Loading…
Loading…
7,169 results • Best match
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Double Excel
Goods Transportation service - Monthly Based Service - Outside state; Machinery & Equipment; Mahindra Bolero Camper Tata Yodha or Similar
corrugated aluminium sheet SWG 22 for main boiler cladding size 3100x900mm (Q3), Plain aluminium sheet as per IS: 737 in roll form of size: 36 inch and thickness: 24 SWG (Q3), Aluminium sheet rolls thickness: 22 SWG width: 36 inch (Q3)
Repairing of hoist brake liner and fork new providing with pins and repairing of idler worn out material depositing bore making on lathe machine size ID290 X L260 std. size 260x260 of shovel 551.
Changing of Screw Conveyors in M/H section; AS MENTIONED IN ATC, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication of Screw Conveyor casing for Screw Conveyors with fitting in line in M/H section; AS MENTIONED IN ATC, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Changing/Reversing of beaters of Impact Mill A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Changing of side plate Impact Mill Rotor in A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication, dismantling, fitting of angular plates and bolt cover plates in Impact Mill A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication/dismantling and fitting of back plate; AS MENTIONED IN ATC, fitting of T plates in Impact Mill A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication of chute, dismantling and fitting of fabricated chute in Impact Mill A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Single deck screen changing in TDS of A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Double deck screen changing in TDS of A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication/repairing of return pipeline in A/B/C line including dismantling and fitting; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication of Impact Mill body with repair of rotor; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Changing of Head Drum/Shaft of Bucket Elevator; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Dismantling, fabrication and fitting of TDS s Bowel/Mouth; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Repairing jobs on Ball Mill s screen by resetting screen and fallen/damaged shell liners in A/C Line; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Repairing jobs in Pulveriser No 1/No 2; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Welding and Grinding of used Split Ring Gear Two Halves Teech profile; AS MENTIONED IN ATC, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Unforeseen breakdown in M/H Maint Section; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Changing of Impact Mill Bearing drive side or Non drive side; AS MENTIONED IN ATC
Repairing and Strengthening of bed frame, side plate along with replacement of drive shaft of unit 505-1 and 505-4 screen at crusher house building at Moonidih Coal Washery..
Dismantling, fabrication/erection, repairing of cable tray structure from ROM B/C tail end to ROM B/C head drum, BC-3 gallery and secondary crusher area of Sawang Washery.
Over hauling of crusher drum assly including replacement of splind ring and bearing in drum roll and other related Miscellaneous works in feeder breaker No. 2 at Jarangdih Siding, Kathara.
Repairing / rewinding of 90KW/125 HP, 440V, 1475 rpm ABB make induction motor in connection with secondary crusher roll of feeder breaker-2 installed at JRD rly siding under AKKOCP
Repairing of drive shaft bearing, bunker of rock braker and worm out sleeve bush check nut of crusher drum F/B at Kessurgarh siding ABOCP Mine under Block-II Area
Making high tension shear bolts with nut and washer for main crusher roll shear hub of Atlas copco make feeder breaker (local sl.No.02) installed at Tarmi siding under SDOCM
Loading and Transportation of coal from Purnadih surface stocks to KDH departmental crusher no. 1 and 2 and 3 and 4 for a period of 3 years of NK area.
Dismantling of 6inch and 8inch pipeline of main sump and old quarry and erection of 6inch pipeline in main sump and 1inch pipe for crusher at TSOCP under Hazaribagh area.
Repairing and reconditioning of 01 No. Kirloskar Pump make DSM 5B, 500 GPM, 60Mtr. Head at Mohan Nagar Pond for Sprinkling System at Dakra Crusher under Dakra Project, NK Area
Complete repairing and rewinding of 160 KW Induction Motor, 415 Volt, 272 Amp, 1485 RPM, Make Alstom, Sl. No. 265623390004 installed at IR Feeder Crusher under KDH Project, NK Area
Repairing of 400Amps ABC Electrical make, type NFLP ACB switch, 550Volts, Sl.No.NFLP/ABC/114 for controlling of Crusher Motor of KKC Link Feeder Breaker 01 No. of Phularitand, AMP Colliery.
Set of items for Auxiliary compressor mo [Set of items for Auxiliary compressor model no. CRC 150 Consisting of (1) Dipstick with plug CRC 150 ICRC ELGI part no. 000400540 (2) Plug drain 3/8 BSP CRC 150 ELGI part no. 000481220 make ELGI.]
Maintenance of Illumination and Enabling Facilities of Boilers 6, 7 and 8 and Maintenance of Ceiling fan of shops /offices,Exhaust fans of different locations and industrial blower of TPP and CPP of power plant
Maintenance of Illumination and Enabling Facilities of Boilers 6, 7 and 8 and maintenance of Ceiling Fans of shops / offices, Exhaust Fans of different locations and Industrial Blowers of TPP and CPP in Power Plant
Repair and maintenance removal of dust muck etc from the surrounding area of equipment and along the C18 and C19 belt conveyor and DH-4 at RJML CHP
Goods Transport Service – Per KM Based Service - Machinery & Equipment; Closed Body LCV Truck; CHT 19 FT 8 TO 10 TON, Goods Transport Service – Per KM Based Service - Machinery & Equipment; Closed Body LCV Truck; CHT 19 FT 15 TO 16 TON, Goods ... - Machinery & ...
Goods Transport Service – Per KM Based Service - Machinery & Equipment; Closed Body LCV Truck; CHT 19 FT 8 TO 10 TON, Goods Transport Service – Per KM Based Service - Machinery & Equipment; Closed Body LCV Truck; CHT 19 FT 15 TO 16 TON, Goods ... - Machinery & ...
the Carriage of spillage coal from the bottom areas of 301A and 401A belt conveyors by manual labour of stacked materials to belt/chute/suitable place for a lead less than 0.5 KM at Rajrappa Washery.
Repairing/ Strengthening of junction house adjacent to washery building comprising of unit 801-B and C-2 belt conveyors including its platform, fences, stairs and hand railing for safety point of view at Moonidih coal Washery
Carriage of spillaged coal /boulder from the area in between 301A and 301B and area between tail side of 401A and 401B belt conveyors by manual labour to stack material at suitable place at Rajrappa Washery.
Custom Bid for Services - Cleaning and rehandling of coal below the telescopic chutes at SILO and near the SILO railway tracks and 1019 belt conveyors Under CHPCPP Piparwar Similar Category Manpower Outsourcing Services - Man-days based
Brick masonry and other petty maintenance of Machine room of all 04 nos. boiler lifts of Power Plant at DVC, KTPS, Koderma.
Repairing and Re Conditioning of 1 inch Steam Pipe Line of Vertical Boiler No. BR 8644 at Chandmari Section of Bastacolla Colliery.
Construction of Pitroom and Dark Room for processing of radiography film during attending BTL/Overhauling of Boiler of BTPS (1x500 MW) Plant.
Dismantling of old CGI Sheet old workshop Girder Engle Rail 2 Nos Boiler Tower etc of Amal. Joyrampur Colliery under Lodna Area.
Custom Bid for Services - Rate Contract for 2 years for Boiler and its Aux for Unit 1 and 2 DVC KTPS Koderma
Custom Bid for Services - PHASED ARRAY ULTRASONIC TESTING PAUT FOR BOILER TUBE WELDING JOINTS Similar Category Hiring of Third-Party Inspection Agency
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
Fabrication and fitment of Railing Pipes of Boom repairing of damaged Catwalk Steps of Boom Walkway of Boom Machinery House Roof Dykes Hoist Rope Guard on Machinery House Roof etc of PH 2300XPA LR Shovel No RS15 of Rajmahal Project
Set of brackets for MEMU compressors. Set consists of 03 different brackets as per RDSO Drg. No. CG - K7181. Note:- One sample should be approved by consignee before supply of bulk quantity.
Repairing/ Strengthening of Take-up structure including its side stairs, columns and bracing angle for unit 801-A belt conveyor at Moonidih Coal Washery.
Repairing/ Strengthening of 2 Nos. feed chutes after dismantling of existing worn-out feed chutes for unit 903 belt conveyor at Moonidih coal Washery.
Fabrication, erection, repairing of BC-6, BC-7 feed chute, discharge chute, conveyor structure, roller frame etc. in Oversize restriction plant at Sawang Washery.
Upkeepemnt of materials from unit no. 1401 belt conveyor and its Hopper tail end side at Madhuban Coal Washery under Block-II Area, BCCL .
Complete repairing of 02 sets damaged/worn -out drive and driven sprocket and shaft assly. of 254 chain conveyor main plant of Kedla Washery
Repairing/ Strengthening, after dismantling of existing damaged portion of posts, Strenger channel, deck plate and walkway of unit 201 conveyor at Moonidih Coal Washery.
Release of break of wagons, cleaning of chutes, actuators and conveyor during loading of rake at Madhuban Coal Washery under Block-II Area, BCCL.
Fire Resistance Rubber Lagging with 15mm thickness of FR Rubber diamond grooved Sheet and Solution on Conveyor Drums in CCS Ckt. at Moonidih Project
Upkeepment of materials from unit no. 1404 belt conveyor and its Hopper Tail end side at Madhuban Coal Washery under Block-II Area, BCCL.
Repairing / replacement of cable guide way and reeling drum structure of unit 103A, 103B, 404A and 404B Raw coal reclaimer conveyor of Moonidih Coal
Repairing/ Strengthening of access platforms built on both sides of unit 702 conveyor situated above Silo no. 1,2 and 3 at Moonidih Coal Washery.
Replacement of damaged deck plate, side channels posts at 401 belt conveyor 0f ROM section at Madhuban Coal Washery under Block II Area BCCL
Work of dismantling/ changing/ repairing of damaged and worn - out mother and liner plates of unit no. - 158 Tripper conveyor trolly chute at SCW.
Upkeepment of materials from floor of belt conveyor unit no. 929 at PS-9 building at Madhuban Coal Washery under Block-II Area, BCCL .