Loading…
Loading…
7,169 results • Best match
Repairing, strengthening of drive base structure of conveyor no. 501-2 of PS-5 section at Madhuban Coal Washery under Block-II Area, BCCL.
Repairing of damaged vibrator assly. Primary conveyor bed and Idler bracket supporting structure of Atlas Copco Make F/B at DBOCP of CV area.
Providing RCC wall around the base of conveyor belt foundation of belt no. 1020 for protection from running vehicle under CHP CPP Piparwar Area.
Upkeepment of belt conveyor 1401 unit and its Hopper Tail end side at Loading section at Madhuban Coal Washery under Block-II Area, BCCL.
Upkeepment of spilled materials from 501-2 belt conveyor, deck plates, gallery return rollers etc. at Madhuban Coal Washery under Block-II Area, BCCL.
Fire Resistance Rubber Lagging with 15mm thickness of FR Rubber diamond grooved Sheet and Solution on Conveyor Drums in CCS Ckt. at Moonidih Project
Complete repairing of 03 no. non drive pulley of size (dia 800, length 1400mm) of 123 belt conveyor of main plant at Kedla Washery
Repairing, strengthening of tailend drum base structure of conveyor No. 1201 of PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL.
Upkeepment of materials from unit no. 1404 belt conveyor and its Hopper Tail end side at Madhuban Coal Washery under Block-II Area, BCCL.
Upkeepment of belt conveyor 1401 unit and its hopper tail end side at Loading section of Madhuban Coal washery under Block-II Area, BCCL.
Providing and fixing CGI in place of missed/damage CGI sheet from DH-3 to junction house (top of conveyor belt shed) under ROCP.
Preparation of bypass chute both side of conveyor belt 201 along with repairing / strengthening of its walkway and supporting structures at Moonidih Coal Washery
Making of high pressure (2600 PSI) hose for tensioning hydraulic pump of chain conveyor of Elecon make Feeder Breaker under KDH OCP, NK Area
Dismantling repairing and overhauling of tail drum size 1600 x 630 x 10 mm for 1304 belt conveyor under Loading Section of Rajrappa Washery
Repairing/ Strengthening and replacement of damaged structural members of Junction House between unit C-1 conveyor and NS-1 screen at Moonidih Coal Washery.
Upkeepment of spilled materials from unit no. 953 belt conveyor floor of PS-9 building at Madhuban Coal Washery under Block-II Area, BCCL .
Replacing of damaged discharge drum with new drum and fabrication of one 630mm dia and 12000mm length conveyor belt drum of feeder breaker, AMPC
Repairing and dismantling of roller and roller frame and roller fitted in unit no. 79 belt conveyor of Raw coal section at Kathara Washery
Repairing/ Strengthening of access platforms built on both sides of Unit-702 conveyor situated above Silo no.1,2 and 3 at Moonidih Coal Washery.
Repairing, changing and over hauling of chain sprocket and drum side sprocket of unit no. 905 belt Conveyor at RLB Section at Kathara Washery
Fabrication/Erection of steel structural work and repairing of top roller frame with refitting in stockpile belt conveyor in Main Plant at Sawang Washery.
Repairing, Changing and over hauling of chain sprocket and drum side sprocket of unit no. 949 Belt Conveyor at RLB Section of Kathara Washery
Erection and fabrication of discharge chute of 933 belt conveyor washed coal power side at 9 mtr level in RLB Section of Kathara Washery
Repairing, Fabrication/Erection of roller frame structure for BC-6 and BC-7 conveyor and chutes in over size restriction plant at Sawang Washery.
Repairing , strengthening of drive drum base structure of unit No. 301 belt conveyor of ROM section at Madhuban Coal Washery Block-II Area, BCCL.
Replacement of entire length of damaged conveyor belt of Unit no. 1402 in Loading section at Madhuban Coal Washery under Block -II Area, BCCL.
Complete repairing of 02 nos. take-up pulley (dia 800X1400) of unit no. 133A and 116B belt conveyor of Pre-Washery at Kedla Washery
Repairing/ Strengthening of walkway/non walkway, platform structures of unit 901 conveyor belt along with strengthening of its Drive assembly at Moonidih Coal Washery.
Repairing of tail drum size 950x500x10mm of 425 belt conveyor plus 4.8 Mtr. Level in section II at Hydro Cylone Section at Kathara Washery
Re-handling and cleaning of spilled coal around take-up area of 302, 303 and 304 belt conveyor of main plant of Kedla Washery
Transportation and installation of TATA-900 mm belt conveyor at E-9 TG of XVI(B) seam at 500MH in Moonidih Colliery, W.J. Area
Overhauling of 6.6kv panel and checking the motor connection cable, motor megaring and light run the motor properly of conveyor section under Govindpur Area
Repairing/ Strengthening and Replacement of damaged Discharge chute including its pyjama chute and changeover gate for unit-504 belt conveyor at Moonidih Coal Washery.
Cold Vulcanizing and patch repairs of different conveyor belts and rubber lagging of drums of raw coal and main washery plant of Kedla Washery
Repairing/ Changing of stringer channel, its support, deck and walkway of conveyor belt of unit 601 for 72 Mtr. Length of Moonidih Coal Washery.
Upkeepment of belt conveyor 1402 unit and its Hopper tail end side at Loading section of Madhuban Coal Washery under Block-II Area, BCCL.
Dismantling and New Conveyor Belt Secondary Belt 150 mtr length approx fitting jointing with Fastner for Mobile Feeder Breaker at BNR Siding ROCP SJ
Repairing / changing discharge chute head drum and tail drum base structure of unit 610 conveyor belt inside the washery building of Moonidih Coal Washery.
Upkeepment of spilled materials from unit no. 929 belt conveyor floor of PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL .
Upkeepment of materials from unit no. 1406 belt conveyor and its hopper tail end side at Madhuban Coal Washery under Block-II Area, BCCL .
Upkeepment of materials from unit no. 1404 belt conveyor and its Hopper tail end side at Madhuban Coal Washery under Block-II Area, BCCL .
Rubber lagging of different conveyor drums with 12mm thick rubber sheet of main washing plant at Madhuban Coal Washery under Block-II Area, BCCL .
Dismantling of 260 mtrs. Length of 1001 belt Conveyor for providing clear space for dumping in Q-2 Patch of Ashok OCP, Piparwar Area.
Repairing and dismantling of roller and roller frame and roller fitted in unit no. 79 Belt Conveyor of raw Coal Section at Kathara Washery
Repairing of 2Nos.of Feeder Breaker chute, Bunker platform and conveyor belt structure repairing of Feeder Breaker No.1 at Phularitand, AMP Colliery, Barora Area.
Repairing, fabrication and erection of conveyor structure both sides plate and channel etc. of unit no. 79 in Raw Coal Section of Kathara Washery
Repairing/ Strengthening of Take-up structure, side stairs and bracing of unit 702, 501-B and 801-A belt conveyor of Moonidih Coal Washery.
Complete repairing of 02 sets damaged/worn-out drive and driven sprocket and shaft assly. of 225 chain conveyor main plant of Kedla Washery
Repairing / strengthening of take up sliding frame, side stairs and column of unit 701, 201, 801A, 502, 901 belt conveyor of Moonidih Coal Washery.
Fabrication and erection of deck plate cross angle channel changing of unit no. 929 and 931 belt conveyor in RLB Section of Kathara Washery