Loading…
Loading…
13,532 results • Best match
MTPS I BM Unit I Boiler Pressure parts AOH 2026 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
MTPS I BM Unit II Boiler pressure parts AOH 2022 Disposal of Ash from Eco hopper deflection slope rear arch room and boiler roof area and strengthening of Eco hopper supports with new pipes and allied works
MTPS I BM UNIT III Boiler Pressure parts AOH 2021 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
MTPS I BM Unit I Boiler pressure parts AOH 2026 27 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and allied works
MTPS I BM Unit I Boiler Pressure Parts AOH 2019 Disposal of Ash from Eco hopper deflection slope rear arch room and boiler roof area and strengthening of Eco hopper supports with new pipes and allied works
OIL SEAL DIN3760 AS, OIL SEAL BAUM5X7, OIL SEAL, O- RING 150X1.5, O-RING 188X2, O-RING 135X2.5
Overhauling of wind box, SADC and AC / DC scanner fans of Unit IV Boiler during overhaul 2018 - 19
STEEL CORD BELT ST 1600 FOR 1500 MM WIDE CONVEYOR WITH TOP COVER 14 MM, BOTTOM COVER 10 MM. DETAIL
GEARBOX 75KGM
ECHP-II- Loading of 100 mtrs. SH belt at Central Stores TTPS with specification f 1800mm BW 5 ply, 5 3, 1800 KN N, Nylon Nylon and transported to Conveyor-72 and erected in Conveyor-72 for replacing the damaged belt
TTPS -ECHP-II- Loading of 100 mtrs. SH belt at Central Stores/TTPS with specification of 1800mm BW, 5Ply, 5/3, 1800 KN/N, Nylon/ Nylon and transported to Conveyor-73 and erected in Conveyor-73 for replacing the damaged belt
ECHP-II- Loading of 100 mtrs. SH belt at Central Stores/TTPS with specification of 1800mm BW, 5Ply, 5 3, 1800 KN N, Nylon Nylon and transported to Conveyor-73 and erected in Conveyor-73 for replacing the damaged belt
MTPS I CHP II Breakdown work preventive maintenance works in conveyors 10A 10B BFD 9A and 9B JT1 and JT2 tail end for a period of 120 days
Custom Bid for Services - Testing & Certification of Conveyors and Lifting tools &Tackles at TPS-II Similar Category Testing Service for On-Board/Commissioned Equipment/Instrument related to Plant
Custom Bid for Services - Safety Testing Certification of Conveyors and Lifting tools Tackles at TPSII Similar Category Testing Service for On-Board/Commissioned Equipment/Instrument related to Plant
Pruchase of SWM Machinery in Desur Town Pancyat
Custom Bid for Services - Outsourcing of Boiler, Turbine and Auxiliaries - Local Operation & Cleaning works in Units 1 & 2 of NTPL (2 x 500 MW) Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
TTPS Operation Circle Chemical Division Collection of Coal Samples from Bunker of all the 5 units Coal Jetty I Collection of Pulverised Coal samples for Sieve analysis Collection of MOT oil Lub Oil samples and other oil samples like Mill Gear Box O
MTPS I TM Unit III Overhauling of OLCTC System Pump LHS RHS Overhauling 1600 mm Butterfly valve and its actuator gear box of cooling water inlet and outlet pipe lines in condenser Inspection Cleaning of Condenser CW box steam side Hot well etc
MTPSI TM Unit I Overhauling of OLCTC System Pump LHS RHS Overhauling 1600 mm Butterfly valve and its actuator gear box of cooling water inlet and outlet pipe lines in condenser Inspection Cleaning of Condenser CW box steam side Hot well etc
MTPS I CHP I PCR A Replacement of the damaged and removed bottom portion of the primary crusher discharge hopper and allied works
Supply and Erection of RBFD 20 forward chutes Top A and B Middle A and B Bottom portion at Secondary Crusher House I
TTPS- ECHP-II- Passenger cum freight lift erected at Secondary Crusher House-II preventive maintenance contract for the period from 01.04.2023 to 31.03.2024.
TTPS- ECHP-I- Replacement of worn out and damaged screen clamp bar by a new one in Crusher B C at SCH-I
TTPS- ECHP-I- Annual Maintenance Contract of passenger cum freight lift at Secondary Crusher House-I for the period from 01.04.2023 to 31.03.2024.
MTPS I M II CHP I Reconditioning of damaged worn out uneven size support wheels 4 Nos released from Primary crusher A B
MTPS I CHP II Replacement of wornout SS liner plates CCC wear plates and MS mother plates in Secondary crusher B1 and B2
MTPS I CHP II Preventive and breakdown maintenance work of roller screen A1 B1 and B2 secondary crusher A1 A2 B1 and B2
Installation, Testing and Commissioning of Electrical Equipments at Boiler area of RSPS2 in TNPL Unit I
Supply of High Pressure Valves of various sizes suitable for Unit I, II and III Boiler
Removing of Bed ash generated in power Boiler # 4, 5 and 6 at Energy Dept Process.
Supply, Erection and Commissioning of Turmeric Boiler and Polisher at Erode Regulated Market in Erode District.
Guide Pipe and diffuser assemblies for Oil gun and End Air Nozzles of Unit I Boiler
Pressure parts tubes and bends for 210 MW capacity Boiler in Unit I II and III
Replacement of Air Nozzles and coal nozzles with cap in Boiler#4 at TNPL Unit 1
Intercarting of Bed ash Rejects generated from Power Boiler # 6-7 to LSFM at Energy Process.
SUPPLY OF SUPPORT CLAMP ASSEMBLY SUITABLE FOR ECONOMIZER COILS OF UNIT I, II and III BOILER
Renovation and strengthening of RCC Chimney in Boiler #6 upto 90.0mtr height at TNPL Unit I
Application of Castable Refractory and Plastic Refractory in Boiler # 4, 5, 6 and 7 Furnace area.
Replacement of HP Heater copper gasket in Boiler # 6 at Energy Mechanical in TNPL Unit -1.
Repair and Maintenance works to the Boiler Feed Pump Control Room in Unit 1 to 3
Supervisory services of Ex-BHEL / Expert Personnel for OH works of two 500MW boiler and auxiliaries
DESIGN, SUPPLY, ERECTION AND COMMISSIONING OF LIGHTNING PROTECTION EQUIPMENT AT STRIPPER PLANT AND UTILITY BOILER ROOF
MTPS I BM Unit I to IV Boiler Pressure Parts Safety Valve floating during AOH 2025
SUPPLY OF COAL NOZZLE CASTING AND FORGED C CLAMP FOR OIL GUN FOR UNIT V BOILER
Manufacturing, Supply, Erection and Commissioning of Electric Steam Boiler for MFL, Bio Fertilizer, Jigani, Bengaluru - 560105.
Supply of Saw Cut Fins for Radiant Roof Tubes in boiler Unit I II and III
Supply of Chemical Filtration System for Boiler 8 of RSPS 2 Project at TNPL Unit I
NCTPS II 2 X 600 MW MI Circle BM Unit II Boiler Annual Overhauling of Coal