MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for 120 days from the date of commencement of works
MTPS I BM Unit II Boiler pressure parts COH 2024 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and allied works
MTPS I BM Unit III Boiler pressure parts AOH 2023 Disposal of Ash from Eco hopper deflection slope rear arch room boiler roof area and strengthening of Eco hopper supports with new pipes and allied works
MTPSI BM Unit I Boiler Pressure parts AOH 2023 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for 120 days from the date of commencement of works
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for 120 days from the date of commencement of works
MTPS I BM Unit III Boiler Pressure parts AOH2023 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for 120 days from the date of commencement of works
MTPS I BM Unit II Boiler Pressure parts AOH 2023 Rectification Replacement of defective tubes in burner corner water wall tubes and bends steam cooled side wall and fin welding at Boiler Ist IInd pass area
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for 120 days from the date of commencement of works
MTPS I BM Unit II Boiler pressure parts AOH 2023 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and allied works
MTPS I BM Unit IV Boiler pressure parts AOH 2025 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and allied works
MTPS I BM Unit I Boiler pressure parts AOH 2023 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and allied works
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and minor repair works of Boiler Lift II and its accessories for 120 days from the date of commencement of work
MTPS I BM Unit II Boiler pressure parts COH 2024 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and allied works
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and minor repair works of Boiler Lift II and its accessories for 120 days from the date of commencement of work
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for 120 days from the date of commencement of works
MTPS I BM Unit II Boiler pressure parts AOH 2021 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Reheater coil Overhauling of water wall soot blowers and LRSB
Item 1: GREASE SEAL RING FOR IMPACT IDLERS OF 2400 MM CONVEYOR (Q3), Item 2: DUST SEAL INNER FOR IMPACT IDLERS (Q3)
ECHS Dn Shot Blasting and Epoxy painting of conveyor Structure of BCN 55 with three coats Epoxy paint including supply of paints
ECHS Dn Shot Blasting and Epoxy painting of conveyor Structure of BCN 57 with three coats Epoxy paint including supply of paints
SUPPLY OF STRAIGHT TUBES OF COLD RE HEATER COILS IN UNIT I,II and III BOILER
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for 180 days from the date of commencement of works
Supply of High Pressure Valves of various sizes and grades for Unit IV V Boiler
Procurement of Spares for Water Wall Soot Blower for 600 MW Boiler of Unit I
SPECIAL REPAIRS REPLACEMENT OF CHIMNEY OF BOILER LAUNDRY PLANT AT MH CHENNAI UNDER GE STM
REPLACEMENT OF BOILER (MILL SIDE) FD FAN SUCTION CASING WITH DELIVERY DUCT LABOUR CONTRACT WORK
Goods Transport Service – Per Trip based Service - Machinery & Equipment; 20FT Trailers; 20FT Trailers, Goods Transport Service – Per Trip based Service - Machinery & Equipment; 40FT Trailers; 40FT Trailers
ALIGNMENT DECK CONVEYOR ONE PAIR COMPLETE CHAIN WITH SQUARE TUBE ATTACHMENTS REPLACEMENT WORK AT TNPL UNIT - II
ICHP- Removal, cleaning and disposal of the spilled and accumulated coal in Conveyor-25A and B area
Labyrinth Rings both Inner & outer for the Impact idlers of 2000/1800 MM Conveyor as per Drg
ICHP- Replacement of worn out liner plate and parent plate in receiving chute of Conveyor-59A B
Repair and Servicing And Maintainnace of motor, Conveyor and all other Machinaries in MCC at Zone-3
MTPS I CHP I Replacement of worn out coal flow hitting plates in conveyor 7A and 7B
ICHP- Assisting work for renewal of weak joint and normalizing the system in Conveyor-49 and 63.
General Fund 2024-25 Construction of Foundation Bed For Conveyor in RR Park in Sulur Town Panchayat
Conveyor Bearing Checking and Grease Changing in Bagasse Yard at Pulp Mill - Mechanical in TNPL Unit - I
Revamping of Chain Conveyor System and Filling Shed facilities at CPCL LPG Bottling Plant Manali Tamil Nadu
CENTRE TROUGHING IDLER OF SIZE 193.7 MM DIA X 530 MM LONG FOR 2400 MM CONVEYOR (Q3)
SUPPLY OF CRAWLING WHEEL SUPPORT CHANNELS FOR UNIT IV SCRAPPER CONVEYOR FEEDERS 4A1 and 4A2 and 4B2
ECHP-I- Attending mechanical maintenance works in Conveyor-19,45,47, 62 (Paddle Feeder) BFD-8 and RBFD-11
Supply and Erection of prepainted galvanium Roof Sheets, Top and Side Supports for the Conveyor 24A/B
ICHP Removal, cleaning and disposal of the spilled and accumulated coal in Conveyor25AB area, conveyor equipments, etc.
Sealing plate of size 2280 x 1250 x 4 mm for ECHS Conveyor BCN 58A and 60
Fabrication and Supply of rubber lagged Troughing idler roller for 1400 mm width conveyor 17 and 19
Dismantling and disposing of old RCC salt cake conveyor and old pulp mill staircase on sale basis
Live bottom conveyor belt changing works in bagasse yard at Pulp Mill-Mechanical in TNPL Unit-I
TTPS- ICHP-Replacement of defective bend pulley with the available SH pulley in tripper of Conveyor-59B
ICHP- Removal, cleaning and disposal of the spilled and accumulated coal in Slope Conveyor-26A and B
CENTRE TROUGHING IDLER OF SIZE 219.1MM DIA X 670 MM LONG FOR 2400 MM MII EXPANSION CONVEYOR