Loading…
Loading…
5,517 results • Best match
M-17369 MANTLE LINER FOR HEC TERTIARY CRUSHER (Q3)
Procurement of Spares for KAY make Twin Lobe Rotary Compressors Model 1620 WC (Conveying Compressor) for AHP of unit 1 to 4 of PH-II and PH-I, at SGTPS MPPGCL Birsinghpur on single offer basis.
Boiler duct overhauling work AOH-2026
JOB CONTRACT FOR RLA OF 200 MW BOILER AND 500 MW BOILER AT SSTPS
Procurement of Boiler tube bends for Boiler of 1X500MW unit at SGTPS, MPPGCL, Birsinghpur.
Work proposal for complete refurbishment of bucket wheel drive gearbox and slew drive gearbox installed at Thyssenkrupp make stacker cum reclaimer at 4x210 MW CHP I at SGTPS MPPGCL Birsinghpur.
Procurement of high pressure seamless boiler tubes used at different zones of the boiler furnace in the boiler of 2x660 MW SSTPP Dongalia Khandwa
BOWL LINER FOR SECONDARY CRUSHER, DRG. 21/82, GRADE 3 MN STEEL, IS: 276-1992 (Q3)
supply of Crusher Hammer for CHP as per attached BOQ and Drawing and QAP.
Overhauling/ Part changing/Servicing/Maintenance and Repair of Primary Gyratory Crusher no. 1, no. 2 and Old Crusher (PGC-1500H) installed at Amlohri CHP
HR CONVEYOR BELT, 600 MM WIDTH X 3 PLY
SUPPLY OF RH SPRAY VALVES COMPLETE ASSY FOR STAGE-I BOILERS AT SSTPS.
US26126-KS-GR3/-10-15 -MAKE-INA ONLY- LINEAR RECIRCULATING ROLLER BEARING UNIT DESIGNED FOR HEAVY-DUTY LINEAR GUIDANCE SYSTEMS, CNC MACHINE TOOLS, AND PRECISION SLIDING MECHANISMS
Loading and transportation of coal from coal stockyard of Nigahi Project to semi-mobile crusher and crushing the same by semi-mobile crusher and loading and transportation of coal from semi mobile crusher to Nigahi wharfwall including wagon loading
Supply, Installation, Testing and Commissioning of Pneumatic Testing Unit along with Air Compressor
Conveyor Belt 400tph 1000mm 350 Mtrs (Q3), Conveyor Belt 400tph 1000mm 1000 Mtrs (Q3)
Repairing overhauling of 02 nos Hydraulic Pump 02 nos Rotation Assembly 02 nos Main Valve 02 nos Heat Exchanger 02 nos Hydraulic Motor 02 nos Control Valve Assembly of 02 nos HY and PNE Roof Bolter18KW 550V Radiant make of Rajendra UG mine
Procurement of Bearings of Make SKF/Schaffler for main drive Gear Box of Air Preheater of Unit No. 10 and 11, STPS, Sarni
Procurement of spares of Shanthi make gear box model No. BTN-160 installed at Stacker-reclaimer of CHP-210 MW ATPS MPPGCL Chachai
Work for replacement of I beam grouted with RCC in cooling tower for removal of gear box of 1x210 MW at ATPS Chachai.
Procurement of spares of M/s Triveni make gear box for TDBFPof 1x500 MW installed at Unit No 5 at SGTPS,MPPGCL BRS
CUT LATHE NAILS 1.8 MM X 15 MM TO IS-6734/72
Taper Roller Bearing for Vikram Lathe. P-Type, Cone No. 133075, Cup No. 138130P., Taper Roller Bearing Cup
Supply of Conveyor Belts for Coal Handling Plant
SUPPLY OF COMPRESSOR
Compressor oils (Q3)
Petrol Compressor Tester
Diesel Compressor Tester
Screw Compressor (Q3)
COMPRESSOR CHECK VALVE
Spares for Compressor
MOTOR FOR COMPRESSOR
Reciprocating Compressor Diaphragm
Oil refpack compressor
SPARE COMPRESSOR, DANFOS MAKE COMPRESSOR MODEL- SM185S4RC OR EXACT EQUIVALENT AS PER ANNEXURE-I (Q3)
SET OF MUST CHANGE (First year )MAINTENA [SET OF MUST CHANGE (First year )MAINTENANCE SPARES FOR M/S. FTIL MAKE COMPLETE AIR GENERATION & TREATMENT UNIT (AGTU WITH OIL FREE MAIN AIR COMPRESSOR & AIR DRIER) FOR MRVCII BT EMU RAKE & MEDHA RAKE; FTIL part no.FT0051401-K52; as per annexure attached. ]
SET OF MUST CHANGE (First year )MAINTENA [SET OF MUST CHANGE (First year )MAINTENANCE SPARES FOR M/S. FTIL MAKE COMPLETE AIR GENERATION & TREATMENT UNIT (AGTU WITH OIL FREE MAIN AIR COMPRESSOR & AIR DRIER) FOR MRVCII BT EMU RAKE & MEDHA RAKE; FTIL part no.FT0051401-K52; as per annexure attached. ]
Procurement of Boiler Drum safety valves installed at boiler of 1X500 MW, SGTPS, MPPGCL, Birsinghpur.
Procurement of Protection Shield Boiler PP Tube Shield and ProfileShield for Boiler Tubes (NTPC Rihand)
Steel structural work for complete dismantling, fabrication and erection of deck sheets,chequered plates with supporting structure along with foundation strengthening in Crusher house,conveyor 8C,9C,10C,11C,1C and 2C in CHP Phase-I and Phase-II
Procurement of Various conveyor pulley for Coal conveyor installed at Wagon Tippler system at SGTPS, MPPGCL, Birsinghpur.
MACHINERY (Q3)
Workshop Machinery
Procurement of ILP make valves spares for 500 MW Unit Boilers for NTPCVindhyachal.
Comprehensive Maint of EOT Cranes and Oil fire boilers under GE(East) Jabalpur