocket shaft, chain conveyor from Piparwar Project and refitting these into Elecon Feeder Breaker of KDH Project, NK Area
Upkeepment of drain front side of PS-8 building and near 901 belt conveyor at Madhuban Coal Washery under Block-II Area, BCCL .
Repairing/Strengthening/Replacement of roof structure and M.S.Sheet near head area and Tail area of Unit 105 conveyor belt at Moonidih Coal Washery
Repairing/strengthening of drive base structure of 902 1 belt conveyor of PS-9 at Madhuban Coal Washery under Block-II Area, BCCL.
SIDE TROUGHING IDLER OF SIZE 159MM DIA X 835MM LONG FOR 2000mm CONVEYOR AS PER S. No. 1 OF DRG. NO CEC (Q3)
Rehandling of spilled raw coal accumulated under and beside of the gantry of 133A and B belt conveyor of PreWashery at Kedla Washery