Loading…
Loading…
5,515 results • Best match
Gear motor for Pre-Crusher M/c (Q3)
Procurement of Elecon spares for Crusher and Appron
Clamps Sleeves and Fins for Boilers for 500 MW Units of
Natural gas train skids for Thermax Make OIL Fired Boilers (Q3)
Procurement of coal nozzle tips for Stage-I Boilers (NTPC Rihand)
Lot-1: Rubber Conveyor Belt width 1000mm, Lot-2: Rubber Conveyor Belt width 800mm, Lot-3: Rubber Conveyor Belt width 600mm, Lot-4: Rubber Conveyor Belt width 700mm, Lot-5: Rubber Conveyor Belt width 500mm, Lot-6: Rubber Conveyor Belt width 450mm, ... Rubber Conveyor Belt ... Rubber Conveyor Belt
Providing and Fixing gear box main distribution control panel spare parts and Repairing of Clarifoculator at filter plant Nayagaon MPPMCL Jabalpur
Procurement of spares for Radicon Gear Box installed for Dam gate operation at Hydel Power Station 1x20 Mw BHPS MPPGCL Birsinghpur
Procurement of ash slurry pump gear box spares for AHP of 2X210MW Unit No 1 and 2 at SGTPS MPPGCL Birsinghpur
Procurement of Spares for Radicon Make Gear Box of Unit No 1 and 2 for PH I at SGTPS MPPGCL Birsinghpur
Procurement of Spares of M/s Triveni make Gear Box for TDBFP of 1X500 MW Unit No 5 SGTPS MPPGCL Birsinghpur
Procurement of Cubic Transmission make Gear Coupling (between Turbine and Gear Box) for TDBFP installed at 2X600MW , SSTPP, MPPGCL, Dongalia, Khandwa.
Repairing of 06 Number Track Drive Gear Box of SDL/UDM deposited in Regional Workshop from different unit of Johilla Area.
Procurement of hold back assembly for different type of gear box installed at 1x500 MW CHP II at SGTPS MPPGCL Birsinghpur
Dismantling and fitting of Rotary Gear Box , Timer shaft assembly and feed sprocket on IDM70E-16 Drill Machine at Nigahi Project.
COPPER WASHER FOR GEAR BOX, O/D - 32 MM, I/D - 27 MM, THICKNESS - 2 MM, DIN 7603. Accepted make - SELF
Custom Bid for Services - 200153433 Biennial Service Contract for Overhauling of Boiler Pressure Parts and Burners for Two Units of Stage I (2x800MW) Supercritical Boilers at NTPC Ltd Gadarwara Similar Category Operation and Maintenance Power House/Power Plant
Annual work contract for assistance in operation of equipment and auxiliaries of CHP 210 MW ATPS Chachai consisting of conveyor No. 21 A/B to 28 A/B including plough feeder, magnetic seperators, secondary crusher .....feeders
Assistance in various Day to Day Mechanical preventive and break down maintenance work of primary Gyratory crusher, Apron feeders and conveyor system of section-I, CHP, Jayant for a period of two year i.e. 730 days
Repairing of 01 No Greaves make U-1000 gearbox and 01 no Greaves make U-1200 gearbox at Jamuna 9 10 mine of Bhadra Sub Area, JK Area
Repairing of swing gearbox assembly, drag gearbox assembly, cracks in A-Frame and boom lower chord and other repairing works in Agni Dragline (24/88R) of Amlohri Project.
Tender for Providing and fixing of 02 Nos. monorail arrangement in Air Washer Building at floor EL 8.500 M, 02 Nos. monorail arrangement in Air Compressor Room at EL 23.00 M , and erection of I Beam Structure at ceiling of F O P H SGTPS Birsinghpur
Repairing of cracks in swing shaft housing no 3, swing gear box no 3 ,vertical wall near swing shaft housing no 3 and swing gear box no 3, vertical support plate of A-frame rear leg (RHS) and walk motor foundation plate 24-96 Ganga dragline of Jayant
CONVEYOR BELT WIDTH 1200 MM (Q3), CONVEYOR BELT WIDTH 1400 MM (Q3)
Conveyor belt: -1000 KN/M/5, Conveyor Belt 400 KN/M/4
Repairing of buttress threads of head and shaft assembly of primary gyratory crusher model KKD 1500B for crusher 39 of Jayant CHP.
Overhauling/part changing/servicing/maintenance and repair of Primary Gyratory crusher no. 2 and Old Crusher (PGC-1500H) installed at Amlohri CHP
Scroll Compressor
BA Compressor
Main Compressor
Compressor spares
AUXILIARY COMPRESSOR
EXTRA LARGE DANGRI BOILER SUIT (Q3), LARGE DANGRI BOILER SUIT (Q3), MEDIUM DANGRI BOILER SUIT (Q3)
Supply of Plastic Refractory for BoilerS of NTPC SSTPS,RhSTPS AND VSTPS
Breakdown maintenance of TG auxiliaries such as Turbine Side Pumps, Heat Exchanger and manway cover plate of HP Heater to arrest the feed water leakage from its cover and attending Tube Leakage for Unit 10 and 11 STPS, MPPGCL, SARNI
SUPPLY, INSTALLATION AND COMMISSIONING OF BELT SCALES FOR CHP CONVEYORS AT VSTPS.
Design, Engineering, Manufacture, Inspection, Testing and Supply of Metal Expansion Joints for compressors.
Boiler Oil Gun Assembly (Q3), BOILER OIL GUN TIP ASSEMBLY (Q3)
NYLON FABRIC CONVEYOR BELT 800 MM (Q3), NYLON FABRIC CONVEYOR BELT GRADE M 24 (Q3), CONVEYOR BELT NYLON FABRIC REINFORCEMENT (Q3), NYLON FABRIC OIL RESISTANT CONVEYOR BELT (Q3)
LV7 T-815 442-071-002-324 GEAR BOX, LV7 T-815 133- 330-414-405 HOSE JS 4X500 1111 ON 5412.02, LV7 T-815 990-115-005-000 MAGNETIC SWITCH-19024320, LV7 T-815 443-319-700-000 TRIPPER 24 V, LV7 T-815 9905-72- 0488527 RED REFLECTION GLASS 130 969 690 014
Supply of Air Compressor with Painting Gun and Pipe for STRU units.
Bi ennial Rate Contract for the work of spray insulation of various Turbine Modules, Valves, Heat Exchangers andAssociated Pipe Lines etc for AOH of Unit No 10 scheduled in Year 2024 and running maintenance of Unit No 10 and 11 of PH-IV STPS, Sarni
Bi-Annual rate contract for the work of spray insulation of various Turbine Modules, Valves, Heat Exchangers and Associated Pipe Lines etc. for AOH of Unit No. 10 scheduled in Year 2022 and running maintenance of Unit No. 10, 11 of PH-IV, STPS, Sarni
Bi-ennial Rate Contract for the work of spray insulation of various Turbine Modules,Valves,Heat Exchangers,Associated Pipe Lines etc. for AOH of Unit No 10 scheduled in Year 2026 and running maintenance of Unit No. 10 and 11 of PH-IV, STPS, Sarni.
CNC LATHE SOC 330 MM & CD 1150 MM FOR BHEL (Q3)
WORM GEAR PC-6 WORM GEAR (GEAR BOX SR. NO. 910965 MODEL: V500 GEAR R ATIO: 20/1 ORIENTATION: LY), WORM WHEEL PC-6
Hiring Inspection Vehicle for Light Machinery and E/M Sub-Division Rajgarh for inspection of Mohanpura, Bankpura and Mundla Project